The Prospector News

Cartier Cuts 15.7 g/t Au over 3.0 m in New VG Zone of the Chimo Mine Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Cartier Cuts 15.7 g/t Au over 3.0 m in New VG Zone of the Chimo Mine Project

 

 

 

 

Highlights of press release:

  • New gold-bearing VG Zone including the following results:
    • 15.7 g/t Au / 3.0 m including 75.9 g/t Au / 0.5 m and 10.5 g/t Au / 0.5 m
    • 14.2 g/t Au / 1.0 m
    • 6.4 g/t Au / 2.0 m
    • 10.7 g/t Au / 0.8 m
  • New VG Zone demonstrates potential of 15 km Gold Strike of the Chimo Mine Project

 

Cartier Resources Inc. (TSX-V: ECR) (FSE: 6CA) announces drill results constituting the new VG Gold Zone, located north of the West Nordeau deposit (FIGURE 1) of the Chimo Mine Project. The Project, comprised of the Chimo Mine and East Cadillac properties is 100% owned by Cartier and located at 45 km east of the Val-d’Or mining camp.

 

The VG Zone, currently made up of 5 high-grade gold drill intersections (Tables 1 and 2), is located between 75 m and 150 m depths (FIGURE 1).   A drill intersection with similar gold grades is also present below the VG Zone, at a depth of 300 m, down-plunge of the mineralized zones of the Project. High-grade gold intersections are also present respectively at 275 m to the west and 550 m to the east of the VG Zone defining the VG Structure over a strike length of 850 m.

 

« The gold results from this new VG Zone demonstrate the potential of the gold deposits, showings and intersections located along the 15 km favorable strike of the Chimo Mine Project (FIGURE 2) » commented Philippe Cloutier, President and CEO.

 

Table 1: Detailed information of the new results

 

Drill Hole Coordinates
UTM (m)
Azimuth (°)
/Plunge (°)
From
(m)
To
(m)
Au
(g/t)
Length
(m)
Gold Zone Gold Structure
Localisation: West Nordeau Sector – New VG Gold Zone
CH23-93 333527/5319849/351 164/-45 97.7 100.7 15.7 3.0 VG VG
Including 99.7 100.2 75.9 0.5
Including 100.2 100.7 10.5 0.5
CH23-88 183/-47 93.0 94.0 14.2 1.0
CH23-92 166/-51 107.5 109.5 6.4 2.0
CH23-84 197/-68 118.5 119.3 10.7 0.8

 

The lengths of the mineralized intersections are expressed as lengths measured along the drill core.
The estimated true thickness of the mineralized intersections represents approximately 70 to 90% of the measured length.

 

Table 2: Detailed information of historical drill results

 

Drill Hole Coordinates
UTM (m)
Azimuth (°)
/Plunge (°)
From
(m)
To
(m)
Au
(g/t)
Length
(m)
Gold Zone Gold Structure
Localisation: West Nordeau Sector – New VG Gold Zone and Structure
NW08-13 333526/5319948/358 171/-76 289.9 290.3 45.9 0.4 VG VG
NW08-12 333526/5319848/352 176/-77 132.7 133.3 18.8 0.6
W 90-08 333253/5319894/350 183/-80 59.2 61.0 14.4 1.8
Including 59.4 59.7 75.3 0.3
O3EC-20-020 334067/5319721/350 186/-59 188.0 189.5 16.6 1.5

 

The lengths of the mineralized intersections are expressed as lengths measured along the drill core.
The estimated true thickness of the mineralized intersections represents approximately 60 to 80% of the measured length.

 

Reminder of the highlights of the Chimo Mine Project:

  • Recent positive Preliminary Economic Assessment * (FIGURE 3):
    • Post-Tax NPV5% of CAD$388M and 20.8% IRR
    • Average annual production of 116,900 ounces of gold at a milled average of 4.6  g/t Au for a 9.7 years mine life
    • Payback period of 2.9 years
    • Long term gold price of US$1,750/oz, exchange rate of CAD $1.00 = US $0.77
    • Capex of CAD$341M, average all-in sustaining cost of US$755/oz
  • Recent Mineral Resource Estimate ** (FIGURE 4):
    • 720,000 ounces of gold in the indicated resource category
    • 1,633,000 ounces of gold in the inferred resource category
  • The main portion of the Chimo Mine Project, 3.7 km long east-west, 1.6 km high and 500 m thick north-south, consists to date of 20 gold structures including 31 gold zones.
  • 53% of diluted and recoverable ounces of gold are contained in 2 gold structures (5B and 5N).
  • 46% of diluted and recoverable ounces of gold are contained in 5 gold zones (5BE, 5NE1-5NE2, 5B and 5NE).

 

* NI 43-101 Technical Report and Preliminary Economic Assessment for Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and East Cadillac Properties, Quebec, Canada, Marc R. Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme and Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions, May, 29nd, 2023.

 

** NI 43-101 Mineral Resources Estimate for Chimo Mine and West Nordeau Gold Deposits, Québec, Canada, Vincent Nadeau-Benoit, P.Geo., Alain Carrier, P.Geo., M.Sc. and Marc R. Beauvais, P.Eng., InnovExplo Inc., August 22nd, 2022.

 

About Cartier Resources Inc.

 

Cartier Resources Inc. was founded in 2006 and is an advanced gold project exploration company based in Val-d’Or. The company’s projects are all located in Quebec, which has consistently ranked as one of the world’s best mining jurisdictions. Cartier is advancing the development of its flagship Chimo Mine Project. The Company has a cash position exceeding $2.6 M and a significant corporate and institutional endorsement, including Agnico Eagle Mines, O3 Mining and Quebec investment funds.

 

Qualified Persons

 

The scientific and technical information on the Company and the Chimo Mine Project in this news release was prepared and reviewed by Mr. Gaétan Lavallière, P. Geo., Ph. D, Cartier’s Vice- President and Mr. Ronan Déroff, P. Geo, M. Sc., Cartier’s Senior Geologist, Project Manager and Geomatician, both qualified persons as defined in NI 43-101. Mr. Lavallière approved the information contained in this press release.

 

Quality Assurance / Quality Control

 

Cartier inserts in the batches of samples sent to the laboratory, 5% of the number of samples in the form of certified standards and another 5% in the form of sterile samples to ensure quality control. The samples are analyzed at the Techni-Lab laboratory (Actlabs), located in Ste-Germaine-Boulé, Quebec, Canada. Samples of 3 to 5 kg are crushed by the laboratory up to 90% passing a mesh of 10 mesh (2.00 mm) then 500 g of sample is pulverized up to 90% passing a mesh of 200 mesh (0.07mm). The 50 g pulps are analyzed by fire assay and are read by atomic absorption. Samples with results ≥ 1.0 g/t and < 10.0 g/t are re-assayed by fire assay and read by atomic absorption. Results greater than or equal to 10.0 g/t Au are analyzed by fire assay with gravimetric reading. For samples containing visible gold, 500 g of rock are analyzed by the “Metallic Sieve” method.

 

Posted August 24, 2023

Share this news article

MORE or "UNCATEGORIZED"


Red Pine Discovers Significant Gold Mineralization in Faulted Extension of the Jubilee Shear on the Wawa Gold Project

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

October 31, 2024

F3 Announces Closing of Private Placement for Aggregate Gross Proceeds of C$8 Million

F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE

October 31, 2024

Collective Mining Announces Closing of Concurrent Financings for Gross Proceeds of C$46.35 Million

Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE

October 31, 2024

ARIS MINING ANNOUNCES CLOSING OF US$450 MILLION SENIOR NOTES OFFERING TO FUND REDEMPTION OF OUTSTANDING 6.875% SENIOR NOTES

Aris Mining Corporation  (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE

October 31, 2024

Rare Element Resources Receives Final Approval Required to Commence Operations of Rare Earth Demonstration Plant in Wyoming

Staffing in place and operations shakedown underway Rare E... READ MORE

October 31, 2024

Copyright 2024 The Prospector News