Endeavour Silver Corp. (NYSE: EXK) (TSX: EDR) reports third quarter 2026 production of 2,096,545 silver ounces, 10,126 gold oz, and in combination with base metals, a silver equivalent(1) production of 3.6 million oz. Year-to-date production was 5,915,874 silver oz and 32,340 gold oz for a total silver equivalent(1) production of 10.4 million oz. All dollar amounts are in US dollars ($).
“Despite temporary operational disruptions, we are encouraged by our underlying metrics in the third quarter, with the Terronera plant reaching optimal processing performance and the Kolpa expansion exceeding expectations.” commented Dan Dickson, Chief Executive Officer. “This performance reflects the focus and resilience of our teams, who responded effectively to temporary operational disruptions while maintaining a strong commitment to safe production. With these challenges successfully managed and with our operations continuing to advance, we are well positioned to build on this progress and carry positive momentum into the fourth quarter.”
Q3 2026 Production Overview
Q3 2026 Operations
Consolidated silver production was 2,096,545 oz in Q3 2026, slightly below plan, and 19% higher than 1,766,926 oz produced in Q3 2025. Higher production is attributed to the higher silver production from Kolpa and the additional 710,670 oz of silver contributed by Terronera, which achieved commercial production on October 1, 2025. These higher contributions were partially offset by the sale of Bolañitos which was finalized on January 15, 2026. Silver production at Guanaceví was 31% lower in Q3 2026 compared to Q3 2025, predominantly due to 24% lower silver grades and 10% lower throughput.
Consolidated gold production was 10,126 oz in Q3 2026, 39% higher than 7,285 oz produced in Q3 2025. Higher production is primarily attributable to the addition of 7,157 oz from Terronera, partially offset by the sale of Bolañitos. Gold production at Guanacevi was 7% lower than Q3 2025, predominantly due to the 10% lower throughput and 1% lower gold grade.
Terronera’s Q3 2026 production was slightly below plan, reflecting lower throughput during the blockade in August. In September 2026, following the resolution of the blockade, Terronera processed 60,313 tonnes and produced 299,398 oz of silver and 2,472 oz of gold during the month.
During Q3 2026, Terronera recoveries averaged 88.0% for silver and 75.0% for gold, slightly above Q1 and Q2 2026 and in line with plan. Recoveries improved during the quarter, as shown in the monthly production results table below, trending from 85.6% in July and 86.2% in August achieving a recovery of 91.1% in September reflecting the success of optimization work undertaken during the period. Ore grades of 152 grams per tonne (gpt) compared to 126 in Q2 2026 for silver and 1.80 gpt of gold compared to 1.87 in Q2 2026 for gold were in line with plan for the quarter. Grades improved as planned with sill development in higher grade zones commencing during the quarter.
Guanaceví’s throughput was 10% lower than Q3 2025 due to the reduction in capacity in September. Grades were higher than in the preceding quarters but lower than Q3 2025 due to the planned mining sequence through lower-grade areas of the deposit and higher than planned dilution. Supplies of local third-party mill feed continued to supplement Guanaceví production, amounting to 33% of quarterly throughput.
Kolpa’s throughput in Q3 2026 was 256,052 tonnes producing 682,903 oz of silver, compared to 233,408 tonnes producing 633,288 oz of silver in Q2 2026, following the plant ramp-up to 2,500 tonnes per day at the end of Q1 2026. The processed material in Q3 2026 averaged grades of 92 g/t silver, 2.67% lead, 2.08% zinc and 0.25% copper. Despite the slightly lower grades, due to the significant increase in throughput, production of silver exceeded plan while production of base metals remained in line with plan.
Updated Guidance
With operational interruptions at Terronera and Guanaceví during the quarter, the Company will be performing recalculations of full year production and cost guidance. Production for the full year is expected to be at or slightly below the low end of the guided range. A guidance update will be provided with the third quarter earnings release on November 9, 2026.
Consolidated Production Highlights for the Three and Nine Months Ended September 30, 2026
| Three Months Ended September 30 | Nine Months Ended September 30 | |||||
| 2026 | 2025 | % Change | 2026 | 2025 | % Change | |
| 510,944 | 400,245 | 28% | Throughput (tonnes) | 1,477,177 | 913,580 | 62% |
| 2,096,545 | 1,766,926 | 19% | Silver ounces produced | 5,915,874 | 4,456,455 | 33% |
| 10,126 | 7,285 | 39% | Gold ounces produced | 32,340 | 23,379 | 38% |
| 6,504 | 5,664 | 15% | Lead tonnes produced | 17,650 | 9,167 | 93% |
| 4,558 | 3,666 | 24% | Zinc tonnes produced | 11,389 | 5,982 | 90% |
| 143 | 120 | 20% | Copper tonnes produced | 336 | 178 | 89% |
| 2,031,425 | 1,725,317 | 18% | Payable silver ounces produced | 5,719,334 | 4,373,087 | 31% |
| 9,852 | 7,151 | 38% | Payable gold ounces produced | 31,370 | 22,978 | 37% |
| 3,611,034 | 3,037,156 | 19% | Silver equivalent ounces produced1 | 10,390,771 | 7,438,645 | 40% |
| 1,900,368 | 1,762,484 | 8% | Silver ounces sold | 5,596,696 | 4,441,848 | 26% |
| 9,499 | 7,478 | 27% | Gold ounces sold | 31,265 | 23,722 | 32% |
1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne. Silver equivalent for 2025 is calculated using 80 silver oz to 1 gold oz; 60 silver oz to 1 lead tonne; 85 silver oz to 1 zinc tonne; 300 silver oz to 1 copper tonne ratios.
Bolañitos mine was sold January 15, 2026, and is included in the consolidated results above.
Production Tables for the Three Months Ended September 30, 2026, by mine
| Three Months Ended September 30, 2026 | Terronera | Guanaceví | Kolpa |
| Tonnes processed | 165,171 | 89,722 | 256,052 |
| Tonnes per day | 1,795 | 975 | 2,783 |
| Silver ounces produced | 710,670 | 702,972 | 682,903 |
| Silver grade gpt | 152 | 257 | 92 |
| Silver recovery | 88.0% | 94.9% | 90.3% |
| Gold ounces produced | 7,157 | 2,969 | – |
| Gold grade gpt | 1.80 | 1.06 | – |
| Gold recovery | 75.0% | 96.8% | – |
| Lead tonnes produced | – | – | 6,504 |
| Lead grade % | – | – | 2.67% |
| Lead recovery % | – | – | 95.2% |
| Zinc tonnes produced | – | – | 4,558 |
| Zinc grade % | – | – | 2.08% |
| Zinc recovery % | – | – | 85.7% |
| Copper tonnes produced | – | – | 143 |
| Copper grade % | – | – | 0.25% |
| Copper recovery % | – | – | 22.7% |
| Silver equivalent ounces produced1 | 1,354,759 | 970,205 | 1,286,070 |
Totals may not add up due to rounding.
1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne.
Terronera Production by Month for the Three Months Ended September 30, 2026
The table below presents monthly production at Terronera during the third quarter. Metal recoveries improved throughout the quarter as processing activities were refined and optimized. Metal grades also strengthened as sill development commenced in higher-grade zones during the third quarter.
| Three Months Ended September 30, 2026 | July | August | September | Total |
| Tonnes processed | 65,307 | 39,551 | 60,313 | 165,171 |
| Tonnes per day | 2,107 | 1,276 | 2,010 | 1,795 |
| Silver ounces produced | 230,405 | 180,868 | 299,398 | 710,670 |
| Silver grade gpt | 128 | 165 | 169 | 152 |
| Silver recovery | 85.6% | 86.2% | 91.1% | 88.0% |
| Gold ounces produced | 3,049 | 1,635 | 2,472 | 7,157 |
| Gold grade gpt | 1.95 | 1.73 | 1.67 | 1.80 |
| Gold recovery | 74.3% | 74.5% | 76.3% | 75.0% |
| Silver equivalent ounces produced1 | 504,836 | 328,042 | 521,881 | 1,354,759 |
1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne.
Production Tables for the Nine Months Ended September 30, 2026, by mine
| Nine Months Ended September 30, 2026 | Terronera | Guanaceví | Kolpa |
| Tonnes processed | 516,318 | 285,684 | 661,187 |
| Tonnes per day | 1,891 | 1,046 | 2,422 |
| Silver ounces produced | 1,852,318 | 2,198,851 | 1,846,309 |
| Silver grade gpt | 130 | 259 | 96 |
| Silver recovery | 86.0% | 92.6% | 90.5% |
| Gold ounces produced | 23,301 | 8,547 | – |
| Gold grade gpt | 1.91 | 1.00 | – |
| Gold recovery | 73.4% | 92.7% | – |
| Lead tonnes produced | – | – | 17,650 |
| Lead grade % | – | – | 2.81% |
| Lead recovery % | – | – | 94.9% |
| Zinc tonnes produced | – | – | 11,389 |
| Zinc grade % | – | – | 2.03% |
| Zinc recovery % | – | – | 84.7% |
| Copper tonnes produced | – | – | 336 |
| Copper grade % | – | – | 0.23% |
| Copper recovery % | – | – | 22.1% |
| Silver equivalent ounces produced1 | 3,949,375 | 2,968,054 | 3,410,577 |
1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne.
Bolañitos mine was sold January 15, 2026, and is not included in the breakdown above.
Totals may not add up due to rounding.
Management Change
The Company also announces that Greg Blaylock will be departing from his role as Vice President, Operations. The Company thanks Mr. Blaylock for his dedicated service and wishes him every success in the future.
About Endeavour Silver
Endeavour is a mid-tier silver producer with three operating mines in Mexico and Peru and a robust pipeline of exploration projects across Mexico, Chile, and the United States. With a proven track record of discovery, development, and responsible mining, Endeavour is driving organic growth and creating lasting value on its path to becoming a leading senior silver producer.
Qualified Person
Dale Mah, P.Geo., Vice President Corporate Development, a qualified person under NI 43-101, has approved the scientific and technical information related to operations matters in this news release.
Kirkland Lake Discoveries Corp. (TSX-V: KLDC) (OTCQB: KLKLF) is p... READ MORE
Stardust Metal Corp. (TSX-V: ZIGY) is pleased to announce that it... READ MORE
Spanish Mountain Gold Ltd. ( (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAU... READ MORE
DPM Metals Inc. (TSX: DPM) (ASX: DPM) (ARBN: 689370894) announced... READ MORE
Epic Gold Corp. (CSE: EPG) (OTCQB: NFLDF) (FSE: 6341) is pleased ... READ MORE