The Prospector News

Marathon Gold Secures U$81 Million of Equipment Financing for Project Development and Mining Operations at the Valentine Gold Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Marathon Gold Secures U$81 Million of Equipment Financing for Project Development and Mining Operations at the Valentine Gold Project

 

 

 

 

 

Marathon Gold Corporation (TSX: MOZ) is pleased to announce the execution of a credit-approved commitment letter with Caterpillar Financial Services Limited for equipment lease financing related to the development and operation of the Valentine Gold Project located in central Newfoundland.

 

Matt Manson, President and CEO of Marathon, commented: “We are very happy to be announcing today our equipment leasing commitment with Cat Financial, another significant milestone in our project financing arrangements for the Valentine Gold Project. This agreement will provide financing for the Project’s mobile mining equipment through project development and into the first several years of mining operations at an attractive overall cost of capital for Marathon.”

 

The commitment letter announced today with Cat Financial contemplates US$81 million of equipment leasing for Caterpillar trucks, excavators, graders, loaders, and dozers, for the purpose of loading, hauling, road maintenance, waste dump maintenance and primary pit support for the Project. The Cat Financial lease will be available to the Company upon release of the Project from its federal Environment Assessment process, review of the Project’s updated Feasibility Study, satisfaction of a cost to complete certification, and other customary conditions.

 

About Marathon

 

Marathon is a Toronto based gold company advancing its 100%-owned Valentine Gold Project located in the central region of Newfoundland and Labrador, one of the top mining jurisdictions in the world. The Project comprises a series of five mineralized deposits along a 20-kilometre system. An April 2021 Feasibility Study outlined an open pit mining and conventional milling operation over a thirteen-year mine life with a 31.5% after-tax rate of return. The Project has estimated Proven Mineral Reserves of 1.40 Moz (29.68 Mt at 1.46 g/t) and Probable Mineral Reserves of 0.65 Moz (17.38 Mt at 1.17 g/t). Total Measured Mineral Resources (inclusive of the Mineral Reserves) comprise 1.92 Moz (32.59 Mt at 1.83 g/t) with Indicated Mineral Resources (inclusive of the Mineral Reserves) of 1.22 Moz (24.07 Mt at 1.57 g/t). Additional Inferred Mineral Resources are 1.64 Moz (29.59 Mt at 1.72 g/t Au). Please see Marathon’s Annual Information Form for the year ended December 31, 2021 and other filings made with Canadian securities regulatory authorities and available at www.sedar.com for further details and assumptions relating to the Valentine Gold Project.

 

Posted June 13, 2022

Share this news article

MORE or "UNCATEGORIZED"


Delta Reports New Gold Intercept at Nova Target in Wedge Area, 4 Kilometres West of Eureka; Follow-Up Drill Program Underway

Delta Reports New Gold Intercept at Nova Target in Wedge Area, 4 ... READ MORE

February 4, 2026

Silver One Announces Closing Of Final Tranche Of $32 Million Financing

Silver One Resources Inc. (TSX-V: SVE) (OTCQX: SLVRF) (FSE: BRK1)... READ MORE

February 4, 2026

SAGA Metals Achieves 100% Drilling Success in 2025—Reports Final Assays from Trapper South at Radar Critical Minerals Project in Labrador

Exceptional grades of Titanium, Vanadium and Iron in all 15 drill... READ MORE

February 4, 2026

Near Surface Intersection Yields 6.58 g/t gold over 10.35 metres

Intersection is within 33 metres from surface and contained in a ... READ MORE

February 4, 2026

Alamos Gold Provides Three-Year Operating Guidance Outlining 46% Production Growth by 2028 at Significantly Lower Costs

Further production growth to one million ounces annually expected... READ MORE

February 4, 2026

Copyright 2026 The Prospector News