The Prospector News

Osisko Metals Intersects 14.87% Zinc+Lead Over 12.74 Metres at Pine Point and Grants Stock Options

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Osisko Metals Intersects 14.87% Zinc+Lead Over 12.74 Metres at Pine Point and Grants Stock Options

 

 

 

 

 

Osisko Metals Incorporated (TSX-V: OM) (FRANKFURT: OB51) is pleased to announce assay results from the latest 7 drill holes completed in the East Mill Zone within the Pine Point Mining Camp (“PPMC”). Drill hole EM-18-PP-151 intersected 8.07% Zinc and 6.80% Lead over 12.74 metres within the modeled K-32 pit boundaries. Drill hole EM-18-PP-392 intersected 10.90% Zinc and 4.28% Lead over 6.00 metres at the west edge of the modeled K-32 pit boundary, and hole EM-18-PP-182 intersected 11.78% Zinc and 6.01% Lead over 4.35 metres in an area 130 metres to the south of the currently modeled pit boundary, near historical Cominco drilling. (See 2018-2019 Drill Campaign: East Mill Zone – K-32 pit). The pit number refers to modeled resources pits included in the recently filed NI43-101 Technical Report filed on SEDAR.

 

All intersections are within flat lying tabular-style deposits and all intercepts are located above 30 metre depths. Highlights are listed below in Table 1 and details are provided in Tables 2 & 3.

 

Table 1: Selected Drill Highlights

 

 

Hole Name Area Deposit From To Width Zinc Lead Lead + Zinc
(metres) (metres) (metres) % % %
EM-18-PP-151 EMZ K-32-01 16.31 29.05 12.74 8.07 6.80 14.87
EM-18-PP-182 EMZ K-32-01 20.90 25.25 4.35 11.78 6.01 17.79
EM-18-PP-392 EMZ K-32-01 15.00 21.00 6.00 10.90 4.28 15.18
EM-18-PP-393 EMZ K-32-01 18.00 26.50 8.50 4.85 0.78 5.63

 

The Company would also like to issue a correction to the 2019 Corporate Outlook press release issued January 15th. The words “pit-constrained” were omitted from the President’s quote, and should have read: “Osisko Metals is now the only junior in the Americas with a pit-constrained Inferred Resource of 5.5 billion pounds of zinc and lead that has excellent expansion potential.”

 

Jeff Hussey, President & CEO of Osisko Metals, commented: “It is also worth pointing out that the high grade, large tonnage, near surface mineralization at Pine Point is unique among its peer group, as nearly 90% of zinc mine production1 globally is sourced from underground mines, underscoring the rarity of open pit zinc assets like Pine Point. Furthermore, with low cost hydro-electric power available on site and a rail head located within 60km, Osisko Metals is well positioned to rapidly advance Pine Point. While we announced our maiden resource for the Pine Point project in December 2018, we are still receiving assay results from the 2018 definition drilling campaign, totalling over 40,000 meters of additional drilling completed following the cut-off date for the recently filed 2018 Mineral Resource Estimate (“MRE”). These results will be incorporated into the next MRE planned for 2019. The drilling reported today continues to expand and confirm Pine Point’s high grade, near surface mineralization.”

 

The newly modeled K-32 pit, located within the East Mill Zone currently measures 300 metres in strike length with an average mineralized north-south width of approximately 130 metres. It is located 4.5 kilometres east of the electrical sub-station along a main haul road. Reported NI43-101 Inferred Mineral Resources for the East Mill Zone total 5.5 million tonnes of 3.76% Zinc and 1.30% Lead.

 

The objective of the 2018 drill program was to convert the Cominco Ltd. unclassified near-surface historical resources into the NI43-101 Inferred Mineral Resource (see press release dated December 6 2018). These areas are considered to be amenable to open pit mining.

 

PPMC is located on the south shore of Great Slave Lake in the Northwest Territories, near infrastructure and paved highway access and with 100km of haulage roads already in place.

 

  1. Wood Mackenzie Database

 

Table 2: Composite Assay Results

 

 

Hole Name Deposit From To Drilled Width True Width Zinc Lead Lead + Zinc
(metres) (metres) (metres) (metres) % % %
EM-18-PP-151 K-32-01 16.31 29.05 12.74 11.03 8.07 6.80 14.87
EM-18-PP-182 K-32-01 20.90 25.25 4.35 4.35 11.78 6.01 17.79
EM-18-PP-228 K-32-01 14.00 15.00 1.00 1.00 1.17 0.51 1.67
EM-18-PP-392 K-32-01 15.00 21.00 6.00 6.00 10.90 4.28 15.18
EM-18-PP-393 K-32-01 18.00 26.50 8.50 8.50 4.85 0.78 5.63
EM-18-PP-394 K-32-01 13.10 14.10 1.00 1.00 0.02 1.14 1.15
EM-18-PP-395 K-32-01 27.00 29.00 2.00 2.00 2.78 0.27 3.05

 

Table 3: Drill hole collar locations (UTM NAD83 zone 11)

 

 

Hole Name Area Deposit Easting Northing Elevation Azimuth Dip Depth (metres)
EM-18-PP-151 EMZ K-32-01 643500.8 6752302.1 215.28 120 -60 45.00
EM-18-PP-182 EMZ K-32-01 643500.2 6752127.4 214.80 0 -90 42.00
EM-18-PP-228 EMZ K-32-01 643898.6 6752460.7 215.77 0 -90 36.00
EM-18-PP-392 EMZ K-32-01 643489.7 6752298.1 215.00 0 -90 42.00
EM-18-PP-393 EMZ K-32-01 643487.0 6752350.2 215.00 0 -90 42.00
EM-18-PP-394 EMZ K-32-01 643589.4 6752341.9 215.00 0 -90 42.00
EM-18-PP-395 EMZ K-32-01 643545.3 6752063.9 215.00 0 -90 42.00

 

Granting of Stock Options

 

The Osisko Metals Board of Directors approved the grant of incentive stock options to directors, officers and key employees to purchase up to an aggregate of 2,662,000 common shares in the capital stock of the Company. Grants are subject to a three-year vesting period and a five-year term at an exercise price of $0.55 per share.

 

Note regarding mineral resources and Qualified Persons

 

The above-mentioned Inferred Mineral Resources conform to National Instrument 43-101 standards. These mineral resources were reported by the Company on December 6, 2018 and the independent qualified person for the resource estimate, as defined by NI43 101 guidelines, is Pierre-Luc Richard, P. Geo, of BBA Inc.

 

Stanley G. Clemmer, P. Geo registered in the Northwest Territories and is Chief Geologist for Pine Point Mining Limited, a wholly owned subsidiary of Osisko Metals Limited. He is the Qualified Person responsible for the technical data reported in this news release.

 

Quality Assurance / Quality Control

 

Osisko Metals adheres to a strict Quality Assurance and Quality Control program with regard to core handling, sampling, transportation of samples and lab analyses. Drill core samples from the Pine Point project area were securely transported to its core facility in Hay River, Northwest Territories where they were logged and sampled. Samples selected for assay were shipped via secure transportation to the ALS Canada Ltd.’s preparation facility in Yellowknife. Pulps were analyzed at the ALS Canada Ltd. facility in North Vancouver, British Columbia. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for ultra-trace level detection for a multi-element suite with a 1% upper detection limit for base metals. Samples reporting over 1% for Zn and 1% for Pb are analyzed by assay grade four acid digestion and ICP-AES analysis with an upper detection limit of 30% and 20% respectively. Samples reporting Zn >30% and or Pb >20% are analyzed by traditional titration.

 

About Osisko Metals

 

Osisko Metals is a Canadian exploration and development company creating value in the base metal space with a focus on zinc mineral assets. The Company controls Canada’s two premier zinc mining camps. The Company’s flagship, the Pine Point Mining Camp located in the Northwest Territories, has an Inferred Mineral Resource of 38.4 Mt grading 4.58% zinc and 1.85% lead, making it the largest high grade, pit constrained zinc deposit in Canada (please refer to the Amended Technical Report for further information). Within the Bathurst Mining Camp located in northern New Brunswick, the Company is focused on drilling and developing the Key Anacon Project, which previously had only sporadic exploration work since the 1960’s. In 2019, the Company will continue to diligently develop and explore in order to confirm and grow both projects. In Québec, the Company owns 42,000 hectares that cover 12 grass-root zinc targets that will be selectively advanced through exploration.

 

Posted January 30, 2019

Share this news article

MORE or "UNCATEGORIZED"


VIZSLA SILVER AGREES TO ACQUIRE NEWLY CONSOLIDATED PAST-PRODUCING SILVER DISTRICT IN THE EMERGING SILVER-GOLD-RICH PANUCO - SAN DIMAS CORRIDOR IN MEXICO

Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) i... READ MORE

March 28, 2024

Additional Drill Results Highlighted by Hole D-380 in Block 6 at Oko West, Intersecting 39.7 m Grading 5.27 g/t Au Including 2.8 m @ 14.18 g/t Au and 13.0 m Grading 10.50 g/t Au

Reunion Gold Corporation (TSX-V: RGD) (OTCQX: RGDFF) is pleased t... READ MORE

March 28, 2024

STLLR Gold’s Tower Gold Project Infill Drilling Continues to Confirm Mineralization at the Jonpol Deposit

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) announces ... READ MORE

March 28, 2024

Hudbay Provides Annual Reserve and Resource Update and Production Outlook

Consolidated copper production is expected to average 153,000i to... READ MORE

March 28, 2024

Aya Gold & Silver: Record 2023 Production, Revenue and Operating Cash Flow

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

March 28, 2024

Copyright 2024 The Prospector News