The Prospector News

Sierra Madre Announces Revenues in Excess of US$2.4 Million from Sustained 350 Tonne per Day Production at La Guitarra

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Sierra Madre Announces Revenues in Excess of US$2.4 Million from Sustained 350 Tonne per Day Production at La Guitarra

 

 

 

 

 

Sierra Madre Gold and Silver Ltd. (TSX-V: SM) (OTCQX: SMDRF) is pleased to announce the Company has generated in excess of $2.4 million in revenues since the commencement of the test mining and milling phase at the Guitarra mine complex. Daily throughput rates of economically interesting silver and gold mineralization have averaged 350 tonnes per day over the past 30 days. All amounts presented herein are expressed in United States Dollars, unless otherwise stated.

 

Chief Financial Officer, Ken Scott commented, “This marks a significant financial milestone for Sierra Madre. The Guitarra team is continuing to do a great job of incrementally increasing the daily production rate. Our next test mining and processing goal is 400 tonnes per day, followed by commercial production of 500 tonnes per day before year end.”

 

Test mining and processing has been in continuous daily operation since June 25th, 2024. A total of 27,990 tonnes of material containing economically interesting silver and gold mineralization has been processed as of September 20, 2024. Eight (8) shipments totalling 466 dry metric tonnes of silver-gold concentrate have been delivered to MRI Trading. Provisional payment gold and silver concentrate grades continue to range from 2,752 g/t to 3,442 g/t silver and 28.65 to 38.45 g/t gold. Final assay grades will be determined upon shipment to the smelters.

 

About Sierra Madre

 

Sierra Madre Gold and Silver Ltd. is a precious metals development and exploration company focused on evaluating the potential of restarting the Guitarra mine in the Temascaltepec mining district, Mexico, and the exploration and development of its Tepic property in Nayarit, Mexico. The Guitarra mine is a permitted, past-producing underground mine, which includes a 500 t/d processing facility that operated until mid-2018.

 

The +2,600 ha Tepic Project hosts low-sulphidation epithermal gold and silver mineralization with an existing historic resource.

 

Sierra Madre’s management team has played key roles in managing the exploration and development of more than 22Moz gold and 600Moz silver in combined mineral reserves and mineral resources. Sierra Madre’s team of professionals has collectively raised over $1 billion for mining companies.

 

Posted September 24, 2024

Share this news article

MORE or "UNCATEGORIZED"


Contango Announces Results for the Quarter Ended March 31, 2026

Contango Silver and Gold Inc. (NYSE-A:CTGO) (TSX: CTGO) announced... READ MORE

May 14, 2026

NevGold Intercepts Consistent Oxide Antimony-Gold Mineralization in All Drillholes From Historic Crushed Leach Pad Including 0.32% Antimony And 0.39 g/t Au Over 14.9 Meters

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleas... READ MORE

May 14, 2026

Guanajuato Silver Accelerates Gold Loan Repayment

Guanajuato Silver Company Ltd. (TSX-V:GSVR) (OTCQX:GSVRF) is plea... READ MORE

May 14, 2026

Aya Gold & Silver Reports Q1-2026 Results with Record Revenue and Cash Flow

Aya Gold & Silver Inc. (TSX: AYA) (NASDAQ: AYA) announced its... READ MORE

May 14, 2026

Sun Summit Acquires 51% Ownership Share in the New Orbit Project, Toodoggone Mining District, B.C.

Sun Summit Minerals Corp. (TSX-V: SMN) (OTCQB: SMREF) is pleased to anno... READ MORE

May 14, 2026

Copyright 2026 The Prospector News