The Prospector News

TASEKO MINES ANNOUNCES THIRD QUARTER COPPER PRODUCTION OF 35 MILLION POUNDS FROM THE GIBRALTAR MINE

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

TASEKO MINES ANNOUNCES THIRD QUARTER COPPER PRODUCTION OF 35 MILLION POUNDS FROM THE GIBRALTAR MINE

 

 

 

 

 

Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) is pleased to announce that the Gibraltar Mine produced 35 million pounds of copper and 369 thousand pounds of molybdenum in the third quarter (100% basis).

 

Stuart McDonald, President and CEO of Taseko, commented, “The 25% quarter-over-quarter increase in copper production was a result of higher grades, improved recoveries and increased mill throughput. Mining in the Gibraltar pit is progressing on plan and the lower benches are providing the ore quality we expected. Molybdenum grades have also increased as mining has progressed deeper into the Gibraltar pit, resulting in a 60% increase in quarterly molybdenum production.”

 

A port workers strike in early July caused shipping delays and a build-up of Gibraltar copper concentrate inventory. As a result, third quarter sales volumes lagged production by three million pounds, and the excess inventory is expected to be shipped and sold in the fourth quarter.

 

Taseko is providing this third quarter production update in advance of an analyst and investor tour taking place at the Gibraltar Mine later today.

 

Presentation slides to be used during the tour will be available at

https://tasekomines.com/investors/presentations.

 

Posted October 4, 2023

Share this news article

MORE or "UNCATEGORIZED"


Americas Gold and Silver Reports High-Grade 149 Vein Extension Including 24,913 g/t Silver and 16.9% Copper at Galena Complex and Effective Date of Share Consolidation

Americas Gold and Silver Corporation (TSX: USA) (NYSE American: U... READ MORE

August 23, 2025

XXIX Announces Closing of $6.0 Million Financing

XXIX Metal Corp. (TSX-V: XXIX) is pleased to announce that it has... READ MORE

August 23, 2025

GRAPHITE ONE ANNOUNCES CLOSING OF C$13.3 MILLION BROKERED LIFE OFFERING

Graphite One Inc. (TSX-V: GPH) (OTCQX: GPHOF) is pleased to annou... READ MORE

August 22, 2025

Kuya Silver Reports Second Quarter 2025 Results; Continued Progress at Bethania Silver Project with Increased Mining Output, Significant Underground Development, and Encouraging Exploration Results

Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is... READ MORE

August 22, 2025

Abcourt Accepts $5.8M Financing Offer from Investissement Québec

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

August 22, 2025

Copyright 2025 The Prospector News