The Prospector News

Prospector News Podcast – Keerit Jutla “All Stakeholders Need to Come Together to Modernize the Mineral Tenure Act of BC to Achieve Clarity”

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Prospector News Podcast – Keerit Jutla “All Stakeholders Need to Come Together to Modernize the Mineral Tenure Act of BC to Achieve Clarity”

 

 

 

 

The Prospector News Publisher Michael Fox is Joined by Keerit Jutla President and CEO of AMEBC to discuss the BC Government’s plans to modernize the Mineral Tenure Act in that province. In order to align Government statute and policy with the UNDRIP that BC has signed onto, a modernization of the Mineral Tenure Act is required. It is the position of AMEBC that all the stakeholders need to come together to discuss to modernization of the Act, to have clarity, avoid conflict and determine the obligation of consultation with whom and when in the exploration and development process.

AMEBC 

AMEBC discussions on the Mineral Tenure Act

https://amebc.ca/updates/ame-statement-on-mineral-tenure-act-modernization/

https://amebc.ca/updates/policy-update-mta-modernization/

Posted April 9, 2024

Share this news article

MORE or "UNCATEGORIZED"


Rocky Shore Identifies Higher Gold Grades Within Recently Acquired Gold Deposits at its Gold Anchor Project in Newfoundland

Rocky Shore Gold Ltd. (CSE: RSG) is pleased to announce that ongo... READ MORE

December 16, 2025

Near Surface Drilling Continues to Expand and Confirm Gold Mineralization

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

December 16, 2025

Doubleview Gold Corp Extends Mineralization East of 2024 Conceptual Pit and Identifies Deeper Porphyry Indicators at Hat Project by Drilling 992m of 0.29% CuEq in Hole H101

Doubleview Gold Corp. (TSX-V: DBG) (OTCQB: DBLVF) (FSE: 1D4) is p... READ MORE

December 16, 2025

Newcore Gold Drilling Intersects 3.16 g/t Gold over 3.0 Metres from 62 Metres and 0.78 g/t Gold over 16.0 Metres from 16 Metres, at the Enchi Gold Project, Ghana

Drilling Intersects Near Surface Gold Mineralization at the Boin ... READ MORE

December 16, 2025

McEwen Secures Key Permit for El Gallo Mine; Mill Construction to Begin Mid-2026 - First Gold Pour Mid-2027

McEwen Inc. (NYSE:MUX) (TSX: MUX) is pleased to announce that th... READ MORE

December 16, 2025

Copyright 2025 The Prospector News