The Prospector News

Ascot Commences Ore Processing at the Premier Gold Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ascot Commences Ore Processing at the Premier Gold Project

 

 

 

 

 

Ascot Resources Ltd. (TSX: AOT) (OTCQX: AOTVF) is pleased to announce the commencement of ore processing at the Premier Gold Project, located on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of northwestern British Columbia. Rock was introduced into the grinding circuit of the mill on March 31, 2024, and the first ore was introduced into the mill on April 5, 2024.

 

Derek White, President and CEO, commented, “The start of ore processing is a momentous achievement for the whole team at Ascot and an exciting milestone for the Company. Most project construction activities are substantially completed, and commissioning activities are ongoing throughout the processing plant with the aim of pouring first gold this month.”

 

As is customary for processing plant start-ups, waste rock was initially introduced into the grinding circuit in order to pad the semi-autogenous grinding (“SAG”) and Ball mill liners with barren material. Once that commissioning step was completed, the grinding system was re-torqued and gold-bearing ore was introduced into the mill on April 5, 2024. Commissioning activities are currently focused on the remaining components of the processing plant – namely the gravity concentration and intensive leaching circuit, the carbon regeneration circuit, the elution circuit, cyanide destruction, and the gold room.

 

The tailings storage facility (“TSF”), new water treatment plant (“WTP”), tailings thickener and pipeline systems are ready for operations.

 

The Company anticipates the pouring of first gold at the Project on schedule during the month of April 2024.

 

Qualified Person

 

John Kiernan, P.Eng., Chief Operating Officer of the Company is the Company’s Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical contents of this news release.

 

About Ascot Resources Ltd.

 

Ascot is a Canadian exploration and development company focused on re-starting the past producing Premier Gold Mine, located on Nisga’a Nation Treaty Lands, in British Columbia’s prolific Golden Triangle. Concurrent with progressing the development of Premier, the Company continues to explore its properties for additional high-grade gold mineralization. Ascot is committed to the safe and responsible development and operation of the Premier Gold Mine in collaboration with Nisga’a Nation.

 

Posted April 8, 2024

Share this news article

MORE or "UNCATEGORIZED"


Falco Resources Announces Updated Feasibility Study for Horne 5 Project, Delivering After-Tax NPV5% C$3.35 Billion, IRR of 28.2% and Cash Flow of C$6.4 Billion at Base Case Gold Price of US$3,600/Oz

Falco Resources Ltd. (TSX-V:FPC) is pleased to announce the resul... READ MORE

June 17, 2026

TDG Announces Positive Results from Ongoing Metallurgical Test Work - Conventional Processing Achieves >90% Gold and Silver Recoveries At Shasta, Toodoggone District

TDG Gold Corp. (TSX-V: TDG) (OTCQX: TDGGF) is pleased to provide ... READ MORE

June 17, 2026

Talamore announces initial high grade-drill results from Supremo Extension in its 40,000-metre 2026 drill program at Coffee Gold

Extension drilling extended mineralization beyond the current pit... READ MORE

June 17, 2026

Abcourt intersects 170.9 g/t Au over 0.8 m at Sleeping Giant

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) continues its work... READ MORE

June 17, 2026

Premier American Uranium Expands and Further Defines Uranium Mineralization at Kaycee Project, Wyoming with Initial 2026 Drill Results

Premier American Uranium Inc. (TSX-V: PUR) (OTCQB: PAUIF) is plea... READ MORE

June 17, 2026

Copyright 2026 The Prospector News