The Prospector News

Lithium Ionic drills 1.31% Li2O over 14m and 2.29% Li2O over 7.1m at Bandeira, Minas Gerais, Brazil

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lithium Ionic drills 1.31% Li2O over 14m and 2.29% Li2O over 7.1m at Bandeira, Minas Gerais, Brazil

 

 

 

 

 

Lithium Ionic Corp. (TSX-V: LTH) (OTCQB: LTHCF) (FSE: H3N) reports assay results from its 100%-owned Bandeira property, located within the lithium-rich Araçuaí district in the state of Minas Gerais, Brazil. The results are part of the initial 30,000-metre delineation drill program that will culminate in an initial NI 43-101 compliant mineral resource estimate expected by the end of Q2 2023. The MRE will include data from the last year of drilling at the Bandeira and Galvani targets, and drilling continues to further expand the resources for future resource estimates.

 

Bandeira is located approximately 500 metres south of Companhia Brasileira de Lítio’s Cachoeira lithium mine, and approximately 700 metres north of Sigma Lithium Corp.’s large Barreiro lithium deposit. (See Figure 1). The Company is currently the second largest mineral rights holder in the region, controlling 14,182 hectares in this emerging hard rock lithium-producing district.

 

Bandeira Drill Intercept Highlights

  • 1.31% Li2O over 14m, incl. 1.50% Li2O over 7.9m intersected at shallow depths (57m-71m down hole) (hole ITDD-23-087)
  • 2.29% Li2O over 7.1m and 2.17% Li2O over 5m (hole ITDD-23-083)
  • 2.17% Li2O over 5.8m (hole ITDD-23-082)
  • 1.63% Li2O over 7.7m (hole ITDD-23-094)
  • 1.62% Li2O over 8.2m (hole ITDD-23-096)
  • 1.31% Li2O over 9.4m (hole ITDD-23-084)
  • 1.37% Li2O over 8.8m (hole ITDD-23-089)
  • 1.47% Li2O over 8m (hole ITDD-23-093)

 

Blake Hylands, P.Geo., Chief Executive Officer of Lithium Ionic, commented, “Drilling at Bandeira has identified an impressive number of spodumene bearing pegmatites at shallow depths with grades consistent with neighbouring operations. Intercepts at Bandeira in the past few months are among the thickest and highest grades to date and we anticipate that the initial independently verified mineral resource estimate we expect to complete in the coming weeks will set a foundation for significant additional growth as we continue to drill Bandeira in the second half of the year.”

 

The upcoming NI 43-101 MRE will be completed by SGS Canada, capturing results from ~30,000 metres drilled at the Bandeira and Galvani targets. These two properties together cover only 872 hectares of the Company’s 14,182 hectares land package in Brazil’s “Lithium Valley”, a unique hard rock lithium district that is quickly emerging as an important global lithium producer.

 

In addition to continued drilling at its main targets, Bandeira and Galvani, a 20,000-metre drilling program is also underway on claims within its newly acquired Salinas project, which are directly adjacent to Latin Resources’ 13.3Mt @ 1.2% Li2O Colina lithium deposit. Exploratory drilling also continues at the Itira property, located less than a kilometre West of Galvani.

 

Figure 1: Bandeira Drill Highlights, Section Locations & Nearby Lithium Mines/Deposits

 

Table 1. Bandeira Drill Results

 

Hole ID Az Dip From To Metres Li2O (%)
ITDD-23-080 150 -53 255.5 261.7 6.2 1.49
ITDD-23-082 150 -85 50.6 56.4 5.8 2.17
and 99.9 102.2 2.3 1.04
and 196.2 201.0 4.8 1.48
ITDD-23-083 150 -53 59.1 66.1 7.0 1.37
and 172.2 177.2 5.0 2.17
and 310.7 314.0 3.2 1.29
and 372.7 379.8 7.1 2.29
ITDD-23-084 150 -50 275.4 284.9 9.4 1.31
ITDD-23-085 330 -65 73.4 74.5 1.1 0.67
ITDD-23-086 150 -73 69.9 72.1 2.2 1.48
and 272.5 283.3 10.8 1.04
incl. 272.5 278.0 5.5 1.36
and 293.7 299.9 6.2 1.33
ITDD-23-087 330 -50 56.9 71.0 14.0 1.31
incl. 56.9 64.9 7.9 1.50
incl. 67.8 71.0 3.2 1.58
ITDD-23-088 150 -53 83.3 86.3 3.0 0.96
and 199.9 202.6 2.7 1.59
and 206.0 210.2 4.2 1.87
and 272.5 274.6 2.2 2.21
ITDD-23-089 330 -60 63.3 72.0 8.8 1.37
and 155.5 161.5 6.0 1.22
ITDD-23-090 150 -87 161.7 170.0 8.2 1.03
incl. 166.0 170.0 4.0 1.29
and 259.5 263.5 4.0 1.80
and 387.0 390.0 3.0 1.62
and 442.9 445.7 2.8 1.79
and 465.6 471.9 6.2 1.57
and 564.5 567.5 3.0 1.56
ITDD-23-091 150 -88 29.8 31.2 1.4 1.32
and 112.1 113.6 1.5 1.30
and 426.0 427.3 1.2 1.23
and 479.8 482.0 2.2 2.04
and 486.0 489.2 3.2 0.82
ITDD-23-092 150 -81 92.8 95.8 3.0 1.58
and 103.8 109.4 5.6 1.23
ITDD-23-093 330 -60 43.7 51.7 8.0 1.47
ITDD-23-094 150 -50 80.6 88.3 7.7 1.63
ITDD-23-095 150 -50 46.4 48.5 2.1 0.70
and 190.3 191.7 1.3 0.79
and 205.4 206.9 1.5 1.13
and 216.2 223.1 6.9 1.38
ITDD-23-096 150 -80 89.0 97.2 8.2 1.62
ITDD-23-097 150 -50 38.7 44.1 5.4 1.48
ITDD-23-098 150 -50 pending
ITDD-23-099 150 -50 63.0 65.0 2.0 1.91
and     69.0 72.5 3.5 1.32
ITDD-23-100 150 -50 32.5 33.5 1.0 0.56
ITDD-23-101 0 -90 76.7 81.7 5.0 1.55

About Lithium Ionic Corp.

 

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its flagship Itinga and Salinas projects cover 14,182 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. The Itinga Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

 

Quality Assurance and Control

 

During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.

 

Qualified Persons

 

The technical information in this news release has been prepared by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, and both are “qualified persons” as defined in NI 43-101.

Posted June 6, 2023

Share this news article

MORE or "UNCATEGORIZED"


Red Pine Discovers Significant Gold Mineralization in Faulted Extension of the Jubilee Shear on the Wawa Gold Project

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

October 31, 2024

F3 Announces Closing of Private Placement for Aggregate Gross Proceeds of C$8 Million

F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE

October 31, 2024

Collective Mining Announces Closing of Concurrent Financings for Gross Proceeds of C$46.35 Million

Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE

October 31, 2024

ARIS MINING ANNOUNCES CLOSING OF US$450 MILLION SENIOR NOTES OFFERING TO FUND REDEMPTION OF OUTSTANDING 6.875% SENIOR NOTES

Aris Mining Corporation  (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE

October 31, 2024

Rare Element Resources Receives Final Approval Required to Commence Operations of Rare Earth Demonstration Plant in Wyoming

Staffing in place and operations shakedown underway Rare E... READ MORE

October 31, 2024

Copyright 2024 The Prospector News