Lithium Ionic Corp. (TSX-V: LTH) (OTCQX: LTHCF) (FSE: H3N) reports assay results from the Salinas Lithium Project, located approximately 100 kilometres north of its Feasibility-stage Bandeira lithium project and the Outro Lado lithium deposit in northern Minas Gerais State, Brazil. Nine of the 15 holes reported were drilled at the Noé target, a well-mineralized pegmatite discovered approximately 1.5 kilometres North of the Salinas mineral resource zones earlier this year.
Salinas Noé Target Highlights:
Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, “These new high-grade results from the Noé target are very exciting and support GE21’s view that this zone could meaningfully contribute to the mineral growth at Salinas. Interpreted as a northeast extension of the historically significant ‘Lavra do Zoe’ pegmatite, which has been mined for spodumene intermittently over several decades, Noé offers a potential path to substantially scale this deposit. With a PEA already underway for the initial resource announced earlier this month, we are increasingly confident that Salinas will continue to represent a cornerstone asset in our portfolio.”
Lithium Ionic acquired the Salinas group of properties in early 2023 from Neolit Minerals Participações Ltda. (see press release dated March 13, 2023) and began drilling the area in May 2023. On April 4, 2024, the Company announced an initial NI 43-101 compliant mineral resource estimate at Salinas of 14.76Mt based on 122 drill holes (27,030m) drilled between May and November 2023. GE21, who completed the Salinas MRE, has been engaged to complete a Preliminary Economic Assessment which is expected for completion in H2 2024.
While completing the MRE for Salinas, GE21 analyzed the initial drill holes conducted at the Noé target, which were located outside of the mineral resource area, and identified a strong potential for Noé to contribute 10-15Mt* in the near-term with additional drilling. The results announced today support this view, and the Company intends to continue exploration work at Salinas for the remainder of 2024 to continue to expand and upgrade the mineral resources. An upgraded MRE for Salinas is expected later this year.
*The potential quantity of the lithium mineralization at the Noé target is conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource or Reserve and it is uncertain if further exploration will confirm the target ranges.
FIgure 1. Salinas Lithium Project Location & New Drill Intercept Highlights
Figure 2. Core Photos, Holes BGDD-24-131 and BGDD-24-133
Table 1. Salinas Drill Results
Hole ID | Az | Dip | From | To | Metres | Li2O (%) |
BGDD-23-128 | 310 | -60 | 98.05 | 99.80 | 1.75 | 0.49 |
BGDD-24-129 | 310 | -65 | 204.60 | 212.05 | 7.45 | 1.26 |
BGDD-24-130 | 310 | -60 | 83.20 | 90.20 | 7.00 | 1.24 |
BGDD-24-131 | 310 | -60 | 37.95 | 56.95 | 19.00 | 1.15 |
including | 37.95 | 47.95 | 10.00 | 1.67 | ||
BGDD-24-132 | 130 | -85 | 252.00 | 255.00 | 3.00 | 2.16 |
BGDD-24-133 | 310 | -75 | 30.27 | 45.27 | 15.00 | 1.53 |
including | 30.27 | 38.27 | 8.00 | 2.31 | ||
BGDD-24-134 | 340 | -50 | 144.80 | 147.89 | 3.09 | 1.01 |
BGDD-24-135 | 310 | -75 | 181.88 | 192.07 | 10.19 | 1.44 |
BGDD-24-136 | 310 | -75 | nsr | |||
BGDD-24-137 | 310 | -60 | 173.55 | 174.55 | 1.00 | 1.29 |
and | 287.47 | 289.71 | 2.24 | 1.19 | ||
BGDD-24-139 | 310 | -60 | 169.53 | 173.42 | 3.89 | 1.24 |
BGDD-24-140 | 310 | -60 | 19.70 | 33.70 | 14.00 | 1.32 |
incl | 19.70 | 26.70 | 7.00 | 2.16 | ||
BGDD-24-141 | 310 | -60 | 93.25 | 95.30 | 2.05 | 0.95 |
and | 162.38 | 164.45 | 2.07 | 0.63 | ||
and | 183.17 | 189.17 | 6.00 | 0.84 | ||
and | 249.43 | 253.43 | 4.00 | 1.15 | ||
BGDD-24-142 | 130 | -70 | 31.62 | 36.62 | 5.00 | 1.61 |
BGDD-24-143 | 310 | -70 | 62.08 | 64.65 | 2.57 | 0.90 |
and | 74.60 | 75.60 | 1.00 | 0.98 |
*BGDD-24-138 was not sampled.
About Lithium Ionic Corp.
Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its Itinga and Salinas group of properties cover 14,182 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. Its Feasibility-stage Bandeira Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.
Quality Assurance and Control
During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.
Qualified Persons
The technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, who are both “qualified persons” as defined in NI 43-101.
HIGHLIGHTS: Increased Reserves Life Of Mine: Mineral Reserves inc... READ MORE
Asante Gold Corporation (CSE:ASE) (GSE:ASG) (FRANKFURT:1A9) (U.S.... READ MORE
Highlights Strong copper grades from maiden fall 2024 drill progr... READ MORE
Lithium Ionic Corp. (TSX-V: LTH) (OTCQB: LTHCF) (FSE: H3N) is ple... READ MORE
Zone extended another 25 meters TRX Gold Corporation (TSX: TRX... READ MORE