The Prospector News

Imperial Reports Drilling at Mount Polley Extends Mineralization 885 Metres Beneath Springer Pit

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Imperial Reports Drilling at Mount Polley Extends Mineralization 885 Metres Beneath Springer Pit

 

 

 

 

 

Imperial Metals Corporation (TSX:III) reports diamond drill results from the final 18 diamond drill holes from the Mount Polley 2024 exploration program, including a notable interval of 895 metres grading 0.26% copper and 0.32 g/t gold starting from a depth of 27.5 metres, including 342.5 metres grading 0.42% copper and 0.48g/t gold starting from 27.5 metres, in diamond drill hole SD-24-196. The 2024 drilling at Mount Polley followed up on the significant results obtained in the 2023 drill program which focused on the Springer zone at Mount Polley.

 

Hole SD-24-196 was an angled hole oriented at 155°/75° (strike/dip), collared in the floor on the south side of the Springer Pit. This hole, like the other holes in this drill program targeted gaps in drilling within the current pit designs (Phase 5 and 6 pits) in the Springer zone and also to test for extended mineralization at depth. The results confirm that copper-gold mineralization extends vertically beneath the floor of the Springer Pit for 885 metres. The results will be used to remodel the Springer zone mineralization, optimize the pit designs for the Springer Pit, increase resolution in mine scheduling and potentially to consider pit expansions and further drilling.

 

A total of 7,377 metres of diamond drilling were completed at Mount Polley between March and May, 2024.

 

Hole ID From
(m)
To (m) Width
(m)
Copper
(%)
Gold
(g/t)
SD-24-183 7.5 167.5 160 0.42 0.43
including 105 167.5 62.5 0.75 0.82
including 105 123.7 18.7 1.67 1.57
SD-24-190 3 252 249 0.33 0.39
including 3 112.5 109.5 0.51 0.54
SD-24-191 6 310 304 0.24 0.26
including 6 40 34 0.35 0.47
including 75 165 90 0.29 0.29
SD-24-192 4.5 249 244.5 0.26 0.37
including 4.5 101.3 96.8 0.39 0.31
including 162.5 242 79.5 0.26 0.60
SD-24-196 27.5 922.5 895 0.26 0.32
including 27.5 370 342.5 0.42 0.48
including 235 370 135 0.53 0.65
SD-24-197 3.9 237 233.1 0.20 0.36
including 82.5 200 117.5 0.32 0.62
 

All the holes highlighted in the table above were drilled from the Springer pit bottom.

 

Hole SD-24-183 was a vertical hole located in the center of the Springer Pit targeting an area with gaps in drilling. The drill hole intersected 160 metres grading 0.42% copper and 0.43 g/t gold, starting from 7.5 metres depth, including 18.65 metres of 1.67% copper and 1.57 g/t gold. This interval also intercepted 27.5 metres of 0.12% molybdenum from 107.5 metres; this level of molybdenum mineralization is the highest ever intersected in the Springer zone.

 

Hole SD-24-190 was a vertical hole collared in the center of the Springer Pit, about 35 metres northwest of hole SD-24-183. The drill hole intersected 249.0 metres grading 0.33% copper and 0.39 g/t gold, starting from three metres depth, including 109.5 metres of rock grading 0.51% copper and 0.54 g/t gold, starting from three metres.

 

Hole SD-24-191 was a vertical hole collared in the Springer Pit, about 100 metres northwest of SD-24-183. The drill hole intersected 304.0 metres grading 0.24% copper and 0.27 g/t gold, starting from six metres depth, including 34.0 metres grading 0.35% copper and 0.47 g/t gold, starting from six metres depth.

 

Hole SD-24-192 was a vertical hole collared approximately 70 metres southeast of SD-24-183. The drill hole intersected 244.5 metres grading 0.26% copper and 0.37 g/t gold, starting from 4.5 metres depth, including 96.80 metres of rock grading 0.39% copper and 0.31 g/t gold, starting from 4.5 metres depth and 79.45 metres grading 0.26% copper and 0.60 g/t gold, starting from 162.5 metres depth.

 

Hole SD-24-197 was an angled hole oriented at 040°/65 ° collared in the northern part of the Springer Pit. This hole targeted an undrilled area along the northeastern boundary of the deposit in an area with high potential to hit higher grade mineralization. The drill hole intersected 117.5 metres grading 0.32% copper and 0.62 g/t gold, starting from 82.5 metres depth.

 

Drillhole data, section and plan map are available on Imperialmetals.com.

 

Jim Miller-Tait, P.Geo., Imperial’s VP Exploration, has reviewed this news release as the designated Qualified Person as defined by National Instrument 43-101 for the Mount Polley exploration program. Samples reported were analysed at Bureau Veritas Mineral Laboratories in Vancouver. A full QA/QC program using blanks, standards and duplicates was completed for all diamond drilling samples submitted to the labs. Significant assay intervals reported represent apparent widths. Insufficient geological information is available to confirm the geological model and true width of significant assay intervals.

 

About Imperial

 

Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount Polley mine (100%), the Huckleberry mine (100%), and the Red Chris mine (30%). Imperial also holds a portfolio of 23 greenfield exploration properties in British Columbia. These properties have defined areas of mineralization and clear exploration potential. Management continues to evaluate various opportunities to advance many of these properties.

 

Posted July 23, 2024

Share this news article

MORE or "UNCATEGORIZED"


Commerce Resources Announces Closing Of C$2.15 Million Non-Brokered Private Placement Of Secured Convertible Notes

Commerce Resources Corp.  (TSX-V: CCE) (FSE: D7H0) is pleased to... READ MORE

May 13, 2025

North Bay Resources Announces Resource Estimate of 474,000 ounces at Fran Gold Project, British Columbia

North Bay Resources, Inc. (OTC: NBRI) is pleased to announce a re... READ MORE

May 13, 2025

NEVGOLD ADDS MORE SIGNIFICANT OXIDE GOLD-ANTIMONY RESULTS: 2.19 G/T AUEQ OVER 64.0 METERS (0.72 G/T AU AND 0.33% ANTIMONY), INCLUDING 4.17 G/T AUEQ OVER 24.1 METERS (1.47 G/T AU AND 0.60% ANTIMONY), AND ALSO INCLUDING 10.86 G/T AUEQ OVER 4.50 METERS (1.43 G/T AU AND 2.10% ANTIMONY) AT THE LIMOUSINE BUTTE PROJECT, NEVADA

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleas... READ MORE

May 13, 2025

G2 Drills 76m @ 1.5 g/t Au and 3m @ 12.5 g/t Au in Scout Drilling at Peters Mine, Guyana

G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) is pleased to annou... READ MORE

May 13, 2025

Aya Gold & Silver Reports Record Q1-2025 Results, Strengthens Liquidity and Reaffirms Guidance

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced fi... READ MORE

May 13, 2025

Copyright 2025 The Prospector News