
Millennial Precious Metals Corp. (TSX-V: MPM) (OTCQB: MLPMF) is pleased to provide results from the Phase 1 drill program at its Wildcat project located in Nevada, USA. The 2022 drill program at Wildcat consisted of 12 holes totaling ~1,250m. The program was designed for infill drilling for mineral resource conversion, geotechnical data for pit wall design, metallurgical data (bottle roll and column tests), and to test gold mineralization below the oxidation profile. Phase 1 drilling will support the updated mineral resource and PEA expected to be released following the completion of metallurgical column testing and various mining studies.
Highlights:
Drillhole WCCD-0006 returned an intercept of 0.39 g/t oxide Au over 120.2m from surface, including ~50m of oxidized mineralization below the 2020 NI 43-101 pit shell. Drillhole WCCD-0007 returned an intercept of 0.51 g/t oxide Au over 50.0m, including 0.98 g/t oxide Au over 11.3m. Drillhole WCCD-0010 returned an intercept of 0.87 g/t oxide Au over 42.7m, ~50m outside the 2020 NI 43-101 pit shell and 0.20 g/t oxide Au over 15.2m (refer to Table 1 for detailed interval results).
Jason Kosec, President, CEO & Director of Millennial stated, “We are pleased with the continued success from Phase 1 drilling at Wildcat. Results from WCCD-0006 and WCCD-0007 demonstrate excellent grade continuity which continues to support robust resource conversion that will be demonstrated in the updated mineral resource. The oxidation profile observed is significantly deeper than previously modeled (primarily from RC holes) which is very exciting to see. In addition, WCCD-0010 unexpectedly intercepted high-grade oxide mineralization north of the proposed limit of the pit, further demonstrating the significant growth potential at Wildcat.”
Table 1: WCCD-0006, WCCD-0007, and WCCD-0010 Detailed Intercept Results
Hole No. | From (m) | To (m) | Interval (m) | Au (g/t) |
WCCD-0006 | 0.9 | 121.0 | 120.2 | 0.39 |
including | 0.9 | 15.9 | 15.0 | 0.68 |
WCCD-0007 | 13.1 | 63.1 | 50.0 | 0.51 |
including | 27.4 | 38.7 | 11.3 | 0.98 |
WCCD-0010 | 47.2 | 89.9 | 42.7 | 0.87 |
and | 10.7 | 25.9 | 15.2 | 0.20 |
Note: Considering the broad shape of mineralization, all intersects are estimated to represent 70-100% of true width. |
Wildcat Project Overview:
Wildcat is located within the Farrell mining district in Nevada, 56km north of the town of Lovelock within Pershing County. The property can be accessed by year-round roads from Lovelock via State Route 399 and Seven Troughs Road. The 17,612-acre land package consists of 916 unpatented claims and 4 patented claims. The claims are located on federally owned lands administered by the U.S. Bureau of Land Management (BLM). The mineralization at Wildcat consists of a gold-dominated, low sulphidation, epithermal vein system with oxidized, disseminated sulphide mineralization hosted in volcanic and intrusive rocks. The Inferred mineral resource estimate at Wildcat contains 776,000 ounces of Au (oxide) (60.8 million tonnes at 0.40 g/t Au; effective date of November 18, 2020). A technical report for the Wildcat Project is available on Millennial’s issuer profile on SEDAR at www.sedar.com.
ABOUT MILLENNIAL PRECIOUS METALS CORP.
Millennial Precious Metals is an exploration and development company focused on unlocking quality ounces through the responsible expansion of its eight gold and silver projects located in Nevada and Arizona, USA. The Company plans to accelerate the development of its two flagship projects located in Nevada: Wildcat and Mountain View. The Wildcat Inferred Mineral Resource estimate contains 776,000 ounces of oxide Au (60.8 million tonnes at 0.40 g/t Au; effective date of November 18, 2020) and the Mountain View Inferred Mineral Resource estimate contains 427,000 ounces of oxide Au (23.2 million tonnes at 0.57 g/t Au; effective date of November 15, 2020). Technical reports titled “NI 43-101 Technical Report Resource Estimate for the Wildcat Project, Pershing County, Nevada, United States”, dated November 20, 2020 with an effective date of November 18, 2020 prepared by William J. Lewis, B.Sc., P.Geo., Rodrigo Calles-Montijo, MSc., CPG, and Leonardo de Souza, MAusIMM (CP) and “NI 43-101 Technical Report for the Mountain View Project, Washoe Country, Nevada, USA”, dated November 25, 2020 with an effective date of November 15, 2020, prepared by William J. Lewis, B.Sc., P.Geo., Rodrigo Calles-Montijo, MSc., CPG, and Leonardo de Souza, MAusIMM (CP) are available on Millennial’s issuer profile on SEDAR at www.sedar.com.
Millennial Precious Metals is led by an experienced management team and board of directors with a proven track record of success in financing and developing high-quality mining projects. The Company is well positioned to create value for all stakeholders by applying a systematic strategy to advance and de-risk all eight projects over the next few years.
QUALIFIED PERSON
The information in this news release was reviewed and approved by Raphael Dutaut, Ph.D., P.Geo., Vice President, Exploration for Millennial Precious Metals Corp. Mr. Dutaut is a QP as defined by NI 43-101.
Figure 1: WCCD-0006 Cross Section from A – A’. Mineralization Hosted Within the Rhyolite Tuff (green), Granodiorite Intrusion (purple). (CNW Group/Millennial Precious Metals Corp.)
Figure 2: WCCD-0007 Cross Section from B – B’. Mineralization Hosted Within the Rhyolite Tuff (green), Granodiorite Intrusion (purple). (CNW Group/Millennial Precious Metals Corp.)
Figure 3: WCCD-0010 Cross Section from C – C’. Mineralization Hosted Within the Rhyolite Tuff (green), Granodiorite Intrusion (purple). (CNW Group/Millennial Precious Metals Corp.)
Goldshore Resources Inc. (TSX-V: GSHR) (OTCQB: GSHRF) (FWB: 8X00)... READ MORE
Latest diamond drill results confirm strong gold continuity acros... READ MORE
G Mining Ventures Corp. (TSX: GMIN) (OTCQX: GMINF) is pleased to ... READ MORE
FireFly’s first drilling in new area hits high-grade VMS mi... READ MORE
Integra Resources Corp. (TSX-V: ITR) (NYSE: ITRG) is pleased to a... READ MORE