The Prospector News

Thunder Gold Reports 121.5 metres Averaging 0.376 g/t Au in New Target Located 200 metres East of Current Resource Pit Optimization Limit

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Thunder Gold Reports 121.5 metres Averaging 0.376 g/t Au in New Target Located 200 metres East of Current Resource Pit Optimization Limit

Thunder Gold Corp. (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) is pleased to announce exploration diamond drill results from the Bench Target, at the Company’s flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario.

Highlights: 

  • TM26-205 identified significant new mineralization east of the current resource pit limit;
  • All seven (7) holes intersected mineralization above the current resource cut-off grade in areas previously estimated to be waste;
  • Results demonstrate good to excellent correlation to the current resource model;
  • TM26-207 and TM26-207A provide twinned hole results indicating minimal variation (less than 5%) over the first 40 metres of both holes and;
  • TM26-213 intersected 287.7 metres averaging 0.223 g/t Au, extending the mineralized trend to the southeast.

Holes TM26-201, 205, 206, 207 and 208 were drilled perpendicular to the interpreted Tower Mountain Intrusive Complex contact probing the eastern extent of the variably brecciated and altered volcanic +/- intrusive horizon hosting the known gold mineralization of the Bench Target. This area was exclusively classified as waste in the 2026 Mineral Resource Estimate due to lack of drill coverage.

Holes TM26-209 and TM26-213 were drilled sub-parallel to the interpreted TMIC contact.

Wes Hanson, President and CEO states, “With the exception of TM26-213, these holes all tested the 150 million tonnes of waste rock within the 2026 MRE pit shell that were not estimated due to insufficient drill coverage. All intervals above the MRE cut-off grade (0.19 g/t Au) offer potential to reduce the waste:ore strip ratio which is already amongst the lowest of our Canadian peer group. The targeted area represents 66% of the total waste included in the 2026 MRE. It is therefore significant that all seven holes intersected intervals above the MRE cut-off grade as these already lie within the current MRE optimized pit shell.”

“The most significant mineralization occurs in TM26-205 (121.5 metres averaging 0.376 g/t Au). This mineralization lies 200 metres east of the 2026 MRE resource pit limit, approximately 400 metres from surface. The target is open in all directions. Follow up drilling targeting the up-dip continuity is planned.” 

“TM26-213 is also significant. Drilled parallel to the eastern TMIC contact, this hole was consistently mineralized from the collar to the end of the hole through an area of sparse drill coverage.”

“We continue to operate two (2) drills and warrant exercises have fully funded our remaining drilling. Year-to-date, we have completed 6,600 metres of exploration drilling and 3,795 metres of resource definition drilling. All-in exploration costs for the year are approximately C$250 per metre. We plan to complete an additional 7,500 metres of resource definition drilling prior to year-end and estimate approximately 60 to 70% of that total will be included in the planned MRE update scheduled for year-end.”

Table 1.0 provides the location and orientation of the reported holes. Figure 1.0 is a plan view showing the location of the drill holes reported in this news release.

Table 1.0 – Bench Target – Resource Expansion Drilling Location Bearing and Dip

Hole ID Easting Northing Elevation Bearing Dip TD
TM26-201 300975.0 5377254.0 521.0 65.0 -45.0 600.0
TM26-205 300901.0 5377465.0 494.0 71.0 -44.5 603.0
TM26-206 301034.0 5377593.0 494.0 40.0 -44.6 399.0
TM26-207 300820.0 5377578.0 463.0 45.0 -44.0 48.0
TM26-207A 300820.3 5377578.3 463.0 45.0 -44.0 600.0
TM26-208 301351.0 5377825.0 476.0 247.0 -44.3 501.0
TM26-209 301108.0 5377711.0 512.0 310.0 -54.7 600.0
TM26-213 300975.0 5377253.5 521.0 135.0 -44.8 593.0


Figure 1.0 Bench Target Resource Expansion Drill Holes – September 2026

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5364/314602_33f1fd3224bb0bf8_001full.jpg

Table 2.0 summarizes the significant results, by primary lithology.

Table 2.0 – Bench Target Resource Expansion Drilling Significant Results

Hole ID Lithology From To Length Grade True Width
(m) (m) (m) (Au g/t) (m)
TM26-201 Volcanics 29.0 32.0 3.0 0.556 1.6
and 55.6 86.0 30.4 0.345 16.2
and 217.5 237.0 19.5 0.228 10.4
Intrusives 367.5 369.0 1.5 5.745 Unknown
and 383.5 415.0 31.5 0.250 Unknown
and 576.5 585.5 9.0 0.260 Unknown
TM26-205 Volcanics 4.9 163.5 158.6 0.545 82.0
includes 6.0 60.0 54.0 1.088 27.9
and 78.0 82.5 4.5 1.433 2.3
and 94.5 97.5 3.0 0.953 1.6
Intrusives 184.5 187.0 2.5 0.489 Unknown
and 295.5 301.5 6.0 0.204 Unknown
and 322.5 336.0 13.5 0.327 Unknown
and 357.0 364.5 7.5 0.632 Unknown
and 373.5 381.0 7.5 0.841 Unknown
and 465.0 586.5 121.5 0.376 Unknown
includes 514.5 532.5 18.0 0.420 Unknown
and 555.0 568.5 13.5 1.283 Unknown
TM26-206 Intrusives 27.0 34.5 7.5 0.191 Unknown
and 172.5 174.0 1.5 1.040 Unknown
and 258.0 264.0 6.0 0.209 Unknown
and 342.0 347.5 5.5 0.197 Unknown
TM26-207 Volcanics 4.5 48.0 43.5 0.341 28.4
TM26-207A Volcanics 2.8 85.3 82.5 0.332 53.8
includes 2.8 45.0 42.2 0.320 27.5
and 43.5 45.0 1.5 1.050 1.0
and 49.5 51.0 1.5 2.210 1.0
Intrusives 85.3 268.8 183.5 0.135 Unknown
includes 85.3 109.5 24.2 0.351 Unknown
Volcanics 268.8 600.0 331.2 0.106 Unknown
TM26-208 Intrusives 3.0 501.0 498.0 0.092 Unknown
includes 354.0 355.5 1.5 1.010 Unknown
and 432.0 433.5 1.5 7.220 Unknown
and 448.5 450.0 1.5 2.090 Unknown
TM26-209 Volcanics 3.5 421.2 417.7 0.077 Unknown
includes 171.0 175.5 4.5 0.304 Unknown
Intrusives 421.2 600.0 178.8 0.121 Unknown

Table 2.0 – Bench Target Resource Expansion Drilling Significant Results (continued)

Hole ID Lithology From To Length Grade True Width
(m) (m) (m) (Au g/t) (m)
TM26-213 Volcanics 4.0 593.0 589.0 0.195 Unknown
includes 4.0 291.7 287.7 0.223 Unknown
includes 30.0 51.0 21.0 0.567 Unknown
and 69.0 111.0 42.0 0.419 Unknown
and 242.6 251.5 8.9 0.800 Unknown
and 273.0 291.7 18.7 0.280 Unknown
Intrusives 291.7 593.0 301.3 0.169 Unknown
includes 291.7 314.8 23.1 0.544 Unknown
includes 307.5 314.8 7.3 1.071 Unknown
and 314.8 379.3 64.5 0.255 Unknown
and 449.3 467.0 17.7 0.230 Unknown
and 539.3 555.0 15.7 0.222 Unknown
and 591.5 593.0 1.5 0.409 Unknown

True Width cannot be estimated due to insufficient information, except where noted.

 

 

TM26-205 Results

Figure 2.0 is a cross section parallel to hole TM26-205 showing the location of the new target discovered 200 metres east of the current resource pit shell. Mineralization is continuous along the entire 121.5 metre interval (Reference Table 3.0).

TM26-205 also intersected the high grade core of the Bench Target near surface, intersecting 158.6 metres averaging 0.545 g/t Au within the brecciated and variably altered host rocks, including 54.0 metres averaging 1.088 g/t Au from surface to the interpreted limit of the Bench trend (Reference Table 4.0). This intercept lies entirely within the current pit limit constraining the 2026 MRE.

The initial 158.6 metres of TM26-205 demonstrates good to excellent correlation to the current resource model, verifying the predictive accuracy in terms of both location and tenor of mineralization. The remaining 444.4 metres demonstrates poor correlation with the current resource model exclusively as a result of a lack of drill coverage which limits the predictive accuracy of the current resource model outside the currently drilled volume (Reference Figure 2.0).


Figure 2.0 – Cross Section TM26-205 (Looking NW) 50 metre Influence

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5364/314602_33f1fd3224bb0bf8_002full.jpg

Tables 3.0 and 4.0 below summarize the individual sample results from TM26-205.

Table 3.0 – TM26-205 – Individual Results From New Target 200 metres East of MRE Pit Limit

From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t
465.0 466.5 0.215 525.0 526.5 0.838 585.0 586.5 0.557
466.5 468.0 0.135 526.5 528.0 0.568
468.0 469.5 0.054 528.0 529.5 0.377
469.5 471.0 0.048 529.5 531.0 0.268
471.0 472.5 0.123 531.0 532.5 0.815
472.5 474.0 0.196 532.5 534.0 0.096
474.0 475.5 0.089 534.0 535.5 0.147
475.5 477.0 0.034 535.5 537.0 0.196
477.0 478.5 0.205 537.0 538.5 0.451
478.5 480.0 0.064 538.5 540.0 0.235
480.0 481.5 0.107 540.0 541.5 0.088
481.5 483.0 0.330 541.5 543.0 0.042
483.0 484.5 1.650 543.0 544.5 0.163
484.5 486.0 0.128 544.5 546.0 0.177
486.0 487.5 0.092 546.0 547.5 0.211
487.5 489.0 0.148 547.5 549.0 0.469
489.0 490.5 0.318 549.0 550.5 1.620
490.5 492.0 0.217 550.5 552.0 0.106
492.0 493.5 0.209 552.0 553.5 0.036
493.5 495.0 0.198 553.5 555.0 0.059
495.0 496.5 0.102 555.0 556.5 0.524
496.5 498.0 0.096 556.5 558.0 0.543
498.0 499.5 0.081 558.0 559.5 0.994
499.5 501.0 0.158 559.5 561.0 1.200
501.0 502.5 0.439 561.0 562.5 6.300
502.5 504.0 0.369 562.5 564.0 0.735
504.0 505.5 0.172 564.0 565.5 0.275
505.5 507.0 0.150 565.5 567.0 0.299
507.0 508.5 0.311 567.0 568.5 0.675
508.5 510.0 0.313 568.5 570.0 0.233
510.0 511.5 0.365 570.0 571.5 0.091
511.5 513.0 0.149 571.5 573.0 0.104
513.0 514.5 0.214 573.0 574.5 0.084
514.5 516.0 0.617 574.5 576.0 0.255
516.0 517.5 0.062 576.0 577.5 0.267
517.5 519.0 0.175 577.5 579.0 0.183
519.0 520.5 0.124 579.0 580.5 0.253
520.5 522.0 0.879 580.5 582.0 0.142
522.0 523.5 0.253 582.0 583.5 0.084
523.5 525.0 0.069 583.5 585.0 0.074

Table 4.0 – TM26-205 Individual Results Bench Target – High Grade Core

From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t
4.9 6.0 0.203 64.5 66.0 0.347 123.0 124.5 0.050
6.0 7.5 0.754 66.0 67.5 0.174 124.5 126.0 0.042
7.5 9.0 0.448 67.5 69.0 0.130 126.0 127.5 0.047
9.0 10.5 1.030 69.0 70.5 0.629 127.5 129.0 0.122
10.5 12.0 0.568 70.5 72.0 0.242 129.0 130.5 0.059
12.0 13.5 0.954 72.0 73.5 0.109 130.5 132.0 0.037
13.5 15.0 1.100 73.5 75.0 0.227 132.0 133.5 0.070
15.0 16.5 0.597 75.0 76.5 0.157 133.5 135.0 0.068
16.5 18.0 0.526 76.5 78.0 0.093 135.0 136.5 0.096
18.0 19.5 0.039 78.0 79.5 1.500 136.5 138.0 0.114
19.5 21.0 0.223 79.5 81.0 1.390 138.0 139.5 0.279
21.0 22.5 1.060 81.0 82.5 1.410 139.5 141.0 0.113
22.5 24.0 0.692 82.5 84.0 0.480 141.0 142.5 0.129
24.0 25.5 0.735 84.0 85.0 0.193 142.5 144.0 0.100
25.5 27.0 0.527 85.0 86.1 0.159 144.0 145.0 2.240
27.0 28.5 0.970 86.1 87.6 0.012 145.0 146.0 0.181
28.5 30.0 2.560 87.6 89.1 0.008 146.0 147.0 0.204
30.0 31.5 0.805 89.1 90.6 0.003 147.0 148.5 0.149
31.5 33.0 0.401 90.6 91.6 0.213 148.5 150.0 0.068
33.0 34.5 0.839 91.6 93.0 0.195 150.0 151.5 0.028
34.5 36.0 1.300 93.0 94.5 0.460 151.5 153.0 0.235
36.0 37.5 1.100 94.5 96.0 0.885 153.0 154.5 0.053
37.5 39.0 0.959 96.0 97.5 1.020 154.5 156.0 0.064
39.0 40.5 2.390 97.5 99.0 0.118 156.0 157.5 0.138
40.5 42.0 1.300 99.0 100.5 0.094 157.5 159.0 1.650
42.0 43.5 0.694 100.5 102.0 0.014 159.0 160.5 0.447
43.5 45.0 1.100 102.0 103.5 0.398 160.5 161.5 0.160
45.0 46.5 0.616 103.5 105.0 0.046 161.5 162.5 0.187
46.5 48.0 0.668 105.0 106.5 0.032 162.5 163.5 0.082
48.0 49.5 0.651 106.5 108.0 0.025
49.5 51.0 1.290 108.0 109.5 0.007
51.0 52.5 4.900 109.5 111.0 0.090
52.5 54.0 0.579 111.0 112.5 0.007
54.0 55.5 1.550 112.5 114.0 0.023
55.5 57.0 1.300 114.0 115.5 0.024
57.0 58.5 3.120 115.5 117.0 0.008
58.5 60.0 0.814 117.0 118.5 0.029
60.0 61.5 0.289 118.5 120.0 0.044
61.5 63.0 0.347 120.0 121.5 0.068
63.0 64.5 0.544 121.5 123.0 0.074

 

TM26-213 Results

TM26-213 was drilled to the southeast, sub-parallel to the interpreted trend of the Bench Target towards the 110 Target through an area of sparse drill density. TM26-213 intersected semi-continuous gold mineralization from surface to the end-of-hole returning 589.0 metres averaging 0.195 g/t Au over the entire drill hole. Approximately 50% of the hole lies within the current optimized pit. The remaining 50% of the hole suggests potential to expand the current resource beyond the currently defined optimized pit limit with a 64.5 metre long interval averaging 0.255 g/t Au observed at the current pit limit.

Overall, TM26-213 demonstrates good to excellent correlation with the current resource model, verifying the predictive accuracy in terms of both location and tenor of mineralization. This hole clearly demonstrates the consistency of grade across the main lithological contact between the volcanics and intrusive rocks which occurs at a depth of 291.7 metres.

Figure 3.0 presents a Cross Section View through hole TM26-213.


Figure 3.0 – Cross Section TM26-213 (Looking E) 50 metre Influence

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/5364/314602_33f1fd3224bb0bf8_003full.jpg

Table 5.0 presents the individual assay results for the entirety of TM26-213.

Table 5.0 – TM26-213 Individual Results Bench-110 Target

From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t
4.0 5.0 0.393 61.5 63.0 0.040 121.5 123.0 0.159
5.0 6.0 0.313 63.0 64.5 0.138 123.0 124.5 0.120
6.0 7.5 0.291 64.5 66.0 0.221 124.5 126.0 0.122
7.5 9.0 0.101 66.0 67.5 0.094 126.0 127.5 0.125
9.0 10.5 0.052 67.5 69.0 0.100 127.5 129.0 0.123
10.5 12.0 0.051 69.0 70.5 0.567 129.0 130.5 0.108
12.0 13.5 0.066 70.5 72.0 0.807 130.5 132.0 0.199
13.5 15.0 0.151 72.0 73.5 0.787 132.0 133.5 0.172
15.0 16.5 0.697 73.5 75.0 0.915 133.5 135.0 0.055
16.5 18.0 0.239 75.0 76.5 0.773 135.0 136.5 0.067
18.0 19.5 0.443 76.5 78.0 0.445 136.5 138.0 0.047
19.5 21.0 0.395 78.0 79.5 0.269 138.0 139.5 0.105
21.0 22.5 0.110 79.5 81.0 0.307 139.5 141.0 0.020
22.5 24.0 0.069 81.0 82.5 0.432 141.0 142.5 0.026
24.0 25.5 0.011 82.5 84.0 0.380 142.5 144.0 0.047
25.5 27.0 0.152 84.0 85.5 0.421 144.0 145.5 0.101
27.0 28.5 0.058 85.5 87.0 0.535 145.5 147.0 0.019
28.5 30.0 0.134 87.0 88.5 0.600 147.0 148.5 0.051
30.0 31.5 0.563 88.5 90.0 0.278 148.5 150.0 0.035
31.5 33.0 1.620 90.0 91.5 0.188 150.0 151.5 0.019
33.0 34.5 0.033 91.5 93.0 0.224 151.5 153.0 0.044
34.5 36.0 0.419 93.0 94.5 0.153 153.0 154.5 0.045
36.0 37.0 0.439 94.5 96.0 0.294 154.5 156.0 0.093
37.0 37.9 0.397 96.0 97.5 0.784 156.0 157.5 0.054
37.9 39.2 0.099 97.5 99.0 0.214 157.5 159.0 0.159
39.2 40.7 0.037 99.0 100.5 0.318 159.0 160.5 0.086
40.7 42.2 0.742 100.5 102.0 0.442 160.5 162.0 0.151
42.2 43.7 0.869 102.0 103.5 0.559 162.0 163.5 0.157
43.7 45.2 0.755 103.5 105.0 0.228 163.5 165.0 0.121
45.2 46.8 0.081 105.0 106.5 0.144 165.0 166.5 0.206
46.8 48.3 0.366 106.5 108.0 0.287 166.5 168.0 0.107
48.3 49.5 1.900 108.0 109.5 0.158 168.0 169.5 0.036
49.5 51.0 0.324 109.5 111.0 0.214 169.5 170.7 0.014
51.0 52.5 0.041 111.0 112.5 0.189 170.7 172.3 0.003
52.5 54.0 0.023 112.5 114.0 0.136 172.3 173.9 0.011
54.0 55.5 0.058 114.0 115.5 0.148 173.9 175.5 0.029
55.5 57.0 0.025 115.5 117.0 0.407 175.5 177.0 0.151
57.0 58.4 0.030 117.0 118.5 0.144 177.0 178.5 0.140
58.4 60.0 0.145 118.5 120.0 0.108 178.5 180.0 0.093
60.0 61.5 0.076 120.0 121.5 0.234 180.0 181.5 0.095

Table 5.0 – TM26-213 Individual Results Bench-110 Target (continued)

From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t
181.5 183.0 0.152 238.0 239.5 0.142 293.8 295.3 0.117
183.0 184.5 0.190 239.5 241.0 0.062 295.3 296.8 0.462
184.5 186.0 0.139 241.0 242.6 0.081 296.8 298.0 0.154
186.0 187.5 0.188 242.6 244.0 1.140 298.0 299.0 0.351
187.5 189.0 0.109 244.0 245.5 2.480 299.0 300.2 0.150
189.0 190.1 0.115 245.5 247.0 0.217 300.2 301.7 0.401
190.1 191.1 0.137 247.0 248.5 0.154 301.7 303.2 0.328
191.1 191.9 0.078 248.5 250.0 0.212 303.2 304.2 0.475
191.9 193.5 0.030 250.0 251.5 0.619 304.2 305.2 0.439
193.5 195.0 0.049 251.5 253.0 0.063 305.2 306.3 0.284
195.0 196.5 0.022 253.0 254.5 0.082 306.3 307.5 0.127
196.5 198.0 0.247 254.5 256.0 0.050 307.5 309.0 0.874
198.0 199.5 0.142 256.0 257.5 0.050 309.0 310.5 1.520
199.5 201.0 0.383 257.5 259.0 0.048 310.5 311.6 1.040
201.0 202.5 0.127 259.0 260.5 0.078 311.6 312.6 1.420
202.5 204.0 0.257 260.5 261.7 0.136 312.6 313.6 0.885
204.0 205.5 0.663 261.7 262.7 0.135 313.6 314.8 0.649
205.5 207.0 0.049 262.7 264.0 0.096 314.8 315.8 0.209
207.0 208.5 0.077 264.0 265.5 0.030 315.8 317.0 0.102
208.5 210.0 0.038 265.5 267.0 0.015 317.0 318.0 0.154
210.0 211.5 0.048 267.0 268.5 0.018 318.0 319.5 0.459
211.5 213.0 0.050 268.5 270.0 0.017 319.5 321.0 0.169
213.0 214.5 0.049 270.0 271.5 0.051 321.0 322.0 0.321
214.5 216.0 0.029 271.5 273.0 0.067 322.0 323.5 0.301
216.0 217.5 0.026 273.0 274.5 0.443 323.5 325.0 0.143
217.5 219.0 0.030 274.5 276.0 0.095 325.0 326.4 0.070
219.0 220.5 0.018 276.0 277.5 0.034 326.4 327.5 0.221
220.5 222.0 0.037 277.5 279.0 0.111 327.5 328.6 0.197
222.0 223.5 0.021 279.0 280.5 0.143 328.6 330.1 0.013
223.5 225.0 0.018 280.5 282.0 0.300 330.1 331.6 0.024
225.0 226.5 0.045 282.0 283.5 0.736 331.6 333.0 0.216
226.5 228.0 0.161 283.5 285.0 0.508 333.0 334.5 0.145
228.0 229.5 0.128 285.0 286.5 0.222 334.5 336.0 0.128
229.5 231.0 0.050 286.5 288.0 0.128 336.0 337.1 0.089
231.0 232.5 0.078 288.0 289.5 0.614 337.1 338.1 0.233
232.5 233.5 0.100 289.5 290.7 0.087 338.1 339.2 0.438
233.5 234.6 0.045 290.7 291.7 0.133 339.2 340.2 0.206
234.6 236.0 0.201 VOLCANIC INTRUSIVE CONTACT 340.2 341.4 0.596
236.0 237.0 0.157 291.7 292.7 0.229 341.4 342.5 0.523
237.0 238.0 0.144 292.7 293.8 0.420 342.5 344.0 0.497

Table 5.0 – TM26-213 Individual Results Bench-110 Target (continued)

From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t
344.0 345.5 0.590 399.5 401.0 0.126 455.8 457.0 0.128
345.5 347.0 0.480 401.0 402.5 0.181 457.0 458.5 0.189
347.0 348.5 0.143 402.5 404.0 0.023 458.5 459.5 0.175
348.5 350.0 0.117 404.0 405.5 0.017 459.5 461.0 0.239
350.0 351.5 0.213 405.5 407.0 0.072 461.0 462.5 0.211
351.5 353.0 0.212 407.0 408.5 0.045 462.5 464.0 0.215
353.0 354.5 0.100 408.5 410.0 0.083 464.0 465.5 0.081
354.5 356.0 0.232 410.0 411.5 0.057 465.5 467.0 0.207
356.0 357.5 0.071 411.5 413.0 0.570 467.0 468.5 0.087
357.5 359.0 0.116 413.0 414.5 0.184 468.5 470.0 0.066
359.0 360.5 0.284 414.5 416.0 0.151 470.0 471.5 0.054
360.5 361.8 0.037 416.0 417.5 0.083 471.5 473.0 0.094
361.8 362.8 0.116 417.5 419.0 0.064 473.0 474.5 0.116
362.8 364.3 0.218 419.0 420.5 0.189 474.5 476.0 0.041
364.3 365.5 0.264 420.5 421.6 0.083 476.0 477.5 0.129
365.5 366.7 0.345 421.6 422.6 0.158 477.5 479.0 0.199
366.7 368.2 0.159 422.6 423.5 0.151 479.0 480.5 0.024
368.2 369.7 0.640 423.5 424.5 0.161 480.5 482.0 0.010
369.7 371.2 0.180 424.5 426.0 0.173 482.0 483.5 0.036
371.2 372.2 0.677 426.0 427.5 0.055 483.5 485.0 0.022
372.2 373.2 0.112 427.5 429.0 0.037 485.0 486.5 0.041
373.2 374.4 1.060 429.0 430.5 0.033 486.5 488.0 0.146
374.4 375.5 0.144 430.5 432.0 0.055 488.0 489.5 0.488
375.5 377.0 0.203 432.0 433.5 0.061 489.5 491.0 0.027
377.0 378.5 0.229 433.5 435.0 0.020 491.0 492.5 0.042
378.5 379.3 0.337 435.0 436.5 0.050 492.5 494.0 0.089
379.3 380.2 0.071 436.5 438.0 0.024 494.0 495.0 0.020
380.2 381.7 0.025 438.0 439.5 0.048 495.0 496.5 0.042
381.7 383.0 0.050 439.5 441.0 0.070 496.5 498.0 0.020
383.0 384.5 0.135 441.0 442.5 0.025 498.0 499.5 0.038
384.5 386.0 0.038 442.5 444.0 0.049 499.5 501.0 0.012
386.0 387.5 0.062 444.0 445.5 0.083 501.0 502.5 0.031
387.5 389.0 0.228 445.5 447.0 0.020 502.5 504.0 0.031
389.0 390.5 0.032 447.0 448.2 0.006 504.0 505.5 0.058
390.5 392.0 0.140 448.2 449.3 0.063 505.5 507.0 0.017
392.0 393.5 0.065 449.3 450.8 0.278 507.0 508.5 0.011
393.5 395.0 0.253 450.8 452.3 0.344 508.5 510.0 0.056
395.0 396.5 0.087 452.3 453.6 0.288 510.0 511.5 0.070
396.5 398.0 0.028 453.6 454.6 0.268 511.5 513.0 0.021
398.0 399.5 0.123 454.6 455.8 0.373 513.0 514.5 0.017

Table 5.0 – TM26-213 Individual Results Bench-110 Target (continued)

From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t
514.5 516.0 0.053 573.0 574.5 0.034
516.0 517.5 0.023 574.5 576.1 0.179
517.5 519.0 0.031 576.1 577.5 0.132
519.0 520.1 0.286 577.5 579.0 0.177
520.1 521.5 0.136 579.0 580.2 0.261
521.5 523.0 0.057 580.2 581.5 0.049
523.0 524.5 0.136 581.5 582.5 0.044
524.5 526.0 0.075 582.5 584.0 0.050
526.0 527.5 0.165 584.0 585.5 0.077
527.5 529.0 0.090 585.5 587.0 0.042
529.0 530.5 0.084 587.0 588.5 0.009
530.5 532.0 0.069 588.5 590.0 0.016
532.0 533.5 0.053 590.0 591.5 0.055
533.5 535.0 0.052 591.5 593.0 0.409
535.0 536.5 0.037
536.5 538.0 0.025
538.0 539.3 0.092
539.3 540.5 0.160
540.5 542.0 0.327
542.0 543.5 0.092
543.5 545.0 0.134
545.0 546.5 0.250
546.5 548.0 0.233
548.0 549.0 0.224
549.0 550.5 0.619
550.5 552.0 0.178
552.0 553.5 0.030
553.5 555.0 0.183
555.0 556.5 0.049
556.5 558.0 0.049
558.0 559.5 0.015
559.5 561.0 0.020
561.0 562.5 0.014
562.5 564.0 0.025
564.0 565.5 0.035
565.5 567.0 0.003
567.0 568.5 0.003
568.5 570.0 0.003
570.0 571.5 0.003
571.5 573.0 0.003

 

 

Quality Assurance and Quality Control

Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it is, photographed, logged for geotechnical, physical properties and geological data. Samples are identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically employed, varying only at major lithological contacts.

Certified standards and blanks are randomly inserted into the sample stream and constitute approximately 10% of the sample stream. Certified standards and blank performance is monitored with any failures evaluated and investigated to determine if said failure is a result of error during submission. Any unexplained failures are identified and the five samples preceding and following the failure are re-assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The duplicate pulps are sent to a second independent analytical facility for analyses.

Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent analytical service provider.

AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent analytical facility.

Samples are, received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion with an atomic absorption finish. All assay results greater than 5.0 g/t Au are re-assayed using a gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149 µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of each size fraction.

 


Qualified Person

Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo., President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established by NI 43-101.

About the Tower Mountain Gold Property

The 7,625-hectare, 100%-owned Tower Mountain Property is beside the Trans-Canada highway, 40-km west of Thunder Bay, Ontario (pop. 120,000). Gold mineralization occurs in variably brecciated and altered rocks surrounding the calc-alkalic Tower Mountain Intrusive Complex. Drilling to date has established an initial mineral resource parallel to the western contact of the intrusion representing approximately 25% of the TMIC halo.

The MRE has an effective date of January 19, 2026. A Technical Report titled ” NI 43-101 Technical Report for the 2026 Mineral Resource Estimate on the Tower Mountain Project, Ontario, Canada.” is available on the Company’s website at www.thundergoldcorp.com and on SEDAR+ (www.sedarplus.ca) under the Company’s Issuer profile.

The Report was prepared by Charley Murahwi, P.Geo., FAusIMM.; William Lewis, P.Geo., Tudorel Ciuculescu, P.Geo., and Richard Gowans, P.Eng., all of Micon International Limited, Toronto, Ontario, Canada. The Report was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and CIM Definition Standards of Mineral Resources and Mineral Reserves.

The MRE is summarized as follows:

Tower Mountain Mineral Resource Estimate – January 19, 2026

Category Tonnage
(Mt)
Grade
(g/t Au)
Contained Metal
(‘000 oz gold)
Indicated 34.5 0.46 514
Inferred 211.1 0.45 3,053

Notes:

  1. The effective date of this MRE is January 19, 2026.
  2. Messrs. William Lewis, P.Geo., Charley Murahwi, P.Geo., FAusIMM, and Tudorel Ciuculescu, P.Geo. from Micon International Limited are the Qualified Persons (QPs) responsible for this MRE.
  3. The MRE has been classified in the Indicated and Inferred categories. At this time, there are no Measured resources at the Tower Mountain Project.
  4. The calculated gold cut-off grade is 0.19 g/t Au.
  5. An average specific gravity (SG) value of 2.77 g/cm3 was used.
  6. The MRE used economic assumptions for open pit mining. The following economic parameters were used for generating the cut-off grade: a gold price of US$3,000/oz, 80% recovery, open pit mining cost of US$3.0/t, processing costs of US$8.0/t, general and administration cost of US$3.5/t, transportation cost of US$2.5/oz of gold, and a royalty of 3%.
  7. The open pit used slope angles of 30° in overburden and 50° in fresh rock.
  8. The block model is orthogonal and has a parent block size of 5 m x 5 m x 5 m, with minimum sub-block size of 2.5 m x 2.5 m x 2.5 m.
  9. The open pit optimization used a re-blocked size of 10 m x 10 m x 10 m.
  10. The mineral resources described above have been prepared in accordance with the current Canadian Institute of Mining, Metallurgy and Petroleum Standards and Practices.
  11. Numbers have been rounded to the nearest million tonnes and nearest thousand ounces. Differences may occur in totals due to rounding.
  12. Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of reported Inferred Mineral Resources are uncertain in nature and there has been insufficient exploration; however, it is reasonably expected that a significant portion of Inferred Mineral Resources could be upgraded into Indicated Mineral Resources with further exploration.
  13. Micon QPs have not identified any legal, political, environmental, or other relevant factors that could materially affect the potential development of the mineral resources and of the estimate.

The remaining 75% of the TMIC halo demonstrates similar geology, alteration, and geophysical signatures and is untested by drilling.

A second gold trend, identified in 2026, outcrops at surface and is continuously mineralized over a 100-metre width. This gold mineralization occurs within Timiskaming-type conglomerates that have been traced for over 5.0 kilometres along a southwest trend paralleling the Thunder Lake Fault. The Company believes both targets offer opportunities to materially increase the total resource through systematic drilling.

 

 

About Thunder Gold Corp.

Thunder Gold is advancing the Tower Mountain project in Thunder Bay, Ont. — an emerging gold system with the scale, consistency and quality to support a long-life, open-pit operation. Results from the disciplined drill programs have consistently reinforced confidence in the continuity and predictability of the discovery while highlighting significant potential for expansion across multiple zones of the Tower Mountain intrusive complex. With industry-leading drilling costs, existing infrastructure and a skilled local work force, Tower Mountain represents a rare combination of size, scalability and cost-effective growth.

At Thunder Gold, our vision is clear: to unlock a discovery that has the potential to become a transformational gold project, delivering long-term value for shareholders while contributing to the future of Canada’s mining industry.

For more information about the Company please visit: www.thundergoldcorp.com.

On behalf of the Board of Directors,
Wes Hanson, P.Geo., President and CEO

 

 

For further information contact:

Wes Hanson, CEO
(647) 202-7686
whanson@thundergoldcorp.com

Bryan Baritot, Investor Relations
IR@thundergoldcorp.com

NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Posted September 17, 2026

Share this news article

MORE or "UNCATEGORIZED"


Cartier announces updated PEA for the Cadillac Project: After-tax NPV5% of C$1.0 billion and after-tax IRR of 26.6% at US$3,600/oz gold price

Cartier Resources Inc. (TSX-V: ECR) (FSE: 6CA) (OTCQB: ECRFF) is pleased to announce the results of... READ MORE

September 17, 2026

Oreterra Wraps up Phase 1 Drilling at Trek South with Visible Copper Minerals and Broad Intercepts of Porphyry-Style Alteration Above Postulated Intrusion; Planning for 2027 Phase 2 Underway, Assays Pending

Oreterra Metals Corp. (TSX-V: OTMC) (OTCQB: OTMCF) (FSE: D4R0) (WKN: A421RQ) is pleased to report t... READ MORE

September 17, 2026

NevGold Intercepts 1.06 g/t Oxide Au Over 42.7 Meters Outside of 2026 MRE Pit-shell; Mineralization Also Expanded Inside Pit-Shell With 5.00 g/t Oxide Au Over 3.0 Meters Within 1.23 g/t Oxide Au Over 27.4 Meters at Limo Butte, Nevada

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleased to announce additional oxide-gol... READ MORE

September 17, 2026

Nuvau Intersects 17.37 g/t over 2.40 m, Extending Gold Mineralization 50 Metres from High-Grade Thundermine Intercept

Nuvau Minerals Inc. (TSX-V: NMC) is pleased to report additional assay results from its 2026 summer... READ MORE

September 17, 2026

Copyright 2026 The Prospector News