South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth
Step-out drilling places SPMC on the upper margin of a potential ... READ MORE
August 24, 2026
North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana
New surface targets identified North Arrow Minerals Inc. (... READ MORE
August 24, 2026
USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake
U.S. Department of War (DoW) provides a $750 million investment i... READ MORE
August 24, 2026
Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System
Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE
August 24, 2026
Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project
Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE
August 24, 2026