The Prospector News

Peruvian Metals on Track for Full Production for 2026 at the Aguila Norte Processing Plant and Reports Positive Sample Results from the Tailings Area

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Peruvian Metals on Track for Full Production for 2026 at the Aguila Norte Processing Plant and Reports Positive Sample Results from the Tailings Area

 

 

 

 

 

Peruvian Metals Corp. (TSX-V: PER) (OTC PINK: DUVNF) announces the completion of a major overall and maintenance program and the year-to-date production results for 2026 at its 80-per-cent-owned Aguila Norte processing plant located in Northern Peru.

 

During the months of July and August, the Plant processed a total of 6,046 metric tonnes (mt). The Plant has now achieved full production capacity for 28 of the previous 29 months. The Company is also pleased to note that the maintenance work performed on the ball mill and crushing circuit was completed during April through to July. Production was not affected and the Company continues to be on track to achieve another year of full capacity production. Since 2017, the Plant has processed 221,020 mt.

 

The Company is also pleased to announce that recent sample results from the tailings area show that there is gold and silver left in the tailings. Twenty samples were taken from a dry area within the tailings area and returned 2.4 grams gold (“Au”)/mt and 90 grams silver (“Ag”) /mt. At the current Au and Ag prices of $4400 US and $65 US per ounces respectively, this equates to 0.108 oz Au equivalent/mt. The gold results range from 1.34 to 3.93 grams Au/mt and silver ranging from 1.24 ounces Ag /mt to 4.37 ounces Ag/mt. Three to four kilograms were taken from several sites within an area of 1500 square metres. Material was taken from 20 to 80-centimetre hand dug pits. The sampling was supervised by Jeffrey Reeder, the CEO of the Company.

 

A composite sample was also collected within the sampled area for metallurgical test work. The head grade of the metallurgical sample assayed 1.76 grams Au/mt and 75 grams Ag/mt. Results confirmed the high recoveries of gold and silver at 93% and 87% respectively . The lead and zinc content is determined to be insignificant so that any future processing would only focus on recovering the gold-silver. The Company will need to modify its permit by designing an additional process for treatment of the tailings material. A detailed report will be prepared and submitted to the Peruvian Ministry of Mines during the 4th quarter.

 

Jeffrey Reeder, Chief Executive Officer of Peruvian Metals, comments: “We are on track for another year at full capacity production. The Company is currently preparing Palta Dorada and Mercedes for bulk sample extraction from the underground sites. The possibility of reprocessing the tailings at Aguila Norte adds another revenue stream, strengthening the financial position of the Company. ”

 

Qualified Person

Jeffrey Reeder, P. Geo., is the Qualified Person, as defined in National Instrument 43-101, who has reviewed and approved the technical contents of this release. The metallurgical work was performed by Jose Orlando Moncada Rejas, Ing, who is the chief metallurgist at the Aguila Norte plant. Assaying of the tailings material was performed by Procesmin Ingenieros SRL, located in Caraz Ancash, by fire assay for gold-silver.

 

About Peruvian Metals Corp.

Peruvian Metals Corp. is a Canadian exploration and mineral processing company. Our business model is to provide clients with toll milling services and produce high-grade marketable concentrates from mineral purchases. The Aguila Norte processing plant has an environmental permit (“IGAC”) from the Peruvian government which provides the Company with the ability to expand operations past the current 100 tonnes per day level. The Management and Directors have been operating successfully in Peru for over 30 years and the Company continues to acquire and develop precious and base metal properties in Peru. Peruvian Metals has a history of timely transactions that have added long term value for shareholders.

 

Posted September 8, 2026

Share this news article

MORE or "UNCATEGORIZED"


Sitka Drills 159.2 Metres of 1.14 g/t Gold, Including 7.3 Metres of 8.89 g/t Gold, Within 256.9 Metres of 0.84 g/t Gold, Intercepts 13.9 Metres of 0.383% WO3 (Tungsten Trioxide) and Continues to Expand the Rhosgobel Deposit Along Strike and at Depth at Its RC Gold Project, Yukon

New assay results extend gold and tungsten mineralization 350 m e... READ MORE

September 8, 2026

Talamore Reports High Grade Assays from Supremo Extension

Infill drilling, including hole 26-SPX-RC105 (12.24 g/t Au over 6... READ MORE

September 8, 2026

Brixton Metals Reports Consistent Silver Grades Across All 85 Holes from Maiden Tailings Drill Program at the Langis Silver Project

Brixton Metals Corporation (TSX-V: BBB) (OTCQX: BBBXF) is pleased... READ MORE

September 8, 2026

Revival Gold Completes 2026 Infill Drilling Program at Mercur Gold Project in Utah

Revival Gold Inc. (TSX-V: RVG) (OTCQX: RVLGF) is pleased to annou... READ MORE

September 8, 2026

Copyright 2026 The Prospector News