The Prospector News

Ascot Drills Its Highest-Grade Intercept at the Day Zone: 199 g/t Gold Over 1.0 Metre

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ascot Drills Its Highest-Grade Intercept at the Day Zone: 199 g/t Gold Over 1.0 Metre

 

 

 

 

 

Ascot Resources Ltd. (TSX: AOT) (OTCQX: AOTVF) is pleased to announce the last remaining assay results from the 2022 exploration drill program at the Company’s Premier Gold Project  located on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of northwestern British Columbia. These results are from surface drilling for in-fill and exploration purposes at the Day Zone and the Big Missouri deposit, approximately six kilometres north of the past-producing Premier mill.

 

Highlights from the drill results include:

  • 26.56 g/t Au and 10.00 g/t Ag over 8.00m from a depth of 42.50m in hole P22-2459 at the Day Zone, including 198.50 g/t Au and 59.60 g/t Ag over 1.00m
  • 43.30 g/t Au and 20.90 g/t Ag over 1.50m from a depth of 55.00m in hole P22-2460 at the Day Zone
  • 6.13 g/t Au and 2.95 g/t Ag over 8.00m from a depth of 38.00m in hole P22-2449 at the Day Zone, including 14.70 g/t Au and 4.00 g/t Ag over 2.00m
  • 8.84 g/t Au and 10.45 g/t Ag over 5.07m from a depth of 87.93m in hole P22-2464 at the Big Missouri deposit, including 21.40 g/t Au and 20.10 g/t Ag over 1.00m
  • 9.11 g/t Au and 10.88 g/t Ag over 4.19m from a depth of 92.43m in hole P22-2462 at the Big Missouri deposit, including 16.95 g/t Au and 20.90 g/t Ag over 1.14m
  • From a total of 3,761 assays in the 2022 drill campaign, 42 assays (or 1.12%) returned in excess of 10 g/t Au. Those 42 samples average 53 g/t Au.

 

Note: True widths are estimated to be between 60% to 80% of reported interval widths.

 

This release summarizes the fourth and final batch of assay results from 2022 surface drilling at the Big Missouri deposit, as well as all holes drilled at the Day Zone. Twelve holes totaling 1,227 metres were drilled from two pads (BM4/22 and BM5/22) at the Day Zone and four holes totaling 495 metres were drilled from pad BM6/22 at the Big Missouri deposit, just south of the S1 Pit where the underground portal is located. An overview of drill pad and hole locations is shown in Figure 1. Summaries of assay results for the Day Zone and Big Missouri are shown in Tables 1 and 2, respectively.

 

Derek White, President and CEO of Ascot commented, “Having recently closed our financing for approximately C$200 million to complete construction of the Premier Gold Project, exploration results such as these are much more meaningful as they continue to reveal high gold grades and new zones of mineralization which could be exploited in the early years of the mine life. The headline intercept of 199 grams per tonne is the highest-grade interval Ascot has drilled at the Day Zone since its initial discovery in 2020 and aligned well with the predicted orientation of mineralization. We continue to be impressed with the resource expansion potential and are very excited about the exploration options for 2023 and enhancing the continuity and expansion of resources to the west of Big Missouri.”

 

Figure 1  https://www.globenewswire.com/NewsRoom/AttachmentNg/d431de2e-c03b-45a6-87e9-4a4df6f32e75

 

Day Zone drilling

 

Figure 2 shows an east-looking 3D cross section of drilling at the Day Zone. Holes drilled from pads BM4/22 and BM5/22 were targeting a 150 metre gap zone between previous drill pads. Drill holes from pad BM5/22 were successful in identifying continuity of mineralized zones from the south, as evidenced by hole P22-2459 which intercepted 198.50 g/t Au over 1.00m and hole P22-2460 which intercepted 43.30 g/t Au over 1.50m – both at similar elevations as previously planned stopes.

 

Holes drilled from BM4/22 were successful in identifying gold mineralization in a previously undrilled area, as evidenced by hole P22-2449 which intercepted 14.70 g/t Au over 2.00m. Hole P22-2453 intercepted 11.75 g/t Au over 1.00m adjacent to a previously planned stope to the north, implying an extension of mineralization.

 

In addition to mineralization being identified in the 150 metre gap zone, mineralization at the Day Zone remains open to the north and south.

 

Figure 2  https://www.globenewswire.com/NewsRoom/AttachmentNg/d2c9aa71-319b-4733-b98d-35107898db83

 

Figure 3  https://www.globenewswire.com/NewsRoom/AttachmentNg/81e291f0-753f-4a6e-88e3-d130c685f809

 

Table 1  Day Zone drill results

 

Hole # Azimuth

/dip

From

(m)

To

(m)

Width

(m)

Au
(g/t)
Ag
(g/t)
P22-2449 88/-43 38.00 46.00 8.00 6.13 2.95
incl. 38.00 40.00 2.00 14.70 4.00
and 88.00 89.53 1.53 7.84 14.80
P22-2450 88/-51 55.62 59.75 4.13 1.21 5.85
P22-2451 106/-54 14.00 20.00 6.00 3.57 3.70
incl. 14.00 16.00 2.00 7.74 7.30
and 41.00 45.50 4.50 5.24 2.51
incl. 43.30 45.50 2.20 7.74 2.00
P22-2452 106/-46 51.40 54.02 2.62 5.28 6.93
incl. 53.00 54.02 1.02 9.14 8.30
and 74.63 75.60 0.97 2.03 4.20
and 84.00 85.13 1.13 1.97 3.50
P22-2453 52/-45 60.59 71.50 10.91 4.02 4.36
incl. 64.50 65.50 1.00 11.75 10.70
P22-2454 54/-55 56.07 57.00 0.93 1.38 2.70
P22-2455 10/-75 8.00 10.00 2.00 1.42 4.30
and 49.00 58.39 9.39 2.18 9.76
incl. 57.42 58.39 0.97 9.02 29.10
P22-2456 55/-64 9.29 10.23 0.94 1.17 2.20
and 52.00 54.00 2.00 6.89 5.70
and 60.35 64.35 4.00 1.43 3.33
P22-2457 72/-45 4.88 7.00 2.12 1.53 2.90
and 49.50 50.80 1.30 1.08 2.40
and 76.74 77.80 1.06 1.21 4.70
P22-2458 93/-45 24.86 27.00 2.14 1.10 3.80
and 55.00 59.00 4.00 1.23 5.53
and 62.00 62.97 0.97 1.33 3.80
and 69.40 71.50 2.10 1.45 4.70
and 83.00 84.55 1.55 1.21 7.60
and 92.61 96.00 3.39 1.52 6.69
P22-2459 110/-65 32.02 33.90 1.88 1.88 14.50
and 42.50 50.50 8.00 26.56 10.00
incl. 42.50 43.50 1.00 198.50 59.60
and 54.50 55.50 1.00 1.89 9.90
and 59.50 64.00 4.50 2.19 3.78
P22-2460 132/-79 39.18 40.59 1.41 2.00 7.40
and 43.00 45.00 2.00 1.21 0.70
and 55.00 56.50 1.50 43.30 20.90

Note: True widths are estimated to be between 60% to 80% of reported interval widths.

 

Big Missouri drilling

 

At the end of the 2022 surface drill season at PGP, four drill holes totaling 495 metres were drilled from pad BM6/22 at the Big Missouri deposit. These holes were meant for in-fill and exploration purposes around existing planned stopes. High-grade gold mineralization was intercepted in and near planned stopes, including in hole P22-2464 which intercepted 8.84 g/t Au over 5.07m including 21.40 g/t Au over 1.00m, and hole P22-2462 which intercepted 9.11 g/t Au over 4.19m including 16.95 g/t Au over 1.00m.

 

Figure 4  https://www.globenewswire.com/NewsRoom/AttachmentNg/d65415b4-1957-4a4b-bffd-3c39ea4d7a21

 

Table 2  Big Missouri drill results

 

Hole # Azimuth

/dip

From

(m)

To

(m)

Width

(m)

Au
(g/t)
Ag
(g/t)
P22-2461 261/-66 95.44 97.10 1.66 1.13 1.50
and 129.00 130.15 1.15 1.83 1.50
P22-2462 275/-66 73.90 75.29 1.39 5.57 10.60
and 92.43 96.62 4.19 9.11 10.88
incl. 92.43 93.57 1.14 16.95 20.90
P22-2463 275/-55 83.08 84.08 1.00 3.96 2.40
and 86.08 87.08 1.00 2.67 4.50
and 101.35 102.35 1.00 6.97 5.70
P22-2464 285/-57 84.04 85.06 1.02 3.16 5.20
and 87.93 93.00 5.07 8.84 10.45
incl. 91.00 92.00 1.00 21.40 20.10
and 104.00 109.75 5.75 4.47 4.90
incl. 106.33 108.51 2.18 8.73 6.50

Note: True widths are estimated to be between 60% to 80% of reported interval widths.

 

Table 2 – Drill pad locations

 

Pad # UTM N UTM E Elevation (masl) Hole no.
BM4/22 435816 6219436 926.0 2449-2454
BM5/22 435845 6219375 933.0 2455-2460
BM6/22 436464 6219232 1,014.0 2461-2464

 

Qualified Person

 

Lawrence Tsang, P.Geo., the Company’s Senior Geologist provides the field management for the PGP exploration program. John Kiernan, P.Eng., Chief Operating Officer of the Company is the Company’s Qualified Person (QP) as defined by National Instrument 43-101 and has reviewed and approved the technical contents of this news release.

 

Quality Assurance/Quality Control

 

Analytical work is being carried out by ALS Canada Ltd. Ascot’s quality-assurance and quality-control program includes the use of analytical blanks to monitor for cross contamination, certified reference material standards to assess analytical accuracy, and duplicate samples to quantify sampling precision. This is in addition to the internal quality assurance program employed by ALS.

 

Samples are dried and weighed by ALS. They are then crushed to 75% passing 2mm, with 250g split and pulverized to 85% passing 75µm. Samples are processed at the ALS preparation lab in Terrace and sent to ALS in North Vancouver for analysis. There, all samples are dissolved using four acid digestion with an ICP-AES finish and fire assay with AA finish for gold. Samples over 100ppm silver are digested with aqua regia and then volumetrically diluted before an ICP-AES or AA finish (up to 1,500ppm). Samples over 1,500ppm silver are fire assayed with a gravimetric finish. Samples over 10ppm gold are fire assayed with a gravimetric finish. Identified or suspected metallic gold or silver are subjected to “metallics” assays. Sampling and storage is located at the Company’s secure facility in Stewart, British Columbia.

 

 

About Ascot Resources Ltd.

 

Ascot is a Canadian junior exploration and development company focused on re-starting the past producing Premier gold mine, located on Nisga’a Nation Treaty Lands, in British Columbia’s prolific Golden Triangle. Concurrent with progressing the development of Premier, the Company continues to successfully explore its properties for additional high-grade underground resources. Ascot is committed to the safe and responsible development of Premier in collaboration with Nisga’a Nation as outlined in the Benefits Agreement.

 

Posted January 23, 2023

Share this news article

MORE or "UNCATEGORIZED"


Red Pine Discovers Significant Gold Mineralization in Faulted Extension of the Jubilee Shear on the Wawa Gold Project

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

October 31, 2024

F3 Announces Closing of Private Placement for Aggregate Gross Proceeds of C$8 Million

F3 Uranium Corp. (TSX-V: FUU) (OTC Pink: FUUFF) is pleased to ann... READ MORE

October 31, 2024

Collective Mining Announces Closing of Concurrent Financings for Gross Proceeds of C$46.35 Million

Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) is pleased to ann... READ MORE

October 31, 2024

ARIS MINING ANNOUNCES CLOSING OF US$450 MILLION SENIOR NOTES OFFERING TO FUND REDEMPTION OF OUTSTANDING 6.875% SENIOR NOTES

Aris Mining Corporation  (TSX: ARIS) (NYSE-A: ARMN) announces t... READ MORE

October 31, 2024

Rare Element Resources Receives Final Approval Required to Commence Operations of Rare Earth Demonstration Plant in Wyoming

Staffing in place and operations shakedown underway Rare E... READ MORE

October 31, 2024

Copyright 2024 The Prospector News