Calibre Mining Corp. (TSX: CXB) (OTCQX: CXBMF) announced operating results for the period October 15, 2019 to December 31, 2019.
Q4 2019 Highlights:
Russell Ball, CEO of Calibre stated: “Our fourth quarter of 2019 was transformative as we transitioned the Company to a multi-asset producer, while successfully delivering on our production guidance. As we begin 2020, we look to continue delivering quality, high-margin gold production, driven by increased, high-grade, open-pit ore being mined at Limon Central. In addition, our discovery drilling and resource expansion programs will ramp up significantly as we expect to have six drill rigs turning by the end of January, with four focused at La Libertad. In my opinion, the extension of mine life at La Libertad represents the most compelling near-term, value creation opportunity for Calibre.”
October 15, 2019 to December 31, 2019 Operating Summary
Description | El Limon | La Libertad | Consolidated | |
Ore Milled (tonnes) | 100,221 | 353,254 | 453,475 | |
Ore Milled Grade (g/t Au) | 5.74 | 1.74 | 2.62 | |
Recovery (%) | 91.3 | 96.4 | 94.0 | |
Gold Production (ounces) | 15,440 | 18,066 | 33,506 |
Operating Overview
El Limon
El Limon delivered on guidance by producing 15,440 ounces of gold. Production resulted from processing 100,221 tonnes at an average grade of 5.74 g/t with average recoveries of 91.3%. Ore was mined from the new high-grade Limon Central open-pit and the Santa Pancha underground mine, where positive grade reconciliations continue.
La Libertad
La Libertad delivered on guidance by producing 18,066 ounces of gold. Production resulted from processing 353,254 tonnes at an average grade of 1.74 g/t with average recoveries of 96.4%. The mine plan was resequenced due to the temporary suspension of blasting activities at the Jabali underground mine, although no change is expected to the previously announced 2020 production guidance of between 70,000 and 75,000 ounces.
The government continues to make progress with the relocation of households in the nearby community of Santo Domingo affected by the artisanal mining driven ground instability issue. The Company is working closely with the government and community to ensure a safe and responsible resolution. Mining at the Jabali open-pit remains unaffected.
Cash Position
At December 31, 2019, the preliminary cash balance was US$32.9 million.
Qualified Person
Darren Hall, MAusIMM, MSME, SVP & Chief Operating Officer, Calibre Mining Corp. is a “qualified person” as set out under NI 43-101 has reviewed and approved the scientific and technical information in this press release.
About Calibre Mining Corp.
Calibre Mining is a Canadian-listed gold mining and exploration company with two 100%-owned operating gold mines in Nicaragua. The Company is focused on sustainable operating performance and a disciplined approach to growth.
Grid Metals Intersects High-Grade Lithium Values Including 4.7% L... READ MORE
GR Silver Mining Ltd. (TSX-V: GRSL) (OTCQB: GRSLF) (FRANKFURT: G... READ MORE
Arizona Sonoran Copper Company Inc. (TSX:ASCU) (OTCQX:ASCUF) rep... READ MORE
IsoEnergy Ltd. (TSX-V: ISO) (OTCQX: ISENF) and the Ya’thi... READ MORE
Highlights: The Company has received results from drillholes 1274... READ MORE