The Prospector News

Thunder Gold Intersects Continuous Gold Mineralization Averaging 0.407 g/t Au Over 336.0 Metres and 0.527 g/t Au Over 290.1 Metres at Tower Mountain, Ontario

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Thunder Gold Intersects Continuous Gold Mineralization Averaging 0.407 g/t Au Over 336.0 Metres and 0.527 g/t Au Over 290.1 Metres at Tower Mountain, Ontario

 

 

 

 

 

Thunder Gold Corp. (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) is pleased to announce the following infill diamond drill results from the Bench Target, at the Company’s flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario.

 

Highlights:

  • TM26-223 intersected 0.527 g/t Au over 290.1 metres including 1.071 g/t Au over 57.0 metres and 0.923 g/t Au over 27.0 metres;
  • TM25-188/188X intersected 0.407 g/t Au over 336.0 metres including 0.822 g/t Au over 60 metres and 0.532 g/t Au over 117.0 metres;
  • All holes reported in this new release demonstrate spatial and empirical correlation to the 2026 Mineral Resource Estimate (“MRE”);

 

TM25-188X (13.5 metres averaging 0.755 g/t Au) and TM26-219 (6.0 metres averaging 0.637 g/t Au) were exploration holes targeting the interpreted northern contact of the Bench-3738-Ellen (“B-E“) trend (Reference Table 1.0, Figure 1.0 and Figure 2.0).

 

TM26-223 (290.1 metres averaging 0.527 g/t Au) tested the current, interpreted southeast limit of the B-E trend (Reference Table 1.0, Figure 1.0 and Figure 3.0). The hole is located approximately 50 metres below hole TM04-031 (250.5 metres averaging 0.567 g/t Au) and 150 metres above hole TM26-214 (111.0 metres averaging 0.514 g/t Au).

 

Wes Hanson, President and CEO states, “Our Infill drilling continues to return long, continuously mineralized intervals within the currently defined Inferred Resource component of the 2026 Mineral Resource Estimate. Both TM25-188X and TM26-223 correlate well with the MRE model and both holes support our interpretation of sub-vertical continuity of the 700-metre-long x 200-metre-wide B-E trend which we have successfully extended to a depth of 500 metres from surface. Since mid-August, we have delivered a total of 3.9 kilometres of semi-continuous gold mineralization, averaging 0.467 g/t Au, from the thirteen (13) holes completed to date. Our ongoing, fully funded, infill drill program remains on track to increase that total before the Christmas break. Average drilled grade of the thirteen (13) holes continues to demonstrate positive variance relative to the model predicted grade estimated by the 2026 MRE.”

 

“Twelve of thirteen holes reported to date include continuously mineralized intervals at a 0.40 g/t cut-off grade, ranging in drilled length from 13.5 metres to 228.5 metres with length-weight averaged grades ranging from 0.503 g/t Au to 2.237 g/t Au (Reference Table 3.0). This population, collectively, totals 1.2 kilometres of mineralization at a cut-off grade of 0.40 g/t Au.”

 

Table 1.0 provides the location and orientation of holes TM25-188/188X, TM26-219 and TM26-223.

 

Figure 1.0 is a plan view showing the location of the drill holes reported in this news release.

 

Table 2.0 summarizes the highlights of the three holes that are the subject of this news release.

 

Table 1.0 – B-E Target – Drill Hole Location Bearing and Dip

 

Hole ID Easting Northing Elevation Bearing Dip TD
TM25-188 300442 5377598 453.5 41.5 -55.4 276
TM25-188X 300553 5377716 208.006 46.33 -53.8 201
TM26-219 300550 5377693 426 40 -54.7 252
TM26-223 300891 5377410 497 40 -54.9 402

 

 Figure 1.0 Bench Target Diamond Drill Plan – October 26, 2026

 

TM25-188/188X

 

TM25-188X (Figures 1.0 and 2.0) confirmed the location of the interpreted northern contact of the B-E trend, collaring in mineralization at the end of hole TM25-188 and extending the mineralization an additional 63.0 metres averaging 0.371 g/t Au. The remainder of the hole returned gold grades below the current cut-off grade used to report mineral resources (0.190 g/t Au) to the end-of-hole with scattered results greater than 0.19 g/t Au included in the reported intervals provided in Table 2.0.

 

Collectively, TM25-188/188X intersected semi-continuous gold mineralization over a combined interval of 336.0 metres averaging 0.407 g/t Au from the drill hole collar to the northern B-E contact. Gold mineralization is disrupted by two, late, barren dikes totaling 52.5 metres with the remainder of the interval returning gold values ranging from 0.10 g/t Au to a maximum of 8.32 g/t Au.

 

The average grade of TM25-188X compares favourably to the grade predicted by the Jan. 19, 2026, MRE model, demonstrating a positive variance for the 201.0 metres drilled (Reference Figure 4.0).

 

Table 2.0 – TM25-188/188X, TM26-219 and TM26-223 Significant Results

 

Hole ID From
(m)
To
(m)
Length
(m)
Grade
(Au g/t)
True Width
(m)
TM25-188 3.0 339.0 336.0 0.407 184.8
includes 3.0 51.0 48.0 0.100 26.4
and 51.0 67.5 16.5 0.429 9.1
and 67.5 82.5 15.0 0.119 8.3
and 82.5 109.5 27.0 0.266 14.9
and 109.5 148.5 39.0 0.094 21.5
and 148.5 208.5 60.0 0.822 33.0
and 208.5 222.0 13.5 0.038 7.4
and 222.0 339.0 117.0 0.532 64.4
includes 222.0 276.0 54.0 0.720 29.7
and TM25-188X 276.0 339.0 63.0 0.371 34.7
includes 276.0 289.5 13.5 0.755 7.4
and 289.5 339.0 49.5 0.267 27.2
and 339.0 399.0 60.0 0.123 Unknown
and 399.0 439.5 40.5 0.035 Unknown
and 439.5 477.0 37.5 0.134 Unknown
TM26-219 0.0 15.0 15.0 0.069 Unknown
and 15.0 19.5 4.5 0.431 Unknown
and 19.5 58.5 39.0 0.048 Unknown
and 58.5 64.5 6.0 0.637 Unknown
and 64.5 84.0 19.5 0.088 Unknown
and 84.0 90.0 6.0 0.298 Unknown
and 90.0 117.0 27.0 0.107 Unknown
and 117.0 129.0 12.0 0.211 Unknown
and 129.0 252.0 123.0 0.043 Unknown
TM26-223 3.9 294.0 290.1 0.527 159.7
includes 3.9 10.5 6.6 0.111 3.6
and 10.5 67.5 57.0 1.071 31.4
and 67.5 126.0 58.5 0.396 32.2
and 126.0 177.0 51.0 0.089 28.1
and 177.0 205.5 28.5 0.643 15.7
and 205.5 225.0 19.5 0.151 10.7
and 225.0 256.5 31.5 0.499 17.3
and 256.5 267.0 10.5 0.119 5.8
and 267.0 294.0 27.0 0.923 14.9
and 294.0 402.0 108.0 0.077 Unknown

 

True width is estimated where sufficient data allows. Where True Width is not estimated it is due to insufficient data.

 

TM26-219

 

TM26-219 was drilled to clarify the limit of the northern B-E contact near surface. TM26-219 intersected semi-continuous gold values from the collar to the end-of hole with scattered intervals greater than the 0.190 g/t Au cut-off grade over intervals of up to 6.0 metres in length. The average grade of TM26-219 compares unfavourably to the model predicted grade (Reference Figure 4.0).

 

Figure 2.0 – Cross Section TM25-188/188X and TM26-219

 

TM26-223

 

TM26-223 was collared north of the current interpreted northern contact of the B-E trend (Reference Figures 1.0 and 3.0). This hole collared and remained in semi-continuous to continuous gold mineralization for a down-hole length of 290.1 metres averaging 0.527 g/t Au (Reference Table 2.0), with intervals of 57.0 metres averaging 1.071 g/t Au (starting at 10.5 metres), 28.5 metres averaging 0.643 g/t Au and 27.0 metres averaging 0.923 g/t Au. The estimated true width of the intercept is 159.7 metres. TM26-223 bisects a large block of inferred resources previously defined by holes TM04-031 (250.5 metres averaging 0.567 g/t Au) and TM26-214 (111.0 metres averaging 0.514 g/t Au).

 

The southern B-E contact was intersected where anticipated (Reference Figure 3.0) and the comparison between model predicted grade to the actual drill intersected grade for the entire hole is favourable with actual grade slightly higher than modeled grade (Reference Figure 4.0).

 

Figure 3.0 – Cross Section TM26-223

 

Summary of Infill Drill Program

 

Since August 11, 2026, we have released results for thirteen (13) infill drill holes totalling 5,798.8 metres, all of which targeted Inferred resources within the B-E trend. These holes have all intersected continuous to semi-continuous gold grades from surface to the current maximum drill depth, approximately 600 metres vertically from surface.

 

More than 56% of the results received to date have returned gold grades greater than 0.10 g/t Au. This is 5% higher than the historical drill data for the project (1988 to 2025).

 

Approximately 22% of the results to date have returned gold grades greater than 0.40 g/t Au. This is almost double the population defined by the historical drill data (1988 to 2025).

 

Table 3.0 summarizes the intervals greater than 0.40 g/t Au intersected to date during the 2026 infill drill campaign.

 

Table 3.0 – Infill Drilling – Project to Date – Intervals Greater Than a 0.40 g/t Au Cut-off Grade

 

Hole ID From
(metres)
To
(metres)
Interval
(metres)
Au
(g/t)
TM26-210 196.50 211.50 15.00 1.650
430.50 448.50 18.00 2.327
504.00 517.50 13.50 1.070
525.00 552.00 27.00 1.117
619.50 678.00 58.50 1.397
TM21-107X 209.50 438.00 228.50 0.557
TM23-137X 447.00 469.50 22.50 0.602
486.00 522.00 36.00 0.670
675.00 702.00 27.00 0.830
TM26-205 6.00 60.00 54.00 1.088
555.00 568.50 13.50 1.283
TM26-214 319.50 430.50 111.00 0.514
TM26-217 385.50 418.50 33.00 1.383
463.50 517.50 54.00 0.530
TM26-218 258.00 399.00 141.00 0.503
TM25-186X 435.00 468.00 33.00 0.785
481.50 501.00 19.50 0.523
TM26-220 31.50 106.50 75.00 0.551
TM26-221 198.00 357.00 159.00 0.894
438.00 450.00 12.00 0.785
TM26-223 10.50 67.50 57.00 1.071
177.00 205.50 28.50 0.643
267.00 294.00 27.00 0.923
TM25-188X 276.00 289.50 13.50 0.755

 

 

MRE Reconciliation

 

Reconciliation of drill results to date for the Bench Target relative to the 2026 MRE model suggest an overall grade increase relative to model-predicted grades. Figure 4.0 presents a summary of model-predicted grades compared to actual drilled grade for the thirteen (13) infill holes completed to date. All thirteen holes post-date the 2026 MRE model and therefore can be compared directly to model-predicted grades to measure the predictive accuracy of the model.

 

The results indicate significant variation on a hole-by-hole basis, ranging from a low of -73% (TM26-219) to a high of 100% (TM26-210). This is typical and within expected tolerances. On a length-weighted average basis, the comparison suggests that actual drilled grade of all ten holes is ~5% higher than the predicted modeled grade.

 

Similar results are observed for the project to date in exploration drill holes completed at the UV Target and the holes drilled along the eastern margin of the 2026 MRE optimized pit limit, targeting the large un-estimated portion of the model (Reference Figure 5.0). The exploration data set also suggests that drilled grades are returning higher values than what is currently predicted by the 2026 MRE.

 

Both analyses exclude mineralization intersected outside the 2026 MRE model limit, specifically, the high-grade results intersected in holes TM26-210 and TM23-137X that extend beyond the base of the 2026 MRE model.

 

Figure 4.0 – Modelled Grade Versus Drilled Grade, Infill Drilling, 2026; Weighted by Interval Length

 

 Figure 5.0 – Modelled Grade Versus Drilled Grade, Exploration Drilling, 2026; Weighted by Interval Length

 

Quality Assurance and Quality Control

 

Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it is photographed, logged for geotechnical, physical properties and geological data. Samples are identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically employed, varying only at major lithological contacts.

 

Certified standards and blanks are randomly inserted into the sample stream and constitute approximately 10% of the sample stream. Certified standards and blank performance is monitored with any failures evaluated and investigated to determine if said failure is a result of error during submission. Any unexplained failures are identified and the five samples preceding and following the failure are re-assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The duplicate pulps are sent to a second independent analytical facility for analyses.

 

Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent analytical service provider.

 

AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent analytical facility.

 

Samples are, received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion (FA) with an atomic absorption (AAS) finish. All assay results greater than 5.0 g/t Au are re-assayed using a gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149 µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of each size fraction.

 

Qualified Person

 

Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo., President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established by NI 43-101.

 

About the Tower Mountain Gold Property

 

The 7,625-hectare, 100%-owned Tower Mountain Property is beside the Trans-Canada highway, 40-km west of Thunder Bay, Ontario (pop. 120,000). Gold mineralization occurs in variably brecciated and altered rocks surrounding the calc-alkalic Tower Mountain Intrusive Complex. Drilling to date has established an initial mineral resource parallel to the western contact of the intrusion representing approximately 25% of the TMIC halo.

 

The MRE has an effective date of January 19, 2026. A Technical Report titled “NI 43-101 Technical Report for the 2026 Mineral Resource Estimate on the Tower Mountain Project, Ontario, Canada.” is available on the Company’s website at www.thundergoldcorp.com and on SEDAR+ (www.sedarplus.ca) under the Company’s Issuer profile.

 

The Report was prepared by Charley Murahwi, P.Geo., FAusIMM.; William Lewis, P.Geo., Tudorel Ciuculescu, P.Geo., and Richard Gowans, P.Eng., all of Micon International Limited, Toronto, Ontario, Canada. The Report was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and CIM Definition Standards of Mineral Resources and Mineral Reserves.

 

The MRE is summarized as follows:

 

Tower Mountain Mineral Resource Estimate – January 19, 2026

 

Category Tonnage
(Mt)
Grade
(g/t Au)
Contained Metal
(‘000 oz gold)
Indicated 34.5 0.46 514
Inferred 211.1 0.45 3,053

 

Notes:

  1. The effective date of this MRE is January 19, 2026.
  2. Messrs. William Lewis, P.Geo., Charley Murahwi, P.Geo., FAusIMM, and Tudorel Ciuculescu, P.Geo. from Micon International Limited are the Qualified Persons (QPs) responsible for this MRE.
  3. The MRE has been classified in the Indicated and Inferred categories. At this time, there are no Measured resources at the Tower Mountain Project.
  4. The calculated gold cut-off grade is 0.19 g/t Au.
  5. An average specific gravity (SG) value of 2.77 g/cm3 was used.
  6. The MRE used economic assumptions for open pit mining. The following economic parameters were used for generating the cut-off grade: a gold price of US$3,000/oz, 80% recovery, open pit mining cost of US$3.0/t, processing costs of US$8.0/t, general and administration cost of US$3.5/t, transportation cost of US$2.5/oz of gold, and a royalty of 3%.
  7. The open pit used slope angles of 30° in overburden and 50° in fresh rock.
  8. The block model is orthogonal and has a parent block size of 5 m x 5 m x 5 m, with minimum sub-block size of 2.5 m x 2.5 m x 2.5 m.
  9. The open pit optimization used a re-blocked size of 10 m x 10 m x 10 m.
  10. The mineral resources described above have been prepared in accordance with the current Canadian Institute of Mining, Metallurgy and Petroleum Standards and Practices.
  11. Numbers have been rounded to the nearest million tonnes and nearest thousand ounces. Differences may occur in totals due to rounding.
  12. Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of reported Inferred Mineral Resources are uncertain in nature and there has been insufficient exploration; however, it is reasonably expected that a significant portion of Inferred Mineral Resources could be upgraded into Indicated Mineral Resources with further exploration.
  13. Micon QPs have not identified any legal, political, environmental, or other relevant factors that could materially affect the potential development of the mineral resources and of the estimate.

 

The remaining 75% of the TMIC halo demonstrates similar geology, alteration, and geophysical signatures and is untested by drilling.

 

A second gold trend, identified in 2026, outcrops at surface and is continuously mineralized over a 100-metre width. This gold mineralization occurs within Timiskaming-type conglomerates that have been traced for over 5.0 kilometres along a southwest trend paralleling the Thunder Lake Fault. The Company believes both targets offer opportunities to materially increase the total resource through systematic drilling.

 

About Thunder Gold Corp.

 

Thunder Gold is advancing the Tower Mountain project in Thunder Bay, Ont. — an emerging gold system with the scale, consistency and quality to support a long-life, open-pit operation. Results from the disciplined drill programs have consistently reinforced confidence in the continuity and predictability of the discovery while highlighting significant potential for expansion across multiple zones of the Tower Mountain intrusive complex. With industry-leading drilling costs, existing infrastructure and a skilled local work force, Tower Mountain represents a rare combination of size, scalability and cost-effective growth.

 

At Thunder Gold, our vision is clear: to unlock a discovery that has the potential to become a transformational gold project, delivering long-term value for shareholders while contributing to the future of Canada’s mining industry.

 

Posted October 26, 2026

Share this news article

MORE or "UNCATEGORIZED"


Blue Star Reports Exploration Results Including Significant Gold Intercepts in Step-Out Drilling at NFN Deposit

Blue Star Gold Corp. (TSX-V: BAU) (OTCQB: BAUFF) (FSE: 5WP0) anno... READ MORE

October 26, 2026

Argenta Silver Identifies Potential Second Silver System – Near-Surface – at El Quevar; Mobilizes Third Drill Rig to Test Surface Mineralization

Argenta Silver Corp. (TSX-V: AGAG) (OTCQX: AGAGF) (FSE: T1K) is p... READ MORE

October 26, 2026

Inomin Extends Beaver-Lynx Discovery Footprint with Further Long Mineralized Intervals

Latest Drilling Results from Lynx Include 402 Metres of 0.20% Nic... READ MORE

October 26, 2026

Fury Intersects 14.95 g/t Gold over 4.25 Metres at Eau Claire, Extending High-Grade Mineralization 60 Metres Up-Dip

Fury Gold Mines Limited (TSX:FURY) (NYSE American: FURY) is pleas... READ MORE

October 26, 2026

Copyright 2026 The Prospector News