The Prospector News

Tectonic Metals Drills 1.40 g/t Au Over 30.00 Metres, Including 4.58 g/t Au Over 4.50 Metres, Extending Higher-Grade Corridor to 300 Metres Vertical Depth at Chicken Mountain, Flat Gold Project, Alaska

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Tectonic Metals Drills 1.40 g/t Au Over 30.00 Metres, Including 4.58 g/t Au Over 4.50 Metres, Extending Higher-Grade Corridor to 300 Metres Vertical Depth at Chicken Mountain, Flat Gold Project, Alaska

 

 

 

Drilling Also Returns 0.51 g/t Au Over 118.16 Metres of Continuous Mineralization to End of Hole; Step-Out Drilling Expands Southern Mineralized Footprint by 200 Metres to 600 Metres

 

Assays Pending from 97 Drill Holes Representing 18,000 Metres of 2026 Drilling; Maiden Mineral Resource Estimate Targeted for Q1 2027

 

Tectonic Metals Inc. (TSX-V: TECT) (OTCQX: TETOF) announced the first assay results from its 2026 drill program at Chicken Mountain, the most advanced intrusion target at the Company’s flagship 99,840-acre Flat Gold Project in southwest Alaska, U.S. The results from 15 drill holes totalling 2,276 metres have expanded gold mineralization both at depth and to the south, further substantiating Chicken Mountain as a bulk-tonnage Reduced Intrusion Related Gold System, with potential for heap-leach processing.

 

Chicken Mountain is one of six district-scale intrusion targets currently identified at Flat and is being advanced toward a maiden Mineral Resource Estimate targeted for Q1 2027.

 

Key Drill Results & Geological Highlights1

 

The 2026 drill program at Flat has completed over 22,000 m year-to-date, with assay results from 15 holes totalling 2,276 m reported in this release. These results extend gold mineralization in two priority areas at Chicken Mountain: Central Corridor 2, one of six higher-grade corridors identified across 3.3 kilometres of drilled strike; and the southern extension of the near-surface mineralized footprint.

 

  • Central Corridor 2 Depth Extension to Over 300 m:
    • Diamond hole CMD26-036 returned 1.40 grams per tonne gold (“g/t Au”) over 30.00 m from 183.00 m, including 4.58 g/t Au over 4.50 m, and a separate deeper interval of 0.51 g/t Au over 118.16 m from 270.00 m to the end of the hole at 388.16 m, including 0.93 g/t Au over 19.50 m and 1.42 g/t Au over 7.50 m.
    • This area, defined as Central Corridor 2, was first described in Tectonic’s January 22, 2026 news release2 with CMD25-011, which intersected 0.69 g/t Au over 124.97 m, including 1.46 g/t Au over 26.00 m, across a corridor measuring approximately 200 m strike × 150 m width × 100 m depth.
    • CMD26-036 now confirms the continuation of this zone down to over 300 m vertical depth. Central Corridor 2 remains open in all directions.
  • Southern Mineralized Footprint Expanded by 200 m to 600 m in Length: Located 1.2 km south of CMD26-036, RC holes CMR26-141 and CMR26-142 expanded the drilled southern margin of Chicken Mountain by 200 m to the southwest, increasing its interpreted length in the southernmost tested area to approximately 600 m:
    • CMR26-141: 0.31 g/t Au over 25.91 m from 144.78 m, including 0.81 g/t Au over 4.57 m; hole ended in mineralization at 172.21 m.
    • CMR26-142 – southwestern step-out: 0.56 g/t Au over 38.10 m from 80.77 m, including 3.06 g/t Au over 4.57 m.
    • Together, these step-out holes confirm gold mineralization 200 m southwest of previous drilling and materially expand the drilled footprint in the southern portion of Chicken Mountain.
  • Higher-grade Interval Within Broader Mineralization: RC hole CMR26-128 located in the southern mineralized footprint returned 0.71 g/t Au over 22.86 m from 59.44 m, including 6.79 g/t Au over 1.52 m; hole ended in mineralization at 111.25 m.
  • Higher-Grade Corridor Characterization:
    • Currently, there are six higher-grade corridors identified within the broader mineralized envelope across the 3.3 km of drilled strike (see Figure 1). They range from 200 to 300 m in strike and up to 200 m in width, remaining open at depth. These corridors warrant further drilling (see Figure 4) and may have the potential to support future starter-pit opportunities.
    • Central Corridor 2 and the other higher-grade gold corridors are commonly associated with intense oxidization and/or sericite alteration, with a mineralized quartz and quartz-carbonate vein density of 1–3 veins per metre. These veins and alteration commonly host fine- to medium-grained arsenopyrite, pyrite and stibnite.
    • Tectonic is integrating oriented-core structural measurements with alteration, vein-density and multi-element geochemical data to refine the controls on higher-grade mineralization.
  • 100% Drill Success Rate Continues at Chicken Mountain:
    • All 206 holes drilled to date at Chicken Mountain have intersected gold mineralization, demonstrating the widespread distribution of gold across the system.
    • Of these holes, 127 (over 60%) ended in mineralization, providing numerous opportunities for follow-up drilling below current hole depths.
  • Chicken Mountain Growth Potential Still Remains Largely Untested:
    • Gold-in-soil anomaly, based on historical data, extends 4.0 km in length and up to 1.0 km in width.
    • Mapped monzonitic gold intrusive host rock complex measures approximately 4.5 km x 3.0 km, with a larger geophysical intrusive footprint of 6.5 km x 6.0 km.
    • More than 90% of the mapped intrusion complex remains untested by drilling.
    • The currently defined mineralized area (3.3 km strike x up to 700 m width x 300 m depth) remains open in all directions.
  • Near-Term Catalysts:
    • Substantial Assay Pipeline: Assays are pending for 97 additional drill holes currently in the laboratory queue, representing nearly 18,000 m of the 2026 drill program. The majority of these holes are targeting resource delineation and infill drilling in support of the maiden MRE.
    • Drilling Continues: Five drill rigs remain active at Flat and are expected to operate through the end of the field season in late October, supporting a steady flow of assay results through year-end.
    • Regional Surface Exploration: Results from the regional soil-sampling program are pending and will help refine and prioritize exploration targets beyond the current drilled footprint.
    • Heap Leach Column Testwork: Results are pending from column-leach tests evaluating multiple crush sizes, including material crushed to two inches.
    • Completion of the maiden MRE is targeted for Q1 2027.

 

Maps and Multimedia

 

 

 

 

Tony Reda, Co-Founder, President & CEO, commented:

 

“Drilling at Chicken Mountain continues to answer the questions that matter at this stage: does the mineralization continue at depth, does the footprint keep growing and can higher grades recur within the broader system? These first 2026 results provide encouraging evidence on all three fronts.

 

“Every one of the 206 holes reported to date at Chicken Mountain has intersected gold, and over 60% have ended in mineralization. We are combining disciplined resource-delineation drilling with structural interpretation, geochemistry, environmental baseline work and geotechnical studies to evaluate Chicken Mountain’s potential as a large-scale, open-pit, heap-leach gold opportunity while substantial exploration upside remains across Flat and its other intrusion targets.”

 

Figure 1: Simplified regional geology map of the Flat Gold Project and map of the Chicken Mountain intrusion drilling area, highlighting the six identified higher-grade corridors.

 

Chicken Mountain: In Pursuit of a Heap-Leachable Bulk-Tonnage Mining Opportunity

 

Chicken Mountain is interpreted as a RIRGS, hosted by a monzonitic intrusive complex. Gold mineralization occurs in sericite-altered and variably oxidized monzonite containing sheeted, millimetre- to centimetre-scale quartz to quartz-carbonate veinlets. Drilling has outlined a mineralized footprint extending 3.3 km along strike, up to 700 m wide and to 300 m vertical depth (see Figure 2). Mineralization remains open in all directions.

 

Tectonic is using oriented-core structural measurements, alteration and vein-density observations, and multi-element geochemistry to refine the geological model, define the controls on higher-grade mineralization and prioritize follow-up drilling. This integrated work is intended to improve confidence in the geometry and grade distribution of the broader mineralized envelope and its internal higher-grade corridors.

 

The 15 holes reported in this release represent 2,276 m of step-out and early-stage resource-delineation drilling at Chicken Mountain. Assays remain pending from 97 additional drill holes representing nearly 18,000 m of 2026 drilling. Results from regional soil sampling are also pending and will be used to refine targets beyond the current drilled footprint. Environmental baseline, geochemical and geotechnical programs are advancing in parallel as the Company works toward its maiden MRE targeted for Q1 2027.

 

Figure 2: Chicken Mountain plan view and long section showing the mineralized drill results, 3.3 km drilled strike extent and gold-in-soil anomalism.

 

 Figure 3: Chicken Mountain drill plan highlighting three of the six interpreted higher-grade corridors.

 

 Figure 4: Cross section L1-L1′, looking north, showing CMD26-036 and mineralization across a 500 m-wide section.

 

 

Table 1 – 2026 Chicken Mountain Diamond Drill Hole Assay Results

 

Hole ID   From (m) To (m) Length (m) Au (g/t)
CMD26-036   20.00 24.50 4.50 0.24
Total Depth = 388.16 m   35.00 39.50 4.50 0.52
End in Min: Yes          
    77.00 84.50 7.50 0.09
           
    89.00 90.50 1.50 0.59
           
    105.50 125.00 19.50 0.36
  including 108.50 119.00 10.50 0.53
           
    137.00 143.00 6.00 1.71
  including 141.50 143.00 1.50 4.25
           
    150.50 178.50 28.00 0.43
  including 150.50 152.00 1.50 2.41
  and including 177.00 178.50 1.50 1.85
           
    183.00 213.00 30.00 1.40
  including 183.00 187.50 4.50 4.58
  and including 193.50 202.50 9.00 1.77
           
    219.00 238.50 19.50 0.42
  including 219.00 223.50 4.50 1.49
           
    243.00 265.50 22.50 0.22
           
    270.00 388.16 118.16 0.51
  including 270.00 289.50 19.50 0.93
  with 273.00 288.00 15.00 1.03
  and including 306.00 319.50 13.50 0.43
  with 310.50 315.00 4.50 0.67
  and including 328.50 336.00 7.50 1.42
  with 328.50 331.50 3.00 2.79
  and including 357.00 388.16 31.16 0.56
  with 364.50 367.50 3.00 1.40
  and with 376.50 378.00 1.50 3.41

Note: All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-offs, with a maximum 3.2 m continuous (two sample) below the cut-off inclusion. 

 

 

Table 2 – 2026 Chicken Mountain RC Hole Assay Results

 

Hole ID   From (m) To (m) Length (m) Au (g/t)
CMR26-127   7.62 18.29 10.67 0.96
TD = 144.78 m including 7.62 9.14 1.52 5.89
End in Min: Yes          
    22.86 24.38 1.52 1.40
           
    32.00 67.06 35.05 0.24
  including 32.00 39.62 7.62 0.63
  with 32.00 33.53 1.52 2.28
           
    100.58 105.16 4.57 0.15
           
    117.35 126.49 9.14 0.54
  including 117.35 124.97 7.62 0.63
  with 117.35 118.87 1.52 2.26
           
    141.73 144.78 3.05 0.12
           
CMR26-128   9.14 13.72 4.57 0.10
TD = 111.25 m          
End in Min: Yes   18.29 24.38 6.10 0.16
           
    35.05 42.67 7.62 0.14
  including 41.15 42.67 1.52 0.45
           
    59.44 82.30 22.86 0.71
  and including 77.72 79.25 1.52 6.79
           
    89.92 111.25 21.34 0.14
           
CMR26-129   7.62 9.14 1.52 1.35
TD = 169.16 m          
End in Min: Yes   39.62 42.67 3.05 0.46
           
    85.34 94.49 9.14 0.15
           
    105.16 111.25 6.10 0.09
           
    123.44 131.06 7.62 0.18
           
    135.64 141.73 6.10 0.10
           
    166.12 169.16 3.05 0.68
  including 166.12 167.64 1.52 1.25
           
CMR26-130   9.14 13.72 4.57 0.39
TD = 147.83 m including 12.19 13.72 1.52 0.88
End in Min: Yes          
    36.58 41.15 4.57 0.30
           
    67.06 73.15 6.10 0.12
           
    79.25 83.82 4.57 0.15
           
    88.39 91.44 3.05 0.12
           
    106.68 109.73 3.05 0.13
           
    121.92 140.21 18.29 0.21
  including 123.44 129.54 6.10 0.41
           
CMR26-131   0.00 19.81 19.81 0.15
TD = 111.25 m including 9.14 10.67 1.52 0.56
End in Min: Yes          
    45.72 47.24 1.52 0.56
           
    70.10 73.15 3.05 0.24
           
    88.39 111.25 22.86 0.38
  including 88.39 102.11 13.72 0.43
  with 88.39 89.92 1.52 2.98
  including 108.20 111.25 3.05 0.53
           
CMR26-132   1.52 7.62 6.10 1.10
TD = 111.25 m including 3.05 7.62 4.57 1.41
End in Min: No          
    16.76 22.86 6.10 0.36
           
    28.96 44.20 15.24 0.18
  including 32.00 36.58 4.57 0.31
           
    60.96 67.06 6.10 0.21
  including 65.53 67.06 1.52 0.50
           
CMR26-133   4.57 6.10 1.52 0.38
TD = 164.59 m          
End in Min: Yes   18.29 19.81 1.52 0.42
           
    33.53 36.58 3.05 0.20
           
    70.10 77.72 7.62 0.15
           
    86.87 94.49 7.62 0.11
           
    106.68 112.78 6.10 0.24
           
    118.87 124.97 6.10 0.10
           
    129.54 158.50 28.96 0.17
           
CMR26-134   38.10 44.20 6.10 0.16
TD = 94.49 m          
End in Min: No   70.10 73.15 3.05 0.10
           
    80.77 85.34 4.57 0.08
           
    89.92 94.49 4.57 0.13
           
CMR26-135   25.91 28.96 3.05 0.12
TD = 128.02 m          
End in Min: Yes   38.10 51.82 13.72 0.10
           
    60.96 70.10 9.14 0.15
           
    99.06 106.68 7.62 0.15
           
    114.30 128.02 13.72 0.20
  including 120.40 121.92 1.52 0.87
           
CMR26-136   10.67 15.24 4.57 0.38
TD =1 21.92 m          
End in Min: No   65.53 88.39 22.86 0.19
  including 82.30 83.82 1.52 0.45
           
    92.96 120.40 27.43 0.20
  including 96.01 97.54 1.52 0.75
  and including 108.20 109.73 1.52 0.55
  and including 118.87 120.40 1.52 0.57
           
CMR26-137   0.00 9.14 9.14 0.13
TD = 149.35 m          
End in Min: No   39.62 99.06 59.44 0.16
  including 57.91 62.48 4.57 0.40
           
    105.16 114.30 9.14 0.41
  including 111.25 112.78 1.52 2.01
           
    132.59 135.64 3.05 0.66
           
    140.21 146.30 6.10 0.11
           
CMR26-138   3.05 16.76 13.72 0.10
TD = 118.87 m          
End in Min: Yes   21.34 27.43 6.10 0.25
  including 21.34 22.86 1.52 0.68
           
    36.58 60.96 24.38 0.14
  including 59.44 60.96 1.52 0.66
           
    67.06 79.25 12.19 0.21
  including 68.58 70.10 1.52 0.63
           
    85.34 102.11 16.76 0.20
  including 92.96 94.49 1.52 0.66
           
CMR26-141   35.05 39.62 4.57 0.18
TD = 172.21 m          
End in Min: Yes   48.77 50.29 1.52 0.55
           
    54.86 118.87 64.01 0.17
  including 83.82 85.34 1.52 0.86
           
    123.44 131.06 7.62 0.12
           
    137.16 140.21 3.05 0.42
           
    144.78 170.69 25.91 0.31
  including 152.40 156.97 4.57 0.81
  and including 163.07 166.12 3.05 0.66
           
CMR26-142   21.34 38.10 16.76 0.15
TD = 143.26 m including 27.43 33.53 6.10 0.23
End in Min: No          
    64.01 76.20 12.19 0.14
           
    80.77 118.87 38.10 0.56
  including 99.06 103.63 4.57 3.06

Note: All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-offs, with a maximum 3.2 m continuous (two sample) below the cut-off inclusion. 

 

Table 3 – Drill Hole Details at Chicken Mountain

 

Hole ID Type  Azimuth
(o) 
Dip
(o)
Length
(m)
UTM E  UTM N  Prospect Purpose 
CMD26-036 DDH 120 -55 388.16 552387 6917005 Chicken Mountain MRE
CMR26-127 RC 120 -55 144.78 552580 6916262 Chicken Mountain MRE
CMR26-128 RC 120 -75 111.25 552579 6916262 Chicken Mountain MRE
CMR26-129 RC 120 -55 169.16 552528 6916179 Chicken Mountain MRE
CMR26-130 RC 120 -75 147.83 552527 6916179 Chicken Mountain MRE
CMR26-131 RC 120 -55 111.25 552635 6916223 Chicken Mountain MRE
CMR26-132 RC 120 -75 111.25 552635 6916224 Chicken Mountain MRE
CMR26-133 RC 120 -55 164.59 552590 6916145 Chicken Mountain MRE
CMR26-134 RC 120 -75 94.49 552589 6916145 Chicken Mountain MRE
CMR26-135 RC 120 -55 128.02 552657 6916107 Chicken Mountain MRE
CMR26-136 RC 120 -75 121.92 552657 6916107 Chicken Mountain MRE
CMR26-137 RC 120 -55 149.35 552705 6916193 Chicken Mountain MRE
CMR26-138 RC 120 -75 118.87 552705 6916193 Chicken Mountain MRE
CMR26-141 RC 120 -55 172.21 552719 6916070 Chicken Mountain MRE
CMR26-142 RC 120 -75 143.26 552718 6916071 Chicken Mountain MRE

 

 

Qualified Person

 

Tectonic Metals’ disclosure of technical or scientific information in this press release has been reviewed, verified and approved by Peter Kleespies, M.Sc., P.Geo., Chief Geological Officer, who is a Qualified Person in accordance with Canadian regulatory requirements set out in National Instrument 43-101.

 

Analytical work for the 2026 Flat project drilling program was performed by ALS Global an internationally recognized and accredited laboratory independent of Tectonic. On-site, core and reverse circulation samples were sealed in security-tagged bags and shipped under strict chain-of-custody protocols to the Lynden Transport logistics operator in Anchorage, Alaska, for delivery to ALS facilities in Vancouver, British Columbia.

 

Upon arrival at the laboratory, samples were dried, crushed to 2 mm and riffle split into nominal 500-gram subsample aliquots (prep codes CRU-31, SPL-32a). One portion was analyzed for gold using PhotonAssay™ (ALS code Au-PA01). PhotonAssay™ uses high-energy X-rays to determine gold content from a large sample aliquot, typically 500 g of crushed material. The method is non-destructive and is particularly suited to gold systems where larger sample aliquots may improve representativity. If additional nominal 500-gram PhotonAssayTM analysis splits are conducted for a given sample, results from all splits are combined on a weight average basis. A second portion was pulverized such that 85% of the sample passed 75 µm, (PUL-31) and was analyzed by four-acid digestion with ICP-MS finish for 48 elements (ME-MS61), along with aqua regia digestion with ICP-MS finish for trace levels of mercury (Hg-MS42).

 

Quality assurance and quality control (QA/QC) protocols included the insertion of certified reference material every 20 samples, blank samples at rate of every 25 samples and field duplicate samples (split from the original 1.5 m for RC or 1.5 m for core intervals) every 25 samples. All QA/QC results returned values within acceptable limits.

 

About Tectonic Metals Inc.

 

Tectonic Metals Inc. is a mineral exploration company led by an experienced and well-respected technical and financial team with a track record of wealth creation for shareholders. The Company is focused on exploring and developing its flagship Flat Gold Project in southwestern Alaska, covering 99,840 acres of predominantly Native-owned land belonging to Doyon, Ltd., a leading Alaska Native Regional Corporation and one of Tectonic’s largest shareholders. The current focus is on advancing the Chicken Mountain target, one of six multi-kilometre-scale intrusion zones at the Flat Gold Project, where drilling has achieved a 100% success rate across 206 holes to date.

 

Founded by key members of the Kaminak Gold team behind the discovery and advancement of the Coffee Gold Project, which was acquired by Goldcorp for $520 million in 2016, Tectonic brings a proven track record in exploration, project advancement, capital markets and value creation. Collectively, the team has helped identify more than 30 million ounces of gold, advanced 18 projects through to feasibility, permitted 20 projects, completed over $3 billion in mergers and acquisitions and raised more than $2 billion in capital.

 

Tectonic’s mission is to be a shift in the game: working for our shareholders and the communities where we operate, putting people first, playing big and staying true to our word every step of the way.

 

Posted September 10, 2026

Share this news article

MORE or "UNCATEGORIZED"


Irruptive Metals Announces Closing of C$60 Million "Bought Deal" Private Placement

Irruptive Metals Corp. (TSXV: IRR) is pleased to announce that it has cl... READ MORE

September 10, 2026

Fathom Nickel Announces Maiden Mineral Resource Estimate, Gochager Lake Ni-Cu-Co Deposit, Saskatchewan

Highlights: Maiden Mineral Resource Estimate for the Gochager Lak... READ MORE

September 10, 2026

SAGA Metals Reports Assays from R-0064 to R-0071 with Intercepts Including 52.52% Fe2O3, 7.58% TiO2, 0.428% V2O5 from 2026 Drilling at Radar Critical Minerals Project in Labrador

SAGA Metals Corp. (TSX-V: SAGA) (OTCQX: SAGMF) (FSE: 20H), a Nor... READ MORE

September 10, 2026

Cabral Gold Announces First Gold Pour at Phase 1 Mine, Cuiú Cuiú Gold District, Brazil

Cabral Gold Inc.  (TSX-V: CBR) (OTCQX: CBGZF)  is pleased to a... READ MORE

September 10, 2026

Copyright 2026 The Prospector News