The Prospector News

Denison Reports Financial and Operational Results for Q1 2023

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Denison Reports Financial and Operational Results for Q1 2023

 

 

 

 

 

Denison Mines Corp. (TSX: DML) (NYSE American: DNN) filed its Condensed Consolidated Financial Statements and Management’s Discussion & Analysis for the quarter ended March 31, 2023. Both documents will be available on the Company’s website at www.denisonmines.com, SEDAR (at www.sedar.com) and EDGAR (at www.sec.gov/edgar.shtml). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated.

 

David Cates, President and CEO of Denison commented, “Our Q1’2023 operational highlights showcase the multiple facets that make up our dynamic company.  During the quarter at our flagship Wheeler River project (‘Wheeler River’), we progressed our efforts on the Phoenix deposit (‘Phoenix’) Feasibility Study (‘FS’), incorporating results from the highly successful leaching and neutralization phases of the Feasibility Field Test (‘FFT’) completed in late 2022.  With the FS nearing completion, and the environmental assessment for Phoenix progressing in parallel to our technical de-risking efforts over the last several years, Phoenix remains squarely positioned to become the next new uranium mine in the eastern portion of the Athabasca Basin region. 

 

We also reported notable news from other assets in our vast project portfolio – including the discovery of high-grade uranium mineralization at the Moon Lake South exploration project and positive results from the completion of an internal concept study (‘Concept Study’) for the use of the in-situ recovery (‘ISR’) mining method at Denison’s 25.17% owned Midwest development project (‘Midwest’).  The discovery at Moon Lake South is in the very early stages and illustrates the untapped potential of our large exploration property portfolio.  Moon Lake South is a particularly exciting property, given that it is nearly surrounded by Denison controlled exploration properties and is adjacent to our flagship Wheeler River property.  At Midwest, we are collaborating with our long-time joint venture partner Orano Canada Inc., to take steps that could see Midwest emerge as another meaningful source of low-cost future production for Denison.  Based on the positive results of the Concept Study, the Midwest joint venture has approved a program and budget for 2023 that will support the further de-risking of the application of the ISR mining method at Midwest, and which may result in the completion of a Preliminary Economic Assessment (‘PEA’).

 

With truly meaningful developments ahead on multiple Denison projects and the uranium market benefiting from a sustained stream of positive developments increasing projections of global demand for nuclear power, Denison is well positioned to offer investors unique leverage to the uranium market from our multi-stage / multi-asset portfolio of high-grade Athabasca Basin projects.

 

Highlights

  • Completed an internal Concept Study examining the application of the ISR mining method at Midwest

 

The Company completed a Concept Study examining the potential application of the ISR mining method at Midwest. The Concept Study was prepared by Denison during 2022 and formally issued to the Midwest Joint Venture in early 2023. Based on the positive results of the Concept Study, the MWJV has provided Denison with approval to complete additional ISR-related work for Midwest in 2023.

 

Evaluation activities planned for Midwest during 2023 include the collection of deposit-specific information and the completion of select preliminary engineering studies to support the further evaluation and de-risking of the key criteria required to further assess the potential application of the ISR mining method, which may result in the preparation of a PEA to support the development, if warranted, of future field tests.

  • Discovered high-grade uranium mineralization at Moon Lake South

 

In April 2023, Denison reported that drill hole MS-23-10A intersected 1.38% eU3O8 over 8.7 metres (0.05% eU3O8 cut-off), including a sub-interval grading 2.88% eU3O8 over 3.1 metres, intersected approximately 30 metres above the unconformity in the Athabasca sandstone, as part of the recently completed winter exploration program at the Moon Lake South property. Uranium mineralization was encountered in four of the six drill holes completed during the 2023 winter exploration program, which was designed to evaluate the strike length of low-grade mineralized occurrences identified in the 2021 and 2016 drill programs.

  • Feasibility Study for Wheeler River Phoenix deposit on track for completion by mid-2023

 

Feasibility level engineering design, well field production modelling and cost estimation for the application of ISR mining for the high-grade Phoenix uranium deposit at Wheeler River progressed during the first quarter of 2023, and is currently on track to support the announcement of the results from the FS by mid-2023.

  • Released 2022 ESG report, highlighting progress on environmental, social and governance initiatives

 

In April 2023, Denison released its 2022 ESG Report, which provides information on the Company’s environmental, social and governance (‘ESG’) initiatives and demonstrates its ongoing commitment to sustainability and transparency. Denison’s 2022 ESG Report focuses on key ESG topics including the Company’s objective to maintain excellence in corporate governance practices, “best in class” engagement with communities potentially impacted by its activities, diversity in the Company’s workforce, and robust assessments of the environment and biodiversity in the regions within which it operates.

 

About Denison

 

Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories.

 

Denison is a uranium exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. A Pre-Feasibility Study (‘PFS’) was completed for Wheeler River in late 2018, considering the potential economic merit of developing Phoenix as an ISR operation and the Gryphon deposit as a conventional underground mining operation. Denison’s interests in Saskatchewan also include a 22.5% ownership interest in the MLJV, which includes several uranium deposits and the McClean Lake uranium mill, which is contracted to process the ore from the Cigar Lake mine under a toll milling agreement, plus a 25.17% interest in the Midwest Main and Midwest A deposits and a 67.41% interest in the Tthe Heldeth Túé (‘THT’, formerly J Zone) and Huskie deposits on the Waterbury Lake property. The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill.

 

Through its 50% ownership of JCU, Denison holds additional interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).

 

Denison’s exploration portfolio includes further interests in properties covering approximately 300,000 hectares in the Athabasca Basin region.

 

Denison is also engaged in post-closure mine care and maintenance services through its Closed Mines group, which manages Denison’s reclaimed mine sites in the Elliot Lake region and provides related services to certain third-party projects.

 

Posted May 11, 2023

Share this news article

MORE or "UNCATEGORIZED"


G Mining Ventures Reports First Quarter 2025 Results

G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to ... READ MORE

May 15, 2025

Firefly Metals Ltd. - Green Bay Copper-Gold Project, Canada

FireFly’s first drilling in new area hits high-grade VMS mi... READ MORE

May 15, 2025

INTEGRA REPORTS FIRST QUARTER 2025 RESULTS, DEMONSTRATING CONSISTENT PERFORMANCE FROM FLORIDA CANYON GOLD MINE AND GROWING CASH POSITION

Integra Resources Corp. (TSX-V: ITR) (NYSE: ITRG) is pleased to a... READ MORE

May 15, 2025

Black Mammoth Metals Reports Drill Results at Callaghan Gold Property, NV

Black Mammoth Metals Corporation (TSX-V: BMM) (OTC: LQRCF) is pl... READ MORE

May 14, 2025

Entrée Resources Announces Drill Results from Hugo North Extension, Including 260 Metres Grading 4.45% CuEq

Entrée Resources Ltd. (TSX:ETG) (OTCQB:ERLFF) is pleased to prov... READ MORE

May 14, 2025

Copyright 2025 The Prospector News