The Prospector News

Blackrock Drills 6,526 g/t AgEq over 0.91m Within 1.52m Grading 3,942 g/t AgEq and Steps Out to West and South at Tonopah West

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Blackrock Drills 6,526 g/t AgEq over 0.91m Within 1.52m Grading 3,942 g/t AgEq and Steps Out to West and South at Tonopah West

 

 

 

 

 

Blackrock Silver Corp. (TSX-V: BRC) is pleased to announce drill results from the Company’s ongoing step-out and in-fill drilling programs on its 100% controlled Tonopah West project located in West Central Nevada along the Walker Lane trend.

 

These results demonstrate continued expansion of the key known mineralized structure on the project, the Denver vein system (also known as “Victor”), by an additional 600 metres to the Northwest, which has now grown to over 3 kilometres of drill-defined strike, and is projected to remain open to the west. In addition, assays have encountered a substantial new zone of mineralization to the south, including our highest-grade and shallowest intercept at the project to date.

 

Highlights:

  • Core hole TXC22-057 has delivered the highest-grade intercept at the project to date, intersecting 0.91 metres of 37.86 g/t Au and 2,740 g/t Ag or 6,526.7 g/t AgEq within 1.52 metres grading 22.88 g/t Au and 1,654.1 g/t Ag or 3,942.2 g/t AgEq starting at 191.42 metres down-hole in the New Discovery area along the southern edge of the DPB resource area (AgEq_= Ag_g/t + Au_g/t*100).;
  • RC hole TW22-118 intersected 1.52 metres of the Denver vein grading 1.70 grams per tonne  gold  and 0.1 g/t silver  or 171 g/t silver equivalent a full 1.6 kilometres northwest of the DPB resource area. A follow-up core drillhole is planned to target for higher-grades at a more favourable elevation;
  • Drilling continues to expand the mineralized footprint well beyond the April 2022 resource boundary and remains open to the south, northwest, and at depth; and
  • Two drill rigs are operating at site and assays for 10 drillholes are pending at this time.

 

Andrew Pollard, Blackrock’s President and CEO, stated, “With two drill rigs at site, the latest assays from our ongoing 25,000 metre programme have materially expanded the footprint of known mineralization at the project, both to the northwest and to the south, delivering what is our highest-grade and shallowest intercept to date for the project in a new and quickly developing target area. The Denver vein system, which includes Victor, continues to show significant resource expansion potential, as step-out drilling has now tracked it an additional 1.6 kilometres to the northwest beyond the DPB resource area, with a further 500 metre step-out planned as part of this programme. Our exploration model, of which continues to be validated, indicates that this structure remains wide open to the west, where we have an additional 1600 metres of strike potential to our consolidated Tonopah property boundary. It’s clear that the project also has very deep roots and it remains open at depth as we’ve yet to find the bottom of the mineralized system.”

 

Table 1: Significant Tonopah West drillhole assays using a 150 g/t AgEq cut off

 

Hole ID Area From (m) To (m) Length (m) Gold (gpt) Silver (gpt) AgEq (gpt)
TW22-118 NW Step Out 428.25 429.77 1.52 1.700 0.1 170.1
TXC22-051 NW Step Out NSV
TXC22-052 NW Step Out 583.94 588.54 4.60 0.627 148.1 210.9
Including 584.61 585.28 0.67 1.890 513.0 702.0
TXC22-052 NW Step Out 592.38 594.64 2.26 0.325 132.3 164.8
TXC22-053 NW Step Out 674.52 676.05 1.52 1.610 3.4 164.4
TXC22-054 DPB 440.13 440.44 0.31 1.810 127.0 308.0
TXC22-055 NW Step Out NSV
TXC22-056 New Discovery NSV
TXC22-057 New Discovery 191.42 192.94 1.52 22.881 1654.1 3942.2
Including 192.02 192.94 0.91 37.867 2740.0 6526.7
TXC22-058 New Discovery 220.07 221.29 1.22 1.650 10.2 175.2
TXC22-059 New Discovery 237.44 239.94 2.50 0.755 83.6 159.1
TXC22-060 New Discovery 225.28 225.89 0.61 0.869 75.0 161.9
AgEq_g/t = Ag_g/t + Au_g/t*100; AuEq_g/t = Au_g/t + Ag_g/t/100. True thickness unknown. NSV = No significant values

 

 

Figure 1: Tonopah West drillhole location map showing the location of drillholes mentioned in this news release (green dots)

 

Northwest Step Out Target

 

Drillholes TXC22-051 through -053 and TXC22-055 were completed in the Northwest Step Out target area. Drillhole TXC22-052 is 1,000 metres northwest of the DPB resource area and returned 4.6 metres grading 211 g/t AgEq beneath the Mizpah Andesite.

 

Data compilation in the Northwest Step Out target shows that drillhole TW22-118 encountered a mineralized structure and returned 170 g/t AgEq over 1.52 metres within the Mizpah Andesite; however, the drillhole terminated above the projected pay zone. TW22-118 is an additional 600 metres west of TXC22-052. Drillhole TW22-117 is 500 metres west of TW22-118. The drillhole encountered the Mizpah Andesite, but was called at 762 metres; thus not testing the mineralized structure beneath the Mizpah.

 

TXC22-055 was drilled to test the vein structure beneath the Mizpah andesite; however, the drillhole encountered a fault which off set the vein farther to the north. No significant assays were returned, but a better understanding of the cross structure was obtained from the drill information which will help to guide future drilling.

 

Blackrock’s property boundary extends an additional 1,600 metres west of TW22-117. From the DPB resource area to the edge of the Company’s property boundary, drilling suggests major potential along a 3,700-metre corridor immediately beneath the Mizpah Andesite. The vein system is in a similar stratigraphic position as the Denver vein drilled in the Victor and DPB resource areas. The known strike of the Denver is 1,300 metres drilled in the Victor (500 m) and DPB (800m) resource areas. The Northwest Step shows an additional 3,700 metres of potential along the Denver vein system bringing the total to 5,000 metres of potential high-grade silver and gold on the Tonopah West project (See figure 1). Assay are pending from two core holes, and an additional five pre-collars are complete awaiting core tails.

 

New Discovery Target

 

Drilling in the New Discovery target was designed to follow up on Coeur Mining’s 2018 drilling where drillhole TW18-004 encountered a 4.5 metre zone grading 4.933 g/t Au, 337 g/t Ag or 830 g/t AgEq.

 

Core holes TXC22-056, -057, -058, -059 and TXC22-060 were completed in the target area. Core hole TXC22-057 returned one of the highest grade gold and silver intercepts from the project with over one ounce of gold (37.8 g/t Au) and 2.7 kilograms of silver reported over a 0.91 metre interval. Drillholes TXC22-058, -59 and TXC22-060 all returned significant precious metal assays from the target. Expansion potential is evident, and additional drilling is highly warranted.

 

Victor Target

 

Five core holes were completed in the Victor target to test down-dip extensions and footwall vein structures. The drillholes encountered vein material and all assays are currently pending.

 

DPB Target

 

Four core drillholes are complete in the DPB area and an additional four are awaiting core tails. Core hole TXC22-054 was drilled to test step-out mineralization encountered in previous drilling (TW21-110). The core hole crossed a north-northwest fault which is believed to be the same structure encountered in TXC22-055. The fault appears to offset mineralization to the north on the west side of the fault. Based on the interpretation of the faults. The DPB area appears to be within a graben bounded on the east and west by north-northwest oriented faults.

 

The Company is using this new information to help guide continuing exploration of the Tonopah West property and the Tonopah district.

 

Table 2: Location information for drillholes reported in this new release

 

Hole ID UTM11 NAD27 East UTM11 NAD27 North Elevation (m) Total Depth (m) Azimuth Inclination
TW22-117 475734.9 4215296.0 1710.9 762.0 0 -90
TW22-118 476242.1 4215180.1 1726.0 641.6 0 -90
TXC22-051 476929.7 4215492.2 1758.1 1212.5 180 -90
TXC22-052 476769.5 4214867.8 1743.4 695.9 180 -80
TXC22-053 476765.2 4215197.7 1744.1 852.8 180 -80
TXC22-054 477345.6 4214041.4 1759.3 599.8 180 -55
TXC22-055 477188.0 4214642.8 1756.7 788.8 180 -75
TXC22-056 477900.1 4213241.9 1776.4 351.4 180 -70
TXC22-057 478047.4 4213253.0 1786.3 296.0 180 -70
TXC22-058 478148.2 4213045.0 1790.9 338.9 180 -70
TXC22-059 478053.7 4213420.3 1777.0 319.1 180 -80
TXC22-060 478053.6 4213419.7 1777.0 299.6 180 -65

 

Quality Assurance/ Quality Control

 

All sampling is conducted under the supervision of the Company’s project geologists, and a strict chain of custody from the project to the sample preparation facility is implemented and monitored. The reverse circulation samples are hauled from the project site to a secure and fenced facility in Tonopah, Nevada, where they are loaded on to American Assay Laboratory’s (AAL) flat-bed truck and delivered to AAL’s facility in Sparks, Nevada. A sample submittal sheet is delivered to AAL personnel who organize and process the sample intervals pursuant to the Company’s instructions.

 

The reverse circulation, and QA/QC samples are crushed and pulverized, then the pulverized material is digested and analyzed for Au using fire assay fusion and an Induced Coupled Plasma (ICP) finish on a 30-gram assay split. Silver is determined using five-acid digestion and ICP analysis. Over limits for gold and silver are determined using a gravimetric finish. Data verification of the assay and analytical results are completed to ensure accurate and verifiable results. Blackrock personnel insert a blind prep blank, lab blank or a certified standard approximately every 15th to 20th sample.

 

Blackrock’s exploration activities at the Tonopah North and Tonopah West projects are conducted and supervised by Mr. William Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist #11041, is a Qualified Person as defined under National Instrument 43-101. He has reviewed and approved the contents of this news release.

 

About Blackrock Silver Corp.

 

Blackrock is a junior precious metals focused exploration company that is on a quest to make an economic discovery. Anchored by a seasoned Board, the Company is focused on its Nevada portfolio of properties consisting of low-sulphidation epithermal gold & silver projects located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

 

Posted October 18, 2022

Share this news article

MORE or "UNCATEGORIZED"


1911 Gold Closes C$13.2 Million “Bought Deal” Life Offering Including Increased Investment by Eric Sprott

1911 Gold Corporation (TSX-V: AUMB) (FRA: 2KY) is pleased to anno... READ MORE

July 17, 2025

Maritime Resources Announces Closing of $11.5 Million Brokered Private Placement Financing

Maritime Resources Corp. (TSX-V: MAE) is pleased to announce the ... READ MORE

July 17, 2025

Sitka Intersects 47.6 Metres of 2.09 g/t Gold, Including 8.0 Metres of 5.07 g/t Gold near Surface at the Saddle Zone at Its RC Gold Project, Yukon

Initial follow-up drilling at Saddle Zone identifies intersections of ne... READ MORE

July 17, 2025

Focus Graphite Ships Battery-Grade Samples to Prospective Offtake Partners in the United States

Includes battery-grade spec anode material and a high-performance... READ MORE

July 17, 2025

NexMetals Receives US$150 Million Letter of Interest from the Export-Import Bank of the United States for Its Critical Metals Projects in Botswana

NexMetals Mining Corp. (TSX-V: NEXM) (NASDAQ: NEXM) is pleased to... READ MORE

July 17, 2025

Copyright 2025 The Prospector News