The Prospector News

GoGold Reports Parral Production for Quarter Ending March 2023

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

GoGold Reports Parral Production for Quarter Ending March 2023

 

 

 

 

 

GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) is pleased to report production for the quarter ending March 31, 2023 of 400,145 silver equivalent ounces, consisting of 173,717 silver ounces, 2,016 gold ounces, and 143 tonnes of copper.

 

“We continue to focus on completion of the preliminary economic assessment in Los Ricos North, followed by a revised resource and updated preliminary economic assessment for Los Ricos South in June,” said Brad Langille, President and CEO. “At Parral, our operations team has delivered a safe and environmentally friendly operation, which with the current prices should yield a positive financial result.”

 

Table 1: Quarterly Production Summary

 

Quarter Ended Dec 2021 Mar 2022 Jun 2022 Sep 2022 Dec 2022 Mar 2023
Silver Production (oz) 195,678 186,655 213,495 145,944 159,838 173,717
Gold Production (oz) 2,558 2,791 3,081 2,278 2,399 2,016
Copper Production (tonnes) 123 125 98 124 222 143
Silver Equivalent Production (oz)1 444,071 455,991 509,796 400,467 441,217 400,145
1. “Silver equivalent production” include gold ounces and copper tons produced and converted to a silver equivalent based on a ratio of the average market metal price for each period.  The gold:silver ratio for each of the periods presented was:  Dec 2021 – 77, Mar 2022 – 77, June 2022 – 83, Sep 2022 – 90, Dec 2022 – 82, Mar 2023 – 84.  The copper:silver ratios were: Dec 2021 – 417, Mar 2022 – 411, June 2022 – 415, Sep 2022 – 398, Dec 2022 – 377, Mar 2023 – 399.

 

Mr. Robert Harris, P.Eng. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release.

 

About GoGold Resources

 

GoGold Resources is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in Mexico.  The Company operates the Parral Tailings mine in the state of Chihuahua and has the Los Ricos South and Los Ricos North exploration projects in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of low cost, high margin projects.

 

Posted April 6, 2023

Share this news article

MORE or "UNCATEGORIZED"


Updated Kiniero Feasibility Study Achieves Increase +46% in Gold Reserves and +89% NPV to US$322M

HIGHLIGHTS: Increased Reserves Life Of Mine: Mineral Reserves inc... READ MORE

January 14, 2025

Asante Announces Bibiani Underground Feasibility Study Results

Asante Gold Corporation (CSE:ASE) (GSE:ASG) (FRANKFURT:1A9) (U.S.... READ MORE

January 14, 2025

Vital Battery Metals Drills 20.5m of 1.21% Cu Including 5.0m of 2.22% Cu at Sting Copper Project

Highlights Strong copper grades from maiden fall 2024 drill progr... READ MORE

January 14, 2025

Lithium Ionic Reports 32% Growth in Updated Mineral Resource Estimate at Baixa Grande - Salinas, Minas Gerais, Brazil

Lithium Ionic Corp. (TSX-V: LTH) (OTCQB: LTHCF) (FSE: H3N) is ple... READ MORE

January 14, 2025

TRX Gold Reports More High-Grade Intercepts at Stamford Bridge

Zone extended another 25 meters   TRX Gold Corporation (TSX: TRX... READ MORE

January 14, 2025

Copyright 2025 The Prospector News