The Prospector News

Imperial Drilling Intersects 257.5 Metres Grading 0.71% Copper and 0.39 g/t Gold at Mount Polley

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Imperial Drilling Intersects 257.5 Metres Grading 0.71% Copper and 0.39 g/t Gold at Mount Polley

 

 

 

 

 

 

Imperial Metals Corporation (TSX:III) reports diamond drill results from three more holes of the Mount Polley 2024 exploration program, including a notable interval of 257.5 metres grading 0.71% copper and 0.39 g/t gold from 35.0 metres in diamond drill hole SD-24-180. This phase of drilling is ongoing and is following up on the significant results obtained in the 2023 drill programs.

 

Hole SD-24-180 was a vertical hole located 33 metres northwest from previously released hole SD-24-179 which intersected 270 metres grading 0.65% copper and 0.48 g/t gold from 22.5 metres on section 3230N. Holes SD-24-180 and SD-24-179 were planned to target gaps in the southwest edge of the Springer Pit at both shallow and deep levels. The first 135.5 metres of this intercept are within the current ultimate pit design for the Springer Pit. The portion of this hole beneath the ultimate pit tests an area that has been studied for potential underground mining.

 

Significant intercepts:

 

Hole ID From (m) To (m) Width (m) Copper (%) Gold (g/t)
SD-24-180 35.0 292.5 257.5 0.71 0.39
including 187.5 292.5 105.0 1.13 0.58
including 202.5 287.5 85.0 1.29 0.65

 

Hole SD-24-180 had 18 metres of casing and encountered the first recoverable core at 33 metres. The lithology throughout the entire hole closely resembles hole SD-24-179 and alternates between intense crackle breccia to moderately pseudo-brecciated monzonite to monzodiorite, with strong potassium feldspar, biotite, calc-silicate, albite and magnetite alteration. Copper mineralization throughout the hole is dominantly disseminated with veinlet-controlled chalcopyrite and trace bornite. Similar to hole SD-24-179, hole SD-24-180 intersects pervasive calc-silicate and magnetite alteration three times, providing pockets with a higher percentage of chalcopyrite.

 

Hole SD-24-178 was an angled hole oriented at 225°/-60° and was collared on the north rim of the current Springer Pit. The hole was planned to test the extent of mineralization of the Springer Pit near a fault that appears to form the northern boundary of Springer mineralization. The first 143 metres of this hole are within the ultimate pit design. The hole intersected 12.5 metres of 0.28% copper and 0.39 g/t gold starting at 30 metres along with some lower grade intervals in the pit that will be mined in the Phase 5 pushback of the Springer pit. Mineralization within the pit may provide some additional mill feed from upper benches of the Phase 5 pushback.

 

Hole SD-24-181 was a vertical hole collared on the eastern edge at the bottom of the Springer Pit. The hole was designed to test potential mineralization further to the east at depth. Hole SD-24-181 intersected two notable intervals of gold mineralization. The first interval had a width of 22.5 metres grading 0.18% copper and 0.44 g/t gold from 42.5 metres and is within the current pit design. The second interval had a width of 35 metres grading 0.17% copper and 0.49 g/t gold from 107.5 metres and is beneath the current ultimate pit design.

 

Jim Miller-Tait, P.Geo., Imperial’s VP Exploration, has reviewed this news release as the designated Qualified Person as defined by National Instrument 43-101 for the Mount Polley exploration program. Samples reported were analysed at Bureau Veritas Mineral Laboratories in Vancouver. A full QA/QC program using blanks, standards and duplicates was completed for all diamond drilling samples submitted to the labs. Significant assay intervals reported represent apparent widths. Insufficient geological information is available to confirm the geological model and true width of significant assay intervals.

 

Diamond drill data, cross sections and plan view maps are available on Imperialmetals.com.

 

About Imperial

 

Imperial is a Vancouver based exploration, mine development and operating company with holdings that include the Mount Polley mine (100%), the Huckleberry mine (100%), and the Red Chris mine (30%). Imperial also holds a portfolio of 23 greenfield exploration properties in British Columbia. These properties have defined areas of mineralization and clear exploration potential. Management continues to evaluate various opportunities to advance many of these properties.

 

Posted May 22, 2024

Share this news article

MORE or "UNCATEGORIZED"


Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project

Spanish Mountain Gold Ltd. (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF)... READ MORE

July 4, 2025

Aura Announces Preliminary Q2 2025 Production Results

Aura Minerals Inc. (TSX: ORA) (B3: AURA33) (OTCQX: ORAAF) is plea... READ MORE

July 4, 2025

Cascadia Announces Closing of Financing

Cascadia Minerals Ltd. (TSX-V:CAM) (OTCQB:CAMNF) is pleased to an... READ MORE

July 4, 2025

Abcourt Closes US$ 8M Loan Facility to Start Sleeping Giant Mine

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

July 4, 2025

Mishkeegogamang First Nation and First Mining Sign Long Term Relationship Agreement for the Development of the Springpole Gold Project

Agreement setting out the significant participation of Mishkeegog... READ MORE

July 4, 2025

Copyright 2025 The Prospector News