The Prospector News

GCM Mining Files National Instrument 43-101 Technical Report for Its Segovia Operations

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

GCM Mining Files National Instrument 43-101 Technical Report for Its Segovia Operations

 

 

 

 

GCM Mining Corp. (TSX: GCM) (OTCQX: TPRFF) announced that it has filed an updated Prefeasibility Study technical report for its Segovia Operations pursuant to National Instrument 43101 – Standards of Disclosure for Mineral Projects. The Technical Report, which supports the disclosure made by the Company in its March 24, 2022 news release and its 2021 Annual MD&A dated March 31, 2022, was prepared by SRK Consulting (U.S.), Inc. and is based on the updated Mineral Reserve and Mineral Resource estimates for the Segovia Operations with an effective date of December 31, 2021.

 

About GCM Mining Corp.

 

GCM Mining is a mid-tier gold producer with a proven track record of mine building and operating in Latin America. In Colombia, the Company is a leading high-grade underground gold and silver producer with several mines in operation at its Segovia Operations. Segovia produced 206,389 ounces of gold in 2021. In Guyana, the Company is advancing its fully funded Toroparu Project, one of the largest undeveloped gold/copper projects in the Americas, which is expected to commence production of more than 200,000 ounces of gold annually in 2024. GCM Mining pays a monthly dividend to its shareholders and has equity interests in Aris Gold Corporation (~44%; TSX: ARIS; Colombia – Marmato, Soto Norte; Canada – Juby), Denarius Metals Corp. (~29%; TSX-V: DSLV; Spain – Lomero-Poyatos and Colombia – Guia Antigua, Zancudo) and Western Atlas Resources Inc. (~26%; TSX-V: WA: Nunavut – Meadowbank).

 

Posted May 10, 2022

Share this news article

MORE or "UNCATEGORIZED"


Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project

Spanish Mountain Gold Ltd. (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF)... READ MORE

July 4, 2025

Aura Announces Preliminary Q2 2025 Production Results

Aura Minerals Inc. (TSX: ORA) (B3: AURA33) (OTCQX: ORAAF) is plea... READ MORE

July 4, 2025

Cascadia Announces Closing of Financing

Cascadia Minerals Ltd. (TSX-V:CAM) (OTCQB:CAMNF) is pleased to an... READ MORE

July 4, 2025

Abcourt Closes US$ 8M Loan Facility to Start Sleeping Giant Mine

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

July 4, 2025

Mishkeegogamang First Nation and First Mining Sign Long Term Relationship Agreement for the Development of the Springpole Gold Project

Agreement setting out the significant participation of Mishkeegog... READ MORE

July 4, 2025

Copyright 2025 The Prospector News