The Prospector News

NORTHCLIFF ANNOUNCES AGGREGATE C$5.95 MILLION LOAN FUNDING

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

NORTHCLIFF ANNOUNCES AGGREGATE C$5.95 MILLION LOAN FUNDING

 

 

 

 

 

Northcliff Resources Ltd. (TSX: NCF) is pleased to announce that it has entered into two secured loan agreements  for an aggregate amount of up to C$5.95 million with Todd Sisson (NZ) Limited, a subsidiary of the Todd Corporation, the Company’s largest shareholder.

 

The Loan Funding will be used to fund the 2022 work program at the Sisson Tungsten-Molybdenum Project, which will include the following planned programs (subject to availability of vendors):

  • Geotechnical drilling and testing program that is designed to provide information on the site characterization and support additional design detail of the Tailings Storage Facility.  The Phase 1 Drilling Program will also support other engineering related activities and respond to certain provincial Environmental Impact Assessment conditions which are to be complied with prior to the start of construction;
  • Archeological work program to undertake mitigation activities in compliance of EIA conditions; and
  • Development of an engagement plan addressing EIA conditions of significance to local First Nations.

 

The Company is currently in the process of shortlisting potential vendors, reviewing bids and finalizing technical services agreements in conjunction with the planned Phase 1 Drilling Program and Phase 1 Field Program.

 

The proceeds from the Loan Funding will also be used to fund the following 2022 corporate activities:

  • Advancing offtake and project finance discussions with interested parties;
  • Continued participation and funding outreach in conjunction with the Critical Minerals Joint Action Plan between Canada and the United States; and
  • General working capital purposes.

 

Loan 1 is a secured loan facility in the amount of C$750,000, will bear interest at a rate of 10% per annum, and has a term of up to 6 months with the interest payable at maturity.  The loan and accrued interest are repayable at any time by the Company without penalty, but must be settled at the earlier of a) maturity or b) from the proceeds of Tranche 1 of Loan 2.

 

Loan 2 is a secured loan facility in the amount of C$5.2 million, will bear interest at a rate of 10% per annum and can be drawn down in 4 tranches:  Tranche 1 – C$2.0 million, Tranche 2 – C$1.0 million, Tranche 3 – $1.0 million and Tranche 4 – C$1.2 million.  Each of the Tranche drawdowns is subject to the satisfaction of certain condition precedents and has a term of 12 months with the interest payable at maturity.  The loan and accrued interest are repayable at any time by the Company without penalty, or can be settled at any time prior to maturity, either through issuances of shares in the Company or transfer of part of the Company’s interest in the Sisson Project Limited Partnership and its general partner, Sisson Mines Ltd. at the election of Todd.  The conversion price used for the Share Settlement or Partnership Settlement will be the 30-day volume weighted average share price of the Company on the Toronto Stock Exchange, ending on and including the date of the conversion notice with a 35% discount applied, in the case of a Share Settlement.

 

Loan 1 is exempt from the formal valuation and disinterested shareholder approval requirements of MI 61-101 Protection of Minority Security Holders in Special Transactions pursuant to the di minimis exemption contained therein.

 

Loan 2 is subject to the formal valuation and disinterested shareholder approval requirements under MI 61-101. As such, the valuation of Sisson Project Limited Partnership and its general partner, Sisson Mines Ltd. is being prepared by SLR Consulting Limited.  The Company’s Extraordinary General Meeting is scheduled for August 25, 2022, at which the Company will seek disinterested shareholder approval of the conversion terms of Loan 2.  The record date for the EGM is July 20, 2022.  The board of the Company has recommended that disinterested shareholders approve the conversion terms of Loan 2.

 

The terms of Loan 1 and Loan 2 are also subject to regulatory approval.

 

The Company has amended the terms of the outstanding C$1,000,000 loan facility with Todd that was previously announced on August 30, 2021, such that Todd has the right to convert the 2021 Loan concurrently with the closing of any equity capital financing transaction (whether by way of public offering, private placement, rights offering or otherwise) by the Company  to the extent that the Offering closes before the maturity date of any tranche under the 2021 Loan.  All other terms of the 2021 Loan remain unchanged.

 

Todd currently holds 47.83% of the issued and outstanding shares of Northcliff and an 11.5% interest in the Sisson Partnership.  Northcliff owns an 88.5% interest in the Sisson Partnership, which owns the Sisson Tungsten-Molybdenum Project.

 

Andrew Ing, CEO commented: “We are looking forward to a successful work program that will advance the project towards construction and working collaboratively with the regulator in New Brunswick and First Nations”.

 

About Northcliff Resources Ltd.

 

Northcliff is a mineral resource company focused on advancing the feasibility-stage Sisson Tungsten-Molybdenum Project located in New Brunswick, Canada, to production.

Posted June 23, 2022

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News