The Prospector News

Victoria Gold: Eagle Gold Mine Q1 2024 Operational Highlights

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Victoria Gold: Eagle Gold Mine Q1 2024 Operational Highlights

 

 

 

 

 

Victoria Gold Corp. (TSX:VGCX) produced 29,580 ounces of gold during the first quarter of 2024.

 

Mr. John McConnell, President and CEO commented, “For the second consecutive year, we have stacked ore on the heap leach pad through the winter. While quarterly gold production is down year over year, the summer and fall seasons are our strongest operating periods and we expect to achieve 2024 gold production guidance of 165,000 to 185,000 ozs and cost guidance of US$1,450 to US$1,650 per oz of gold sold.”

 

Eagle Gold Mine Q1 2024 Operational Highlights:

 

    2023 2024
Q1 Q1
Ore mined millions of tonnes 2.1 2.0
Waste mined millions of tonnes 3.1 2.9
Total mined millions of tonnes 5.2 4.9
Strip Ratio waste to ore 1.4 1.5
Mining rate 000’s of tonnes/day 58 54
Ore stacked on pad millions of tonnes 2.1 2.0
Ore stacked grade grams/tonne gold 0.86 0.63
Gold produced ounces 37,619 29,580

 

Q1 statistics may be subject to immaterial reconciliation and rounding variances.

 

Tonnes of ore mined and stacked on the heap leach pad in Q1 2024 is in line with ore mined and stacked in Q1 2023. Gold production in Q1 2024 was lower year-over-year due to lower grades related to mine sequencing of the Eagle orebody, the timing of placing stacked tonnes under leach, and lower than planned stacking rates in Q4 2023. Both gold grade and metallurgical recovery continue to reconcile well against the Eagle reserve model.

 

Qualified Person

The technical content of this news release has been reviewed and approved by Paul D. Gray, P.Geo., as the “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

About the Dublin Gulch Property

Victoria Gold’s 100%-owned Dublin Gulch gold property (the “Property”) is situated in central Yukon Territory, Canada, approximately 375 kilometers north of the capital city of Whitehorse, and approximately 85 kilometers from the town of Mayo. The Property is accessible by road year round, and is located within Yukon Energy’s electrical grid.

 

The Property covers an area of approximately 555 square kilometers, and is the site of the Company’s Eagle and Olive Gold Deposits. As at December 31, 2023, and adjusting for mining depletion through this date, the Eagle and Olive Deposits include Proven and Probable Reserves of 2.3 million ounces of gold from 114 million tonnes of ore with a grade of 0.63 grams of gold per tonne. As at December 31, 2023, and adjusting for mining depletion through this date, the Mineral Resource for the Eagle and Olive Gold Deposits are estimated to host 234 million tonnes averaging 0.59 grams of gold per tonne, containing 4.4 million ounces of gold in the “Measured and Indicated” category, inclusive of Proven and Probable Reserves, and a further 36 million tonnes averaging 0.63 grams of gold per tonne, containing 0.7 million ounces of gold in the “Inferred” category.

 

Posted April 10, 2024

Share this news article

MORE or "UNCATEGORIZED"


STLLR Gold Announces Closing of C$36.6 Million Private Placement Financing

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) is pleased ... READ MORE

October 15, 2025

SLAM Drills 81 And 74 Meter Core Intervals At The Goodwin Copper-Nickel-Cobalt Project

Drilling For Critical Elements In The Mineral-Rich Province Of Ne... READ MORE

October 15, 2025

Imagine Lithium Highlights Robust Initial Mineral Resource, Strong Metallurgy and Upcoming Drill Program at Jackpot Property

IMAGINE LITHIUM INC. (TSXV: ILI) (OTCQB: ARXRF) is pleased to p... READ MORE

October 15, 2025

NorthWest Extends High-Grade Mineralization at Kwanika With 16.9 Metres of 1.37% Copper Equivalent in Second 2025 Drill Hole

NorthWest Copper Corp. (TSX-V: NWST) is pleased to announce assay... READ MORE

October 15, 2025

Fortuna delivers robust PEA for Diamba Sud Gold Project in Senegal: After-tax IRR of 72% and NPV5% of US$563 million using US$2,750 per ounce

Fortuna Mining Corp. (NYSE: FSM) (TSX: FVI) is pleased to report the res... READ MORE

October 15, 2025

Copyright 2025 The Prospector News