Uncategorized
Share this news article...
Share on LinkedIn
Linkedin
Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on Google+
Google+
Email this to someone
email

Alacer Gold Announces Additional Positive Drill Results for the Ardich Gold Prospect, Including 57.7 Meters at 3.84 Grams Per Tonne

 

 

 

 

 

Alacer Gold Corp. [TSX: ASR) (ASX: AQG] is pleased to announce additional positive drill results for the Ardich gold prospect. In addition to the previously announced 43 diamond core drill holes1, a further 20 diamond core drill holes are being reported, with a majority intersecting predominantly oxide gold mineralization including holes:

 

  • AR54 with 61.4m averaging 2.22 g/t gold from 5m depth2
  • AR52 with 57.7m averaging 3.84 g/t gold from 121.3m depth2

 

Previously announced holes include1:

 

  • Hole AR09 with 67.7m averaging 4.08 g/t gold from 53.3m depth (including 14.2m at 7.21 g/t)
  • Hole AR31 with 68.6m averaging 2.21 g/t gold from 36.0m depth (including 17.0m at 5.5 g/t)
  • Hole AR41 with 50.2m averaging 3.01 g/t gold from 43.4m depth (including 7.9m at 8.81 g/t)

 

Based on the 63 diamond core drill holes totaling 9,984.9m, gold mineralization is open in all directions and the new holes defined additional extension of the mineralization to the north and east of the known mineralized zone. Drilling to date has been primarily on 80% Alacer owned licenses (all holes except the end of two holes, AR27 and AR33).
             

Alacer is in the process of preparing an interim resource estimate which will be released in late 2018. This interim resource will be based on the data from the first 55 diamond core drill holes only due to the timing of the resource report preparation, and thus will only represent a portion of the expected final Ardich resource. The objective of the ongoing exploration program is to first define, by step-out drilling, the extent of the mineralization. Once the mineralized system dimensions and geology is better understood, a more comprehensive infill drilling program will be started with the aim of defining an expanded resource and a reserve estimate. While drilling continues at Ardich (currently drilling hole AR91), additional Forestry permits are required to begin further step-out drilling into the most prospective areas to the southeast. Concurrently, work has started on the permitting process as well as metallurgical testing, with the initial results indicating the oxide ores are suitable for processing via heap leaching. 

 

A recent scoping study to determine the optimal pathway for the expansion of the heap leach oxide processing capacity in the Çöpler District identified various options (at both Ardich and Çöpler) for standalone facilities and heap leach pads of varying size (some >50Mt), along with a low cost incremental expansion option at Çöpler (~20Mt of additional heap leach capacity at a cost of ~$15M). These options provide pathways to both accelerated low-cost, near-term development of Ardich or other Çöpler District prospects, as well as options for a new separate mine development should the Ardich deposit grow to the full extent of the mineralized target. A feasibility study will be completed in 2019 for the ~20Mt incremental expansion of the Çöpler heap leach pad.

 

Figure 1 is available at: 

http://www.globenewswire.com/NewsRoom/AttachmentNg/44a53bab-b98d-4e8e-9421-4a7786ac14bf

 

Figure 1. Location map of the Ardich gold prospect. The haul road constructed for the Çakmaktepe oxide ore is 2km to the Ardich prospect site.

 

Prospect Overview

 

The Ardich gold prospect is characterized by development of gold mineralized listwanite and dolomite formations in a 800m x 600m target area within a northwest-southeast structural zone (Figure 2). The gold mineralization is closely associated with low angle thrust zones between listwanites, dolomites and ophiolites that are intruded by a series of microdioritic dykes. The mineralization is related with crystalline and chalcedonic quartz veins within the brecciated and silicified listwanite and dolomite bodies. The mineralization is predominantly in the form of oxide with sulfide mineralization and is confined to limited pyrite rich jasperoid sections. Based on the latest drill data, the main mineralization zone appears to be tabular and almost flat lying.

 

Drilling

 

Alacer drilled 63 diamond core drill holes totaling 9,984.9m between August 2017 and mid-September 2018. The company announced drill results of the first five holes on December 18, 2017, including AR04 with 84.9m averaging 1.79 g/t gold and including 24.7m averaging 4.53 g/t gold. Results of an additional 13 diamond core drill holes were released on February 26, 2018, and all holes have intersected predominantly oxide mineralization with some impressive grades, including hole AR09 with 67.7m averaging 4.08 g/t gold. In addition to these previously reported 18 holes, Alacer announced results of 25 holes (AR19-AR43) on July 25, 2018. Key results include hole AR41 with 50.2m averaging 3.01 g/t gold from 43.4m depth (including subinterval of 7.9m @ 8.81 g/t gold) and hole AR31 with 68.6m averaging 2.21 g/t Au from 36m depth (including 17m @ 5.5 g/t Au).

 

Alacer is continuing the drilling program in Ardich with two diamond drill rigs and has completed 20 diamond core drill holes totaling 2,641.8m between July and mid-September 2018 (AR44-AR63). These additional holes improved the northwest and eastern extension of the gold mineralization defined by the earlier 43 diamond core drill holes. Drill holes AR47, AR48, AR51, AR52 and AR53 are located to the east of the known mineralized zone and have intersected significant gold mineralization underneath barren ophiolites. This demonstrates possible continuation of gold mineralization to the east of the prospect covered by ophiolites that do not have any surface geochemical reflection. The gold mineralization remains open in all directions. Additional Forestry permits are required to undertake further step-out drilling into the most prospective areas to the southeast. These are expected soon.

 

All drilling outlined below was diamond core drilling using either HQ (63.5mm in diameter) or PQ (85mm in diameter) core sizes.

 

Figure 2 is available at: 

http://www.globenewswire.com/NewsRoom/AttachmentNg/ef72ac55-aad1-4e9e-ab71-4cadb6541056

 

Figure 2. Drill hole locations and surface reflection of mineralized zones. Mineralization is open in all directions.

 

Drill Highlights

 

Significant results are down hole length and include:

 

  • AR52: 57.7m @ 3.84 g/t Au from 121.3m, including: 10.2m @ 5.75 g/t Au from 121.3m and 11.9m @ 6.4 g/t Au from 135.6m and 5m @ 5.15 g/t Au from 153.5m and 5.1m @ 6.42 g/t Au from 166.1m
  • AR53: 48.5m @ 2.69 g/t Au from 49.6m, including: 6m @ 5.04 g/t Au from 59.6m and 6m @ 7.06 g/t Au from 78.6m
  • AR54: 61.4m @ 2.22 g/t Au from 5m, including: 6.8m @ 7.14 g/t Au from 36.8m and 6.4m @ 7.75 g/t Au from 49m
  • AR55: 42.5m @ 2.55 g/t Au from 31.1m, including: 3.5m @ 6.8 g/t Au from 44.3m and 3.5m @ 5.67 g/t Au from 55.8m and 4m @ 7.64 g/t Au from 63.3m
  • AR58: 61.4m @ 2.04 g/t Au from 23.9m, including: 2m @ 6.17 g/t Au from 50.7m and 6m @ 7.09 g/t Au from 70.3m
  • AR61: 100.6m @ 1.35 g/t Au from 8m, including: 10m @ 3.01 g/t Au from 82.1m and 3.2m @ 5.01 g/t Au from 100.1m
  • AR62: 64.2m @ 2 g/t Au from 19.8m, including: 12m @ 5.21 g/t Au from 45.3m

 

 

Table 1. Significant gold intercepts at the Ardich Prospect.

 

Hole ID From
(m)
To (m) Interval
(m)
Au
g/t
Remarks Depth
(m)
Comments
AR46 107.00 117.00 10.00 0.57 Oxide 253.40  
131.50 132.50 1.00 5.78 Oxide  
AR47 70.90 82.00 11.10 1.74 Sulfide 134.40 72.90-74.00 Sulfide
  87.20 98.90 11.70 1.62 Oxide
AR48 36.10 42.10 6.00 1.83 Oxide 92.20  
46.10 49.10 3.00 1.25 Oxide  
AR49 19.40 26.40 7.00 1.47 Oxide 131.40  
AR50 27.30 39.00 11.70 4.49 Oxide 95.00 37.00-39.00 Sulfide
Including 37.00 38.00 1.00 26.20 Sulfide  
AR51 45.30 48.30 3.00 1.04 Oxide 119.60  
  57.70 65.00 7.30 0.82 Oxide  
  69.00 82.00 13.00 2.37 Oxide 72.00-74.00 Sulfide
Including 71.00 73.00 2.00 8.50 Mixed 72.00-73.00 Sulfide
  86.00 99.40 13.40 0.95 Oxide  
AR52 59.00 70.00 11.00 0.75 Oxide 216.90  
  74.00 79.00 5.00 0.35 Oxide  
  97.40 102.70 5.30 0.62 Oxide  
  121.30 179.00 57.70 3.84 Mixed 55/45 Sulfide-Oxide Zones
Including 121.30 131.50 10.20 5.75 Oxide 122.80-124.80 Sulfide
Including 135.60 147.50 11.90 6.40 Mixed 70/30 Oxide-Sulfide Zones
Including 153.50 158.50 5.00 5.15 Sulfide  
Including 166.10 171.20 5.10 6.42 Mixed 60/40 Sulfide-Oxide Zones
  188.00 204.00 16.00 0.51 Oxide 188.00-188.80 and 190.80-192.80 Sulfide
AR53 49.60 98.10 48.50 2.69 Oxide 142.90 62.60-63.60 and 67.60-69.60 Sulfide
Including 59.60 65.60 6.00 5.04 Oxide 62.00-63.00 Sulfide
Including 78.60 84.60 6.00 7.06 Oxide  
  106.60 142.00 35.40 0.89 Oxide 70/30 Oxide-Sulfide Zones
AR54 5.00 66.40 61.40 2.22 Oxide 110.30 37.80-38.80 Sulfide
Including 36.80 43.60 6.80 7.14 Oxide 37.8-38.8 Sulfide
Including 49.00 55.40 6.40 7.75 Oxide  
AR55 3.00 27.10 24.10 1.55 Oxide 126.80  
Including 16.00 18.00 2.00 5.49 Oxide  
  31.10 73.60 42.50 2.55 Mixed 32.70-34.50 and 54.60-61.30 Sulfide
Including 44.30 47.80 3.50 6.80 Oxide  
Including 55.80 59.30 3.50 5.67 Mixed   50/50 Oxide-Sulfide Zones
Including 63.30 67.30 4.00 7.64 Oxide    
AR56 22.30 48.70 26.40 2.41 Oxide 103.60 32.30-33.30 Sulfide
Including 34.30 37.30 3.00 6.23 Oxide  
  63.10 79.00 15.90 1.41 Oxide 64.10-65.80 Sulfide
AR58 23.90 85.30 61.40 2.04 Mixed 99.80 80/20 Oxide-Sulfide Zones
Including 50.70 52.70 2.00 6.17 Sulfide  
Including 70.30 76.30 6.00 7.09 Oxide  
AR59 30.50 52.00 21.50 1.55 Oxide 131.70  
  58.50 94.70 36.20 1.67 Oxide 82.00-83.00 and 85.00-88.00 Sulfide
Including 59.50 64.50 5.00 5.34 Oxide  
Including 76.70 79.00 2.30 5.30 Oxide  
AR61 8.00 108.60 100.60 1.35 Oxide 120.20 Includes isolated intervals of core loss totaling 0.8m.
89.10-90.10 and 102.10-103.30 Sulfide
Including 82.10 92.10 10.00 3.01 Oxide  
Including 100.10 103.30 3.20 5.01 Oxide 70/30 Oxide
AR62 19.80 84.00 64.20 2.00 Mixed 121.40 85/15 Oxide-Sulfide Zones
Including 45.30 57.30 12.00 5.21 Oxide  
AR63 44.00 78.30 34.30 1.11 Oxide 124.70  
  85.30 94.60 9.30 0.79 Oxide  

 

Significant gold intervals reported at a nominal 0.3 g/t gold cut-off and with a maximum 3.5m contiguous dilution are given in Table 1. All thicknesses are down hole length and true widths are not known at this stage.

 

To view the complete drill assay results and further technical information relating to this news release, please visit the following link http://www.alacergold.com/investors/news-releases on the Company’s website.

 

About Alacer

 

Alacer is a leading low-cost gold producer, with an 80% interest in the world-class Çöpler Gold Mine in Turkey operated by Anagold Madencilik Sanayi ve Ticaret A.S. (“Anagold”), and the remaining 20% owned by Lidya Madencilik Sanayi ve Ticaret A.S. (“Lidya Mining”). The Corporation’s primary focus is to leverage its cornerstone Çöpler Gold Mine and strong balance sheet to maximize portfolio value and free cash flow, minimize project risk, and therefore, create maximum value for shareholders. The Çöpler Gold Mine is located in east-central Turkey in the Erzincan Province, approximately 1,100 kilometers southeast from Istanbul and 550 kilometers east from Ankara, Turkey’s capital city.

 

The Corporation continues to pursue opportunities to further expand its current operating base to become a sustainable multi-mine producer with a focus on Turkey:

 

Çöpler Sulfide Expansion Project (the “Sulfide Project”)

 

The sulfide plant is processing sulfide ore and construction of the Sulfide Project will be delivered ~11% under budget. The Sulfide Project is expected to deliver long-term growth with robust financial returns and adds 20 years of production at Çöpler. The Sulfide Project will bring Çöpler’s remaining life-of-mine gold production to approximately 4 million ounces at All-in Sustaining Costs averaging $645 per ounce3, 4.

 

Çöpler Oxide Plant Production

 

Alacer is currently processing oxide ore from three primary sources: Çöpler in-pit, Çakmaktepe and blended material comprising limestone rich in-pit oxide material and stockpiled lower sulfide, high carbonate ore. To maximize the processing capacity of the oxide plant, the expansion of the existing heap leach pad is being accelerated and is expected to be complete in 2018. In addition, the Corporation continues to evaluate opportunities to further extend oxide production beyond the current reserves with ongoing in-pit exploration, Çöpler District exploration, and evaluation of options to further increase heap leach capacity.

 

District & In-Country Exploration Activities

 

The systematic and focused exploration efforts in the Çöpler District, as well as in other regions of Turkey, are progressing. The Çöpler District remains the focus, with the goal of continuing to grow oxide resources that will deliver production utilizing the existing Çöpler infrastructure. In the other regions of Turkey, targeted exploration work continues, including work on the Definitive Feasibility Study for the Gediktepe Project5.

 

Alacer is a Canadian corporation incorporated in the Yukon Territory with its primary listing on the Toronto Stock Exchange. The Corporation also has a secondary listing on the Australian Securities Exchange where CHESS Depositary Interests (“CDIs”) trade.

 

Technical Procedural Information

 

Sampling, Assaying and QA/QC

 

The Ardich drilling program started in 2017. Diamond drill core is sampled as half core at 1m intervals. The samples were submitted to ALS Global laboratories in Izmir, Turkey for sample preparation and analysis which is of a ISO/IEC 7025:2005 certified and accredited laboratory. Bureau Veritas (Acme) laboratory, Ankara is being used as for umpire check sample analysis. Gold was analyzed by fire assay with an AAS finish, and the multi-element analyses were determined by four acid digestion and ICP-AES and MS finish. For gold assays greater than or equal to 10g/t, fire assay process is repeated with a gravimetric finish for coarse gold. Alacer’s drill and geochemical samples were collected in accordance with accepted industry standards. Alacer conducts routine QA/QC analysis on all assay results, including the systematic utilization of certified reference materials, blanks, field duplicates, and umpire laboratory check assays. External review of data and processes relating to the prospect have been completed by independent Consultant Dr. Erdem Yetkin, P.Geo. in October 2018. There were no adverse material results detected and the QA/QC indicates the information collected is acceptable, and the database can be used for further studies.

 

Metallurgical Test Work

 

A three-phase metallurgical testing program is being conducted by McClelland Laboratories, Inc. (Sparks, NV, USA), under the guidance of Metallurgium. The first and second phases comprising bottle roll cyanide leaching tests and column leach tests have been finalized with good acceptable recovery results. The Phase III metallurgical test work continues with column composite bottle roll tests.

 

Qualified Person

 

Dr. Mesut Soylu, P.Geo., who is a Qualified Person as defined under National Instrument 43-101 and qualifies as a Competent Person as defined in the JORC Code 2012, has reviewed and approved the scientific and technical information contained in this news release.

 

Posted November 8, 2018

Share this news article...
Share on LinkedIn
Linkedin
Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on Google+
Google+
Email this to someone
email

MORE or "UNCATEGORIZED"


51% IRR from PEA at TriStar Gold’s Castelo de Sonhos Project

On behalf of TriStar Gold Inc. (TSX-V: TSG), GE21 Consultoria Min... READ MORE

November 16, 2018

Colorado Defines Gold-Copper Mineralization Over 500 m Strike Length at Tami

Colorado Resources Ltd. (TSX-V: CXO) is pleased to announce compl... READ MORE

November 16, 2018

Macarthur Minerals Closes Oversubscribed Private Placement

Macarthur Minerals Limited (TSX-V: MMS) is pleased to announce it... READ MORE

November 16, 2018

Blue Sky Uranium Reports over 1% U3O8 and 0.1% V205 in Pit Sampling Adjacent to Ivana Uranium-Vanadium Deposit

Blue Sky Uranium Corp. (TSX-V: BSK) (FSE: MAL2) (OTC: BKUCF) is p... READ MORE

November 15, 2018

White Gold Corp. Drills 103.9 g/t Gold & 400.0 g/t Silver over 1.52m from Surface within a Broader Intercept of 31.4 g/t Gold over 6.1m and Identifies New High-Grade Gold Zones at Vertigo Target on JP Ross Property

White Gold Corp. (TSX-V: WGO) (OTC – Nasdaq Intl: WHGOF) (FRA: ... READ MORE

November 15, 2018

Copyright 2018 The Prospector News - Site design by Spyderbaby Productions