The Prospector News

O3 Mining Intersects 3.7 g/t Au over 11.0 Metres at Norlartic Extension, Marban Engineering

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

O3 Mining Intersects 3.7 g/t Au over 11.0 Metres at Norlartic Extension, Marban Engineering

 

 

 

 

 

O3 Mining Inc. (TSX-V: OIII) (OTCQX: OIIIF) is pleased to provide an update on its continuing drilling program on its Marban Project in Val-d’Or, Quebec, Canada. The Corporation is reporting new significant results from 27 holes drilled in 2022 over recognized extensions of the Norlartic trend up to two kilometres towards the southeast of the Norlartic deposit and adjacent to the northern wall of the Marban pit. A total of 13,692 metres in 56 holes have been drilled during this program. Assay results from two holes are still pending.

 

Highlights:

  • 27 near surface economic intercepts reported today, including:
  • 3.7 g/t Au over 11.0 metres in hole O3MA-22-334 from 166.0 metres, 140 metres to the north-west of one of the possible satellite pits identified in the Pre-feasibility study (“PFS”);
  • 7.9 g/t Au over 3.2 metres in hole O3MA-22-423 from 39.1 metres, 400 metres to the east-south-east of one of the possible satellite pits identified in the PFS.

 

“These new results from our 2022 exploration program at Marban Engineering continue to highlight the potential to increase near-surface resources. In particular, the results published today suggest that with further work it may be possible to demontrate that the three satellite resource pits north of the Marban main pit could provide a basis to justify a single larger pit and show potential to expand eastward. O3 Mining’s President and Chief Executive Officer, Mr. Jose Vizquerra commented: ”

 

The Norlartic Extension trend has now been drilled over two kilometres at 80 metre spacings down to an average of 250 vertical metres. The dyke swarm hosting the gold mineralization at Norlartic Extension is geologically identical to the one hosting the Norlartic and Kierens mineralization. They correspond to mafic and intermediate fine-grained dykes, which have been successfully traced along the trend and serve as a marker to the mineralized corridor. The PFS resource estimate generated three small pits using historical drill results along the Norlartic Extension trend immediately north of the Marban pit. The new drill results obtained in that area returned additional significant intercepts, which suggest the possibility that an updated resource estimate could confirm and expand this inferred resource.

 

The Marban Dyke mineralization is associated with quartz vein stockwork hosted in felsic dykes. They correspond to a series of zones located in the north-eastern portion of the Marban pit. The three intercepts reported are located along the north-western extension of those zones or along a stacked zone located further north.

 

Figure 1 – Marban Project Surface Map

 

Figure 2 – Norlartic Extension Significant Intercepts

 

Table 1: Near Surface Expension Drill Hole Intercepts (only intercepts above 5.0 g/t Au*m are reported, cut-off 0.3 g/t Au and above 300m from surface)

 

Hole From
(m)
To
(m)
Grade
(g/t
Au)
Core
Length
(m)
Zone
O3MA-22-302 69.0 76.3 0.7 7.3 Norlartic
Extension
O3MA-22-320 287.5 294.7 1.0 7.2
O3MA-22-324 125.7 138.3 0.5 12.6
O3MA-22-327 76.8 82.0 1.4 5.2
O3MA-22-327 85.8 96.7 1.3 10.9
O3MA-22-334 166.0 177.0 3.7 11.0
O3MA-22-334 206.5 207.6 5.5 1.1
O3MA-22-340 101.3 107.1 0.9 5.8
O3MA-22-340 154.3 166.0 1.1 11.7
O3MA-22-358 46.1 52.5 0.9 6.4
O3MA-22-358 54.6 59.2 2.2 4.6
O3MA-22-360 34.5 39.5 2.7 5.0
O3MA-22-360 59.0 64.3 1.0 5.3
O3MA-22-360 74.0 83.5 1.3 9.5
O3MA-22-361 78.5 79.5 14.5 1.0
O3MA-22-365 170.4 179.0 0.9 8.6
O3MA-22-369 188.1 194.6 1.3 6.5
O3MA-22-381 93.0 94.5 5.3 1.5
O3MA-22-387 323.6 327 3.1 3.4
O3MA-22-412 32.5 35.5 1.8 3.0
O3MA-22-414 172.8 183.5 0.5 10.7
O3MA-22-423 25.3 26.5 4.2 1.2
O3MA-22-423 39.1 42.3 7.9 3.2
O3MA-22-443 37.5 39.5 2.6 2.0
O3MA-22-361 159.0 165.0 0.8 6.0 Marban
Dyke
O3MA-22-361 184.0 187.0 2.6 3.0
O3MA-22-377 213.0 213.6 20.2 0.6

 

The drilling campaign on Norlartic Extension comprises 56 drill holes totaling 13,692 metres. The parameters are listed in Table 2 for the entire program. Significant intercepts have been published in the last months (Press Release – July 6, 2022, and December 22, 2022) Those drill holes also contain a significant amount of intercepts with grade-thickness values below 5 m*g/t Au.

 

Table 2: Technical parameters of holes of the 2022 campaign on Norlartic Extension and Marban Dyke

 

Hole Azimuth
(°)
Dip (°) Start
Depth
(m)
End Depth
(m)
Length
(m)
UTM
Easting
(m)
UTM
Northing
(m)
O3MA-22-298 208 -60 0 287.8 287.8 278326 5336377
O3MA-22-299 208 -61 0 187.1 187.1 278125 5336368
O3MA-22-300 208 -50 0 278.8 278.8 278126 5336462
O3MA-22-301 212 -58 0 275.8 275.8 278077 5336467
O3MA-22-302 201 -50 0 240 240 278011 5336477
O3MA-22-303A 181 -47 0 192 192 277974 5336291
O3MA-22-304 181 -47 0 186 186 278027 5336353
O3MA-22-305 181 -47 0 195 195 278089 5336309
O3MA-22-306 181 -47 0 207 207 278064 5336283
O3MA-22-307 181 -47 0 147 147 278147 5336250
O3MA-22-309 181 -47 0 165 165 278204 5336212
O3MA-22-313 208 -53 0 279.1 279.1 278185 5336591
O3MA-22-317 208 -54 0 362.9 362.9 278183 5336694
O3MA-22-320 218 -62 0 342 342 278183 5336694
O3MA-22-322 209 -50 0 363 363 278275 5336349
O3MA-22-324 207 -47 0 279 279 278441 5336433
O3MA-22-327 206 -59 0 303 303 278465 5336338
O3MA-22-330 209 -69 0 276 276 278178 5336647
O3MA-22-333 207 -66 0 237 237 278226 5336569
O3MA-22-334 207 -55 0 250.3 250.3 278113 5336678
O3MA-22-338 213 -70 0 207 207 278042 5336567
O3MA-22-340 206 -57 0 267 267 278139 5336567
O3MA-22-344 205 -60 0 291.1 291.1 278041 5336726
O3MA-22-349 197 -45 0 149.9 149.9 277814 5336689
O3MA-22-350A 158 -77 0 180.1 180.1 277814 5336689
O3MA-22-353 194 -54 0 87 87 277869 5336600
O3MA-22-355 206 -57 0 207 207 277987 5336630
O3MA-22-357 207 -56 0 132 132 277934 5336555
O3MA-22-358 207 -56 0 135 135 277994 5336501
O3MA-22-360 207 -56 0 228 228 278143 5336436
O3MA-22-361 207 -56 0 204 204 278176 5336346
O3MA-22-362 206 -59 0 309 309 278526 5336450
O3MA-22-365 206 -68 0 281.9 281.9 278390 5336533
O3MA-22-367 207 -66 0 210 210 278275 5336492
O3MA-22-369 209 -69 0 201 201 278195 5336509
O3MA-22-372 210 -53 0 312 312 278241 5336430
O3MA-22-373 206 -55 0 359.6 359.6 278324 5336413
O3MA-22-377 206 -57 0 299.9 299.9 278352 5336319
O3MA-22-379 206 -57 0 318.2 318.2 278473 5336215
O3MA-22-381 150 -70 0 213 213 278530 5336380
O3MA-22-382 180 -45 0 195.2 195.2 278530 5336380
O3MA-22-384 207 -52 0 267 267 278628 5336132
O3MA-22-387 211 -62 0 330 330 278588 5336198
O3MA-22-388 207 -52 0 312 312 278860 5336056
O3MA-22-391 187 -61 0 171 171 279344 5335851
O3MA-22-394 187 -61 0 128.8 128.8 279484 5335760
O3MA-22-395 207 -56 0 191.6 191.6 279066 5336102
O3MA-22-398 207 -56 0 168.1 168.1 278974 5336099
O3MA-22-400 207 -56 0 257.9 257.9 278905 5336140
O3MA-22-403 206 -63 0 342 342 278938 5336203
O3MA-22-412 206 -57 0 351 351 279018 5336180
O3MA-22-414 207 -56 0 393 393 278835 5336180
O3MA-22-416 213 -69 0 288 288 278750 5336194
O3MA-22-419 207 -50 0 233.9 233.9 278744 5336181
O3MA-22-421 207 -73 0 230.9 230.9 278665 5336194
O3MA-22-431 187 -86 0 186 186 279125 5335873

 

 

Qualified Persons

 

The scientific and technical content of this news release has been reviewed, prepared and approved by Mr. Sébastien Vigneau (OGQ #993), Principal Geologist, who is a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

 

For further information on the Marban project, please see the technical report, entitled “NI 43-101 Pre-feasibility Study of the Marban Engineering Project” and dated October 7, 2022 (with an effective date of September 6, 2022), (the “Marban PFS”). Reference should be made to the full text of the Marban PFS for the assumptions, qualifications and limitations relating to the PFS. The Marban PFS is available on SEDAR (www.sedar.com) under O3 Mining’s issuer profile.

 

Mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

Quality Control and Reporting Protocols

 

Assays are uncut except where indicated. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Half-core samples are shipped to Agat laboratory in Val-d’Or, Québec, and Mississauga, Ontario for assaying. The core is crushed to 75% passing -2 mm (10 mesh), a 250 g split of this material is pulverized to 85% passing 75 microns (200 mesh) and 50 g is analyzed by Fire Assay (FA) with an Atomic Absorption Spectrometry (AAS) finish. Samples assaying >10.0 g/t Au are re-analyzed with a gravimetric finish using a 50 g charge. Commercial certified standard material and blanks are systematically inserted by O3 Mining’s geologists into the sample chain after every 18 core samples as part of the quality assurance and quality control (“QA/QC”) program. Third-party assays are submitted to other designated laboratories for 5% of mineralized samples. Drill program design, QA/QC, and interpretation of results are performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices.

 

About O3 Mining Inc.

 

O3 Mining Inc., an Osisko Group company, is a gold explorer and mine developer on the road to produce from its highly prospective gold camps in Québec, Canada. O3 Mining benefits from the support, previous mine-building success and expertise of the Osisko team as it grows towards being a gold producer with several multi-million-ounce deposits in Québec.

 

O3 Mining is well-capitalized and owns a 100% interest in all its properties (66,000 hectares) in Québec. O3 Mining trades on the TSX Venture Exchange and OTC Markets. The Corporation is focused on delivering superior returns to its shareholders and long-term benefits to its stakeholders.

 

Figure 1: Marban Project Surface Map (CNW Group/O3 Mining Inc.)

 

 

Figure 2: Norlartic Extension Significant Intercepts (CNW Group/O3 Mining Inc.)

 

Posted February 27, 2023

Share this news article

MORE or "UNCATEGORIZED"


Red Pine Discovers Significant Gold Mineralization in Faulted Extension of the Jubilee Shear on the Wawa Gold Project

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

October 31, 2024

F3 Announces Closing of Private Placement for Aggregate Gross Proceeds of C$8 Million

F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE

October 31, 2024

Collective Mining Announces Closing of Concurrent Financings for Gross Proceeds of C$46.35 Million

Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE

October 31, 2024

ARIS MINING ANNOUNCES CLOSING OF US$450 MILLION SENIOR NOTES OFFERING TO FUND REDEMPTION OF OUTSTANDING 6.875% SENIOR NOTES

Aris Mining Corporation  (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE

October 31, 2024

Rare Element Resources Receives Final Approval Required to Commence Operations of Rare Earth Demonstration Plant in Wyoming

Staffing in place and operations shakedown underway Rare E... READ MORE

October 31, 2024

Copyright 2024 The Prospector News