The Prospector News

Atico Reports 2021 Fourth Quarter and Full Year Production Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Atico Reports 2021 Fourth Quarter and Full Year Production Results

 

 

 

 

 

Atico Mining Corporation (TSX-V: ATY) (OTCQX: ATCMF) is pleased to announce operating results for the three and twelve month periods ended December 31, 2021 from its El Roble mine. Production totaled 4.93 million pounds of copper with 3,152 ounces of gold for the fourth quarter and 18.07 million pounds of copper with 11,016 ounces of gold in concentrates for the full year 2021.

 

“2021 was a challenging year where the operations team had to navigate through strict health and safety protocols caused by the global pandemic while also facing tough weather conditions in the first half of the year. Despite these challenges, we came very close to deliver on our production guidance. Copper production came just under budget mostly explained by a decline in head grade, while gold production was at the high end of our guidance. We are still anticipating that these results will lead to strong revenues for the fourth quarter and robust financials for year-end 2021,” said Fernando E. Ganoza, CEO. “In the upcoming year, we will continue moving towards getting the La Plata Feasibility Study across the finish line while also aggressively exploring both El Roble and La Plata properties as well as working towards achieving operational guidance for 2022.”

 

Fourth Quarter and Full Year Operational Highlights

 

Fourth Quarter

  • Production of 4.93 million pounds of copper contained in concentrates; a decrease of 5% over Q4 2020.
  • Production of 3,152 ounces of gold contained in concentrates; an increase of 11% over Q4 2020.
  • Average processed tonnes per day of 908; an increase of 4% over Q4 2020.
  • Copper and gold head grades of 3.23% and 2.16 grams per tonne; a decrease of 7% for copper and an increase of 6% for gold over Q4 2020.
  • Copper and gold recovery of 93.0% and 61.3%; an increase of 2% and 4% for copper and gold, respectively over Q4 2020.

 

2021 Year-end

  • Production of 18.07 million pounds of copper contained in concentrates; a decrease of 12% over 2020.
  • Production of 11,016 ounces of gold contained in concentrates; an increase of 2% over 2020.
  • Average processed tonnes per day of 918; an increase of 5% over 2020.
  • Copper and gold head grades of 3.06% and 1.98 grams per tonne; a decrease of 12% for copper and no significant change for gold over 2020.
  • Copper and gold recovery of 92.6% and 59.8%; no significant change for copper and an increase of 3% for gold over 2020.

 

Fourth Quarter and Full Year Operational Details

 

  Q1 Total Q2 Total Q3 Total Q4 Total 2021 Total
Production (Contained in Concentrates)          
Copper (000s pounds) 4,386 4,309 4,441 4,928 18,065
Gold (ounces) 2,189 2,698 2,978 3,152 11,016
Mine          
Tonnes of ore mined 64,101 71,437 76,276 74,864 286,678
Mill          
Tonnes processed 68,282 68,238 77,816 74,414 288,750
Tonnes processed per day 954 892 919 908 918
Copper grade (%) 3.16 3.10 2.80 3.23 3.06
Gold grade (g/t) 1.75 2.00 2.01 2.16 1.98
Recoveries          
Copper (%) 92.3 92.3 92.6 93.0 92.6
Gold (%) 57.3 61.7 59.2 61.3 59.8
Concentrates          
Copper and gold concentrates (dmt) 10,366 10,012 10,704 11,159 42,241
           
Payable copper produced (000s lbs) 4,166 4,093 4,219 4,682 17,162

Note: Metal production figures are subject to adjustments based on final settlement.

 

2022 Operating and Cost Guidance

 

   
Copper (000s pounds) 15,000 to 16,500
Gold (ounces) 12,500 to 14,000
C1 Cash Cost ($US)(1) $1.35 to $1.50

Note: Please see “Non-GAAP Financial Measures” at the end of this release. C1 cash cost per pound of payable copper produced net of by-product credits and selling costs.

 

El Roble Mine

 

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

 

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

 

El Roble has Proven and Probable reserves of 1.00 million tonnes grading 3.02% copper and 1.76 g/t gold, at a cut-off grade of 1.3% copper equivalent with an effective date of September 30, 2020. Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit. On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

 

Qualified Person

 

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

 

About Atico Mining Corporation

 

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities.

 

Posted February 2, 2022

Share this news article

MORE or "UNCATEGORIZED"


Black Mammoth Metals Reports Drill Results at Callaghan Gold Property, NV

Black Mammoth Metals Corporation (TSX-V: BMM) (OTC: LQRCF) is pl... READ MORE

May 14, 2025

Entrée Resources Announces Drill Results from Hugo North Extension, Including 260 Metres Grading 4.45% CuEq

Entrée Resources Ltd. (TSX:ETG) (OTCQB:ERLFF) is pleased to prov... READ MORE

May 14, 2025

OUTCROP SILVER EXPANDS LOS MANGOS VEIN SYSTEM WITH NEW HIGH-GRADE INTERCEPTS INCLUDING 3.86 METRES AT 621 g/t SILVER EQUIVALENT

Outcrop Silver & Gold Corporation (TSX-V: OCG) (OTCQX: OCGSF)... READ MORE

May 14, 2025

Harfang Makes New Gold Discovery and Drills 7.0 g/t Au Over 18.0 m at Sky Lake, Ontario

Harfang Exploration Inc. (TSX-V: HAR) is pleased to announce a ne... READ MORE

May 14, 2025

Orezone Gold Reports First Quarter 2025 Results

Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF)  is pleased t... READ MORE

May 14, 2025

Copyright 2025 The Prospector News