The Prospector News

G Mining Ventures Declares Commercial Production at Tocantinzinho Gold Mine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

G Mining Ventures Declares Commercial Production at Tocantinzinho Gold Mine

 

 

 

 

 

  • Tocantinzinho reaches commercial production on time and on budget in less than two years
  • Tocantinzinho engineered to have a 10.5-year mine life with an average annual gold production of 174,700 ounces, and an average annual gold production of 196,200 for the first five full years
  • Nameplate throughput expected by Q1 2025
  • Share price outperformed GDXJ by +120% since the construction decision in September 2022

 

G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to announce that it has reached commercial production on time and on budget at its 100%-owned Tocantinzinho Gold Mine located in the State of Pará, Brazil. Commercial production is defined as a period of 30 consecutive days of operations during which the mill operated at a minimum of 60% of nameplate throughput of 12,890 tonnes per day. During August 2024, the mill operated at 76% of nameplate throughput, processing a total of 304,312 ore tonnes (9,817 tpd) at a recovery rate of 88%.

 

Louis-Pierre Gignac, President & Chief Executive Officer, commented: “I am proud to announce this momentous achievement of starting commercial production at the Tocantinzinho Gold Mine. We have delivered TZ on time and on budget, with an industry-leading safety record. This achievement is the culmination of 5.8 million person-hours focused on building, testing and ramping up production at Brazil’s newest major gold mine. I would like to recognize the immense efforts of our dedicated team, who have invested their talent, expertise, and passion in reaching this transformational milestone. With this accomplishment behind us, we remain committed to enhancing plant performance and achieving our production and cost KPIs.

 

The plant’s ramp-up continues to progress in line with internal production schedules, with all major equipment demonstrating the capability to operate at or above design levels. After the initial pour announced in July 2024, GMIN has focused on ramping production to test the processing circuits’ ability to handle nameplate loads while improving recovery toward a life of mine average of 90%. The Corporation plans to ramp up production through H2-24, targeting nameplate throughput by Q1 2025.

 

TZ is engineered to have a 10.5-year mine life with an average annual gold production of 174,700 ounces and 196,200 ounces for the first five full years, capitalizing on the record-high gold price environment. The Corporation plans to provide annual guidance for TZ in January 2025.

 

Virtual Site Tour and Feasibility Study Presentation

 

Updated satellite imagery and 360 photography showing the site progress is available through the corporate presentation at: https://vrify.com/decks/14338. A 3D presentation of the Project Feasibility Study is available at: Feasibility Study 3D VRIFY Presentation. Both presentations can be accessed by visiting GMIN’s website at https://www.gmin.gold.

 

Timetable and Next Steps

 

Upcoming key milestones include:

  • September 2024: Preliminary Economic Assessment on the Oko West Project
  • Q4-2024: Exploration results from the Oko West Project
  • Q4-2024: Exploration results from TZ
  • Q1-2025: Nameplate capacity reached at TZ

 

Qualified Person

 

Louis-Pierre Gignac, President & Chief Executive Officer of GMIN, a QP as defined in NI 43-101, has reviewed the press release on behalf of the Corporation and has approved the technical disclosure contained in this press release.

 

About G Mining Ventures Corp.

 

G Mining Ventures Corp. is a mining company engaged in the acquisition, exploration and development of precious metal projects to capitalize on the value uplift from successful mine development. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Gold Mine in Brazil and Oko West Project in Guyana, both mining friendly and prospective jurisdictions.

Posted September 3, 2024

Share this news article

MORE or "UNCATEGORIZED"


Aben Gold Corp. Closes $1.3 Million Private Placement of Flow-Through Units

Aben Gold Corp. (TSX-V: ABM) (OTCID: ABNAF) (Frankfurt: ML1) announce... READ MORE

June 19, 2026

Neotech Metals Announces Close of Private Placement

Neotech Metals Corp. (CSE: NTMC) (OTCQB: NTMFF) (FSE: V690) is pl... READ MORE

June 19, 2026

Southern Silver Initiates Infill Drilling on the Puro Corazon Target, Cerro Las Minitas Project, Durango Mexico

Southern Silver Exploration Corp. (TSX-V: SSV) reports that crews... READ MORE

June 18, 2026

Amex Exploration Completes Final Tranche of C$80 Million Private Placement

Amex Exploration Inc. (TSX-V: AMX) (FSE: MX0) (OTCQX: AMXEF) is p... READ MORE

June 18, 2026

Mercado Minerals Intersects 1.20 Metres of 1120 g/t Silver Equivalent Within 3.50 Metres of 686 g/t Silver Equivalent at El Agua Vein Copalito Project

Mercado Minerals Ltd. (CSE: MERC) (OTCQB: MRMNF) announces furthe... READ MORE

June 18, 2026

Copyright 2026 The Prospector News