The Prospector News

Canterra Intersects 18.75 m of 5.35% CuEq, including 5.15 m of 8.83% CuEq, at the Lemarchant Deposit – Demonstrating High-Grade Potential Beyond Lundberg in Newfoundland’s Buchans District

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Canterra Intersects 18.75 m of 5.35% CuEq, including 5.15 m of 8.83% CuEq, at the Lemarchant Deposit – Demonstrating High-Grade Potential Beyond Lundberg in Newfoundland’s Buchans District

 

 

 

 

 

“With a significantly expanded resource at Lundberg and now high-grade results from Lemarchant, we are beginning to demonstrate the broader opportunity across our consolidated Buchans District.” – Chris Pennimpede, President and CEO

 

Highlights – 2026 Lemarchant Drill Program

  • 18.75 m of 5.35% copper equivalent at Lemarchant, the largest satellite deposit in Canterra’s Buchans District. Hole LM-26-172 intersected 18.75 m of high-grade polymetallic mineralization from 238.00 m, averaging 0.61% Cu, 6.00% Zn, 1.45% Pb, 77.2 g/t Ag and 1.72 g/t Au, at a vertical depth of approximately 180 m.
  • Gold- and silver-rich core. 5.15 m of 8.83% CuEq from 240.85 m, grading 1.03% Cu, 7.89% Zn, 2.65% Pb, 165.4 g/t Ag and 2.98 g/t Au.
  • Additional drilling demonstrates potential along the prospective Lemarchant Horizon. Hole LM-26-176 intersected 13.10 m of 1.21% CuEq from 190.90 m, including 2.10 m of 3.86% CuEq (0.61% Cu, 3.61% Zn, 0.44% Pb, 26.2 g/t Ag and 1.72 g/t Au), approximately 40 m from the nearest historical intercept. The interval comprises semi-massive sulphide underlain by strongly altered felsic breccia with stockwork sulphides.
  • Results support Canterra’s district strategy beyond its expanded Lundberg resource. Drilling confirms the continuity of polymetallic massive sulphide mineralization at Lemarchant and highlights the prospective host horizon that remains open along strike and at depth beyond the limits of historical deposit-focused drilling.
  • Additional results pending. Results reported today cover seven holes (2,064 m) of the 14-hole (5,240 m) 2026 Lemarchant program. Assays are pending for the remaining seven holes (LM-26-177 to LM-26-183), including step-outs at the Northwest Zone and tests of deeper geophysical and newly identified exploration targets.

 

Canterra Minerals Corporation (TSX-V: CTM) (OTCQB: CTMCF) (FSE: DXZB) is pleased to announce assay results from seven diamond drill holes at the Lemarchant Deposit, including 18.75 m of 5.35% CuEq in hole LM-26-172. Lemarchant is the largest known satellite deposit within Canterra’s Buchans District portfolio in central Newfoundland (Figure 1) and hosts a 2018 historical mineral resource estimate of 2.42 million tonnes Indicated at 4.89% CuEq and 0.56 million tonnes Inferred at 3.66% CuEq (Table 2).

 

Following the recently announced 55% increase in Indicated Mineral Resource tonnage at its cornerstone Lundberg Deposit to 26.1 Mt (October 6, 2026 news release), Canterra is advancing the next stage of its district strategy: demonstrating the potential for additional high-grade mineralization across its surrounding satellite deposits to contribute to the scale and value of the broader Buchans District. Lemarchant is located approximately 20 km southwest of Teck Resources’ former Duck Pond VMS Mine.

 

Chris Pennimpede, President and CEO of Canterra, commented:

 

“Our investment thesis at Buchans has always been about more than one deposit. We have now grown the Indicated resource at Lundberg by 55%, and these first results from Lemarchant demonstrate the high grades that make our surrounding satellite deposits so compelling.

 

“Nearly 19 metres exceeding 5% copper equivalent, including more than 5 metres approaching 9% copper equivalent, reinforces why we believe Lemarchant could become an important contributor to the broader Buchans District opportunity. With additional assays pending from step-outs and new exploration targets, we have more opportunities ahead.

 

“Our focus is on building scale around an established resource base while demonstrating the high-grade potential of the surrounding deposits. That’s how we intend to unlock the broader value of the district for shareholders.”

 

 Figure 1. Canterra’s Buchans District properties, showing the Lemarchant Deposit relative to the Company’s other critical mineral deposits (Lundberg, Bobbys Pond, Daniels Pond, Long Lake, Tulks Hill & Boomerang-Domino) and the past-producing Buchans and Duck Pond mines. The figure also shows Canterra’s Wilding gold project relative to Equinox Gold’s Valentine Gold Mine along the Valentine Lake Shear Zone.

 

Lemarchant Drill Results (Figure 2)

  • LM-26-172, an infill hole through the Lemarchant Main Zone, intersected 18.75 m of 5.35% CuEq (0.61% Cu, 6.00% Zn, 1.45% Pb, 77.2 g/t Ag, 1.72 g/t Au) from 238.00 m, at a vertical depth of approximately 180 m (Figure 3). The interval includes 5.15 m grading 8.83% CuEq from 240.85 m, carrying 165.4 g/t Ag and 2.98 g/t Au. A separate deeper interval was intersected from 275.00 to 284.00 m grading 0.66% CuEq over 9.00 m.
  • LM-26-176 intersected the Lemarchant Main Zone at 190.90 m, at a vertical depth of approximately 142 m, returning 13.10 m of 1.21% CuEq, including 2.10 m grading 3.86% CuEq (Figure 4). The upper 1.10 m is semi-massive sulphide with approximately 30% pyrite and 5 to 10% sphalerite and chalcopyrite with trace galena, grading 4.55% CuEq with 2.82 g/t Au and 23.4 g/t Ag. It is underlain by rhyolite breccia with strong silica-sericite alteration and stockwork pyrite with base metal sulphides, characteristic of the footwall alteration zone beneath the Lemarchant Deposit.
  • LM-26-171 was drilled up-dip and west of the Main Zone to a depth of 196.0 m and intersected two zones of zinc-copper mineralization, including 3.00 m of 1.03% CuEq from 61.00 m. Holes LM-26-173 and LM-26-175 returned only low-grade intervals, the best being 1.00 m of 1.03% CuEq from 144.60 m in LM-26-175, where the Lemarchant Horizon contains only minor sulphides. Hole LM-26-174 and the extension of historical hole LM-11-049 (LM-11-049EXT), which was deepened to test a deep IP anomaly down plunge of the Lemarchant Northwest Zone, returned no significant assays. Results are shown in Table 1 and Figures 2, 3 and 4; collar details are provided in Table 3.
  • Key outcomes: The results confirm the continuity of polymetallic massive sulphide mineralization while further highlighting the prospective host horizon that remains open along strike and at depth beyond the limits of past deposit-focused drilling.

 

Table 1. Lemarchant Deposit drill results, holes LM-26-171 to LM-26-176 and LM-11-049EXT

 

27

0

33

0

Hole ID From To Length Cu Zn Pb Ag Au CuEq
  (m) (m) (m) (%) (%) (%) (g/t) (g/t) (%)
LM-26-171 56.95 57.40 0.45 0.17 1.50 0.40 7.4 0.44 1.25
and 61.00 64.00 3.00 0.29 2.16 0.04 1.4 0.04 1.03
LM-26-172 238.00 256.75 18.75 0.61 6.00 1.45 77.2 1.72 5.35
including 240.85 246.00 5.15 1.03 7.89 2.65 165.4 2.98 8.83
and 275.00 284.00 9.00 0.11 0.09 0.00 5.1 0.46 0.66
LM-26-173 153.00 159.00 6.00 0.05 0.07 0.10 5.1 0.17 0.32
including 158.00 159.00 1.00 0.                                                         .03 0.01 11.3 0.13 0.53
LM-26-174 No significant assays
LM-26-175 144.60 166.60 22.00 0.07 0.23 0.05 1.2 0.05 0.21
including 144.60 145.60 1.00 0.40 0.16 0.06 8.4 0.47 1.03
including 165.60 166.60 1.00 0.21 0.95 0.02 2.7 0.06 0.60
LM-26-176 190.90 204.00 13.10 0.18 1.62 0.18 9.9 0.37 1.21
including 190.90 193.00 2.10 0.61 3.61 0.44 26.2 1.72 3.86
and 205.00 206.00 1.00 0.15 1.30 0.02 7.6 0.04 0.68
and 226.95 227.90 0.95 0.06 2.                                                         .02 1.4 0.04 0.85
LM-11-049EXT No significant assays

 

Lengths are core lengths. True widths are estimated at approximately 80% of core length for LM-26-172, 90% for LM-26-171, 90 to 95% for LM-26-173 and LM-26-175, and 85 to 90% for LM-26-176. All assays are uncut. CuEq (%) = Cu (%) + [(Pb (%) × 22.046 × Pb rec. × Pb price) + (Zn (%) × 22.046 × Zn rec. × Zn price) + (Ag (g/t) ÷ 31.10348 × Ag rec. × Ag price) + (Au (g/t) ÷ 31.10348 × Au rec. × Au price)] ÷ (Cu price × 22.046 × Cu rec.), using metal prices of US$4.97/lb Cu, US$1.35/lb Zn, US$0.95/lb Pb, US$42.30/oz Ag and US$3,285/oz Au (CTM Lundberg 2026 MRE prices, see CTM news release dated October 6, 2026) and Lemarchant metallurgical recoveries of 79.50% Cu, 91.46% Zn, 82.42% Pb, 68.22% Ag and 84.23% Au (Thibault & Associates Inc., 2017). Payability and smelter terms have not been applied.

 

 Figure 2. Plan view of the Lemarchant Deposit showing the traces of holes LM-26-171 to LM-26-176, the projected outline of the massive sulphide horizon and the 2026 Phase 2 drill holes.

 

 Figure 3. Cross-section through hole LM-26-172 looking north, showing the 18.75 m intercept relative to the Lemarchant massive sulphide horizon. Holes within 25 m of the section plane are shown.

 

 Figure 4. Cross-section B–B′ looking north-northwest through holes LM-26-174 to LM-26-176, showing the 13.10 m intercept grading 1.21% CuEq (including 2.10 m of 3.86% CuEq) in LM-26-176 relative to the 2018 historical massive sulphide and semi-massive to stockwork sulphide domains. Holes within 25 m of the section plane are shown.

 

Lemarchant Deposit and Historical Resource Estimate

 

The Lemarchant Deposit hosts a historical mineral resource estimate from 2018 (Table 2), reported at a 4.0% zinc equivalent cut-off, as set out in the Technical Report titled “NI 43-101 Technical Report and Updated Mineral Resource Estimate on the Lemarchant Deposit, South Tally Pond Property, Central Newfoundland, Canada”. A Qualified Person has not done sufficient work to classify the historical estimate as current Mineral Resources or Mineral Reserves, and Canterra is not treating the historical estimate as current Mineral Resources or Mineral Reserves.

 

Table 2. Lemarchant Deposit historical mineral resource estimate (effective date September 20, 2018)

 

Category Tonnes Cu Zn Pb Ag Au CuEq ZnEq
  (Mt) (%) (%) (%) (g/t) (g/t) (%) (%)
Indicated 2.42 0.68 6.15 1.60 64.04 1.22 4.89 12.40
Inferred 0.56 0.45 4.68 1.08 44.67 1.06 3.66 9.31

ZnEq grades are as reported in the 2018 Technical Report (ZnEq (%) = Zn (%) + [(Pb (%) × 22.046 × 0.8242 × 1.00) + (Cu (%) × 22.046 × 0.795 × 3.21) + (Ag (g/t) ÷ 31.10348 × 0.6822 × 19) + (Au (g/t) ÷ 31.10348 × 0.8423 × 1,351)] ÷ (1.10 × 22.046 × 0.9146)), using metal prices of US$1.10/lb Zn, US$1.00/lb Pb, US$3.21/lb Cu, US$1,351/oz Au and US$19/oz Ag and the metallurgical recoveries stated above. CuEq grades have been calculated by Canterra from the reported grades using the same 2018 metal prices and recoveries. Tonnages are rounded to the nearest 10,000 tonnes.

 

Table 3. Drill collar information, holes LM-26-171 to LM-26-176 and LM-11-049EXT

 

Hole ID Easting Northing Elevation (m) Azimuth (°) Dip (°) Length (m)
LM-26-171 520,884 5,374,981 336 290 −65 196.0
LM-26-172 521,227 5,374,947 334 272 −48 348.0
LM-26-173 520,951 5,374,473 336 305 −55 338.3
LM-26-174 521,204 5,374,832 330 084 −45 301.0
LM-26-175 521,204 5,374,832 330 201 −77 229.0
LM-26-176 521,204 5,374,832 330 249 −48 325.0
LM-11-049EXT 521,162 5,375,541 343 270 −55 848.0

Coordinates are UTM NAD83 Zone 21N. All holes were drilled at NQ core diameter; LM-26-171 and LM-26-172 by Springdale Forest Resources and LM-26-173 to LM-26-176 and LM-11-049EXT by Trust Drilling.

 

QA/QC Protocols

 

Core samples, together with standards, blanks and duplicates, were submitted to Eastern Analytical Ltd. in Springdale, Newfoundland, for preparation and analysis. All samples were taken from saw-cut NQ drill core, with one half retained for reference and one half submitted for analysis. Samples were delivered in sealed bags by Canterra personnel to Eastern, an accredited assay laboratory conforming to ISO/IEC 17025 requirements. Samples were analyzed by 30 g gold fire assay with atomic absorption finish and by four-acid ICP-OES multi-element analysis (ICP-34), with over-limit Cu, Pb, Zn and Ag determined by atomic absorption.

 

For the seven drill holes reported in this news release, 23 control samples were inserted among 201 core samples, representing approximately 10% of the sample stream, comprising certified reference materials CDN-ME-1806, CDN-ME-2310, CDN-SE-1 and CDN-FCM-4, blanks and field duplicates. The Qualified Person reviewed the QA/QC results and determined the results to be within accepted limits for the reference and blank materials.

 

Qualified Person

 

Paul Moore, M.Sc., P.Geo. (NL), Vice President of Exploration, is the Qualified Person for the Company as defined under National Instrument 43-101 and has reviewed and approved the scientific and technical information in this news release.

 

Newfoundland and Labrador Junior Exploration Assistance

 

Canterra would like to acknowledge financial support it received from the Government of Newfoundland and Labrador’s Junior Exploration Assistance Program related to the completion of its 2024 and 2025 programs, and any support it may receive for its 2026 exploration programs in the Buchans District.

 

About Canterra Minerals

 

Canterra is a diversified minerals exploration company focused on critical minerals and gold in central Newfoundland. The Company’s projects include seven mineral deposits located in close proximity to the world-renowned, past-producing Buchans Mine and Teck Resources’ Duck Pond Mine, which collectively produced copper, zinc, lead, silver and gold. Several of Canterra’s deposits support current and historical Mineral Resource Estimates prepared in accordance with National Instrument 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves. Canterra’s gold projects are located on trend of Equinox Gold’s Valentine Mine and cover an approximately 55 km extension of the same structural corridor that hosts gold mineralization within Equinox Gold’s mine. Past drilling by Canterra and others within the Company’s gold projects intersected multiple occurrences of orogenic-style gold mineralization within a large land position that remains underexplored.

 

Posted November 10, 2026

Share this news article

MORE or "UNCATEGORIZED"


Q2 Metals Announces PEA with C$13.5 Billion After-Tax NPV₈ for 1.7 Mtpa Cisco Lithium Project in Québec, Canada

Highlights: Strong project economics: After-tax NPV₈ of C$13.49... READ MORE

November 10, 2026

NexGold Intersects 1.35 g/t Gold over 38.9 Metres, 1.42 g/t Gold over 27.2 Metres, and 54.04 g/t Gold over 1.3 Metres at the Goldlund Deposit, Ontario

NexGold Mining Corp. (TSX-V: NEXG) (OTCQX: NXGCF) is pleased to ... READ MORE

November 10, 2026

Premier American Uranium Completes US$5 Million Strategic Equity Investment by DISA Uranium; IsoEnergy Increases its Strategic Holding

Premier American Uranium Inc. (TSX-V: PUR) (OTCQB: PAUIF) is plea... READ MORE

November 10, 2026

Super Copper Hits Copper in Every Hole at El Alto: First Assays Return Up to 2.56% CuEq, Open at Depth

Copper-bearing mineralization logged in all eight holes along an ... READ MORE

November 10, 2026

Copyright 2026 The Prospector News