The Prospector News

Lithium South Drill Results – Holes AS03, AS05, and AS06

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Lithium South Drill Results – Holes AS03, AS05, and AS06

 

 

 

 

 

Lithium South Development Corporation (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to provide further drill results from the Alba Sabrina resource expansion drill program at the HMN Li Project, Salta, Argentina. Samples were taken using best industry practices and assays were performed by Alex Stewart Laboratories (ISO Certified) of Mendoza, Argentina. Excellent lithium values have been received from all holes completed to date and are reported below.

 

Hole AS03 was drilled to 260 meters. The average of depth-discrete packer samples is 663 mg/L Li, with a range of 320 to 752 mg/L Li. It was determined upon completion that the last sample taken at 260 meters (320 mg/L Li) was likely diluted by inflow from a shallow aquifer, due to a leak in the packer system.

 

After drilling and packer sampling, the borehole was completed as a long-screen monitor well. It was then developed to remove drilling mud and any fluids that entered during packer sampling. A sample taken from the long-screen well returned a value of 757 mg/L Li.

 

Hole AS05 was drilled to 220 meters. The average of the packer samples is 705 mg/L Li, with a range of 434 to 792 mg/L Li. The low concentration (434 mg/L) was measured in the shallowest sample (50 m depth).

 

Hole AS06 was drilled to 180 meters. The average of the packer samples is 644 mg/L Li, with a range from 525 to 710 mg/L Li.

 

Drilling to date has delineated a brine-containing sub-basin approximately 1.2 kilometers wide by 7.6 kilometers in length, extending northward from the main basin of Hombre Muerto Salar. The drill plan included a line of four core holes north to south along the axis of the sub-basin, and three control holes along the west side of the sub-basin.  The purpose of the control holes is to define the west side of the sub-basin and to determine if the western boundary was affected by freshwater inputs. All holes have encountered significant thicknesses of brine.

 

Hole AS07 (also a western boundary borehole) is in progress. When ASO7 is complete, the Company will publish an updated drill plan and results. The rig will then move to the Natalia Maria claim block located east of the current location. A road and drill pad have already been constructed.

 

An updated resource will be calculated when the Natalia Maria drill is completed and sampled.

 

Company President Adrian F.C. Hobkirk is quoted, “We are very pleased with the exploration results to date and look forward to the calculation of an upgraded lithium resource at the HMN Li Project.”

 

The technical and scientific information in this press release was reviewed and approved by Dr. Mark King, a Qualified Person under National Instrument 43-101. Dr. King participated in the preparation of this news release.

 

 



Drill targets for resource expansion on Alba Sabrina claim block.

Posted February 21, 2023

Share this news article

MORE or "UNCATEGORIZED"


Quimbaya Gold Closes $4 Million Financing and Expands Executive Team

Cornerstone investor brings proven regional track record; company... READ MORE

July 5, 2025

Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project

Spanish Mountain Gold Ltd. (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF)... READ MORE

July 4, 2025

Aura Announces Preliminary Q2 2025 Production Results

Aura Minerals Inc. (TSX: ORA) (B3: AURA33) (OTCQX: ORAAF) is plea... READ MORE

July 4, 2025

Cascadia Announces Closing of Financing

Cascadia Minerals Ltd. (TSX-V:CAM) (OTCQB:CAMNF) is pleased to an... READ MORE

July 4, 2025

Abcourt Closes US$ 8M Loan Facility to Start Sleeping Giant Mine

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

July 4, 2025

Copyright 2025 The Prospector News