The Prospector News

XIMEN MINING COMMENCES DRILLING AT WILD HORSE GOLD PROJECT

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

XIMEN MINING COMMENCES DRILLING AT WILD HORSE GOLD PROJECT

 

 

 

 

 

CRANBROOK BC

 

Ximen Mining Corp. (TSX-V: XIM) (FRA: 1XMA) (OTCQB: XXMMF) announces that it has initiated a drill program at its Wild Horse Gold project near Cranbrook in southeastern BC.

The Wild Horse project covers source areas for the famous historic Wild Horse River placer gold deposit near Fort Steele and Cranbrook, in southeastern B.C. Bedrock gold was first discovered in this area as early as 1895 but an economic deposit has yet to be defined. Gold-bearing quartz veins and breccias were drilled in 2016 and 2021, on Ximen’s Lone 4 claim, where there is potential for a bulk-minable gold deposit.

 

Gold (ppb) in soil samples from 2009 Boulder Grid (Report 30952)

 

 

This year, Ximen will drill test an area to the northeast on its Boulder Claim, where a 700 x 300 meter gold in soil anomaly was previously identified (BC Assessment report 30952).

The drill will also test beneath an area of abundant boulders of syenite observed on the soil grid. In 2009 it was reported that four boulders of this syenite float were sampled, of which “three were anomalous in gold and one ran 4.1 grams of gold per ton” (Assessment report 34920). The syenite is believed to be part of the mid-Cretaceous felsic intrusive Bayonne plutonic suite that is spatially and possibly genetically related to gold mineralization in the Kimberley Gold Trend.

 

Cross section of 3D model of Boulder Creek drill target (azimuth 056 degrees)

 

 

The area is transected by the Boulder Creek fault, a regional high-angle reverse fault that dips 60° to 65° to the northwest and is interpreted as an eastward continuation of the St. Mary fault (BC Geology Survey Bulletin 84). These faults are dominant structures associated with gold deposits in the Kimberley Gold Trend (Geoscience BC Map: 2015-13-01). The St. Mary-Boulder Creek structure is a major transverse fault system that is interpreted as a surface expression the Vulcan Low, a fundamental Precambrian basement transverse structure (McMechan, 2012; Canadian Journal of Earth Sciences, 2012 Vol. 49, p693). This provides a most favourable lithospheric architecture for controlling the location of gold deposits in terms of mineral systems modeling.

Readers are cautioned that historical records referred to in this News Release have been examined but not verified by a Qualified Person. Further work is required to verify that historical records referred to in this News Release are accurate.

Dr. Mathew Ball, P.Geo., VP Exploration for Ximen Mining Corp. and a Qualified Person as defined by NI 43-101, approved the technical information contained in this News Release.

Posted July 27, 2023

Share this news article

MORE or "UNCATEGORIZED"


Viva Gold Intersects a New High-Grade Gold Zone at Shallow Depths at its Tonopah Gold Project in Nevada

  Viva Gold Corp (TSX-V: VAU) (OTCQB: VAUCF) is pleased to annou... READ MORE

April 23, 2026

Orezone Reports First Quarter 2026 Gold Production

Orezone Gold Corporation (TSX: ORE) (ASX: ORE) (OTCQX: ORZCF)  i... READ MORE

April 23, 2026

Fury Intercepts 12.50 g/t Gold over 7.02 Metres Outside the Eau Claire Block Model

Fury Gold Mines Limited (TSX:FURY) (NYSE: FURY) is pleased to rel... READ MORE

April 23, 2026

Excellent Drill Results Confirm Growth Potential at Porcupine

Hoyle Pond1 Hoyle Pond: Drilling expands high-grade mineralizatio... READ MORE

April 23, 2026

ARRAS MINERALS CONFIRMS THIRD PORPHYRY CENTER - DRILLS 115.7 METERS GRADING 1.44 G/T AU & 0.24% CU AT THE BEREZSKI EAST TARGET (ELEMES PROJECT) IN KAZAKHSTAN

Arras Minerals Corp. (TSX-V: ARK) (OTCQB: ARRKF) is pleased to report th... READ MORE

April 23, 2026

Copyright 2026 The Prospector News