The Prospector News

Quiulacocha Tailings 40-Hole Drill Campaign: Full Speed Ahead !

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Quiulacocha Tailings 40-Hole Drill Campaign: Full Speed Ahead !

 

 

 

 

 

We are excited to report that Cerro de Pasco Resources Inc. (CDPR) is making significant progress in our Quiulacocha Tailings 40-Hole Drill Campaign. The first batch of drill samples has been safely transported to Lima for geochemical testing. Initial results expected soon will reveal metal concentrations and for the first time involve sampling at foundation depth using 60-element geochemical assays.

 

First drill samples from Quiulacocha Tailings ready for shipment to Bureau Veritas

 

To support our drilling program, we are pleased to introduce a Sonic Drill, which provides continuous, high-quality samples with minimal disturbance and no water usage, reducing environmental impact, enhancing resource recovery, and improving data quality.

 

We remain on track to complete the 40-hole campaign during this dry season, lasting until the end of October, with spirits high as we advance towards our goal!

 

In the upcoming phase, to prevent oxidation and preserve microstructural integrity, samples will be stored and transported to Lima in freezer containers, preventing lab delays and maintaining momentum.

 

 

Upon arrival in Lima, samples will be dried and assayed at the Inspectorate Services Lab (Bureau Veritas). Once geochemical and mineralogical testing is completed, select samples will be blended into representative composites and sent to Bureau Veritas Antofagasta (Chile) for advanced metallurgical testing.

 

 

Meanwhile, CDPR has successfully concluded Phase 1 of our geophysical studies, covering the dry area of the Quiulacocha Tailings, with exciting findings: depth readings range from 20 to over 40 meters in certain areas.

 

3D view of the Quiulacocha TSF, the drilling locations (red dots), the El Metalurgista concession (magenta line), and the geophysical profiles acquired and interpreted to build the 3D solid of the TSF foundation

 

Our aim is to collect over 1,000 samples offering a detailed overview of the project’s potential. We look forward to keeping you in the loop as we progress!

Posted September 27, 2024

Share this news article

MORE or "UNCATEGORIZED"


Contango Announces Results for the Quarter Ended March 31, 2026

Contango Silver and Gold Inc. (NYSE-A:CTGO) (TSX: CTGO) announced... READ MORE

May 14, 2026

NevGold Intercepts Consistent Oxide Antimony-Gold Mineralization in All Drillholes From Historic Crushed Leach Pad Including 0.32% Antimony And 0.39 g/t Au Over 14.9 Meters

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleas... READ MORE

May 14, 2026

Guanajuato Silver Accelerates Gold Loan Repayment

Guanajuato Silver Company Ltd. (TSX-V:GSVR) (OTCQX:GSVRF) is plea... READ MORE

May 14, 2026

Aya Gold & Silver Reports Q1-2026 Results with Record Revenue and Cash Flow

Aya Gold & Silver Inc. (TSX: AYA) (NASDAQ: AYA) announced its... READ MORE

May 14, 2026

Sun Summit Acquires 51% Ownership Share in the New Orbit Project, Toodoggone Mining District, B.C.

Sun Summit Minerals Corp. (TSX-V: SMN) (OTCQB: SMREF) is pleased to anno... READ MORE

May 14, 2026

Copyright 2026 The Prospector News