The Prospector News

Kobo Resources Extends Gold Mineralisation to the North at Kossou with Multiple High-Grade Drill Intercepts

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Kobo Resources Extends Gold Mineralisation to the North at Kossou with Multiple High-Grade Drill Intercepts

 

 

 

 

 

  • Drilling at the northern end of the Road Cut Zone continues to extend the Main Road Cut Shear, with mineralisation remaining open to the north and at depth
  • KDD0179 returned multiple high-grade intervals, including 5.0 m at 4.55 g/t Au, 6.0 m at 2.30 g/t Au and a separate 1.0 m interval at 68.60 g/t Au
  • More than 51,295 m of drilling completed at Kossou as the two-drill program continues to advance resource definition and exploration toward an inaugural MRE expected in Q4 2026

 

Kobo Resources Inc. (TSX-V: KRI) (FWB: Q1Z) is pleased to report diamond drill results from seven additional holes completed at its 100%-owned Kossou Gold Project in Côte d’Ivoire. Six holes completed at the northern end of the Road Cut Zone returned multiple zones of gold mineralisation within and adjacent to the Main Road Cut Shear, extending the mineralised system to the north and at depth where it remains open.

 

Diamond Drill Results – Highlights:

 

Road Cut Zone:

  • KDD0179
    • 1.0 metres (m”) at 68.60 g/t Au from 197.0 m
    • 5.0 m at 4.55 g/t Au from 214.0 m, including 1.0 m at 17.60 g/t Au
    • 6.0 m at 2.30 g/t Au from 223.0 m
  • KDD0177
    • 6.0 m at 0.93 g/t Au from 279.0 m
    • 4 .0 m at 4.26 g/t Au from 294.0 m
  • KDD0175
    • 7.0 m at 2.25 g/t Au from 166.0 m
    • 2.0 m at 6.50 g/t Au from 187.0 m
  • KDD0173
    • 2.0 m at 7.75 g/t Au from 55.0 m
    • 4.0 m at 2.50 g/t Au from 307.0 m

 

Edward Gosselin, CEO and Director of Kobo, commented: “One of our primary objectives at Kossou is to continue testing the boundaries of the mineralised systems we have identified at the project, and the northern end of the Road Cut Zone is giving us good reason to keep drilling. KDD0179 returned multiple strong gold intervals within and adjacent to the Main Road Cut Shear, while results from KDD0175 and KDD0177 provide further evidence that mineralisation continues across this northern portion of the system.”

 

He continued: “What is particularly encouraging is what these holes are telling us about where the Road Cut Zone can continue to grow. We are seeing strong gold mineralisation at the northern extent of our current drilling, with the Main Road Cut Shear remaining open to the north and at depth. That gives our exploration team a clear path for follow-up drilling as we work to better define the scale and continuity of this important part of the Kossou Gold Project.”

 

Northern Road Cut Zone Drilling Extends Main Shear Mineralisation at Depth

 

Diamond drill holes KDD0173 to KDD0177 and KDD0179 were completed across approximately 200 m of strike between sections RCZ050 and RCZ250 (Figure 1). The holes were designed primarily to test the Main Road Cut Shear and mineralisation associated with the Contact Zone Fault. All significant assay results are reported in Table 1.

 

Figure 1: Road Cut Zone Simplified Geology Map with Diamond Drill Hole Collars

 

 Drill hole KDD0179, completed on section RCZ050 (Figure 2), successfully intersected gold mineralisation approximately 150 m vertically below surface. The hole returned two significant intervals interpreted to be associated with the Main Road Cut Shear: 5.0 m at 4.55 g/t Au from 214.0 m, including 1.0 m at 17.60 g/t Au, and 6.0 m at 2.30 g/t Au from 223.0 m. These results extend mineralisation below KDD0065, which returned 7.0 m at 1.43 g/t Au and 4.0 m at 0.53 g/t Au, as previously reported on March 3, 2025. Mineralisation remains open to the north and at depth.

 

KDD0179 also intersected a separate narrow, high-grade interval of 1.0 m at 68.60 g/t Au from 197.0 m associated with V2 veining proximal to the principal shear zones.

 

Figure 2: Road Cut Zone Simplified Section – RCZ050

 

 

Drill holes KDD0175 and KDD0177 were completed on section RCZ100 to test the Main Road Cut Shear and Contact Zone Fault at depth (Figure 3). KDD0175 returned 7.0 m at 2.25 g/t Au from 166.0 m associated with V2 veins in unfoliated basalts adjacent to a quartz-feldspar porphyry intrusive and weak shearing. The hole also returned 2.0 m at 6.50 g/t Au from 187.0 m associated with V2 veins hosted in sheared volcanic rocks proximal to the Main Road Cut Shear.

 

KDD0177 intersected multiple zones of mineralisation associated with the Main Road Cut Shear, including 5.0 m at 0.70 g/t Au from 249.0 m, 7.0 m at 0.54 g/t Au from 257.0 m and 6.0 m at 0.93 g/t Au from 279.0 m, including 4.0 m at 1.29 g/t Au. A further interval of 4.0 m at 4.26 g/t Au from 294.0 m was associated with V2 veins in sheared basalts.

Mineralisation remains open at depth. KDD0175 also intersected 4.0 m at 0.58 g/t Au from 232.0 m along the Contact Zone Fault.

 

Figure 3: Road Cut Zone Simplified Section – RCZ100

 

 

Drill holes KDD0174 and KDD0176 were completed on section RCZ150 and intersected multiple zones of gold mineralisation associated with the Main Road Cut Shear (Figure 4). KDD0174 returned 3.0 m at 1.61 g/t Au from 98.0 m, 5.0 m at 1.23 g/t Au from 123.0 m and 2.0 m at 1.93 g/t Au from 137.0 m.

 

KDD0176 tested the system at depth and intersected several zones of gold mineralisation in the hanging wall of the Main Road Cut Shear, together with four mineralised intervals associated with shearing within the principal structure. Significant results included 12.0 m at 0.64 g/t Au from 270.0 m and 8.0 m at 1.33 g/t Au from 288.0 m. Neither hole intersected significant mineralisation associated with the Contact Zone Fault.

 

Figure 4: Road Cut Zone Simplified Section – RCZ150

 

 

Drill hole KDD0173 was completed on section RCZ250 (See Figure 5) and intersected multiple zones of gold mineralisation, including 5.0 m at 0.53 g/t Au from 233.0 m associated with the interpreted Main Road Cut Shear and 1.0 m at 3.01 g/t Au from 346.0 m along the Contact Zone Fault. Several additional mineralised intervals were intersected higher in the hole, predominantly associated with V2 veins hosted in weakly foliated or unfoliated basalts. The Main Road Cut Shear has now been tested to a vertical depth of approximately 125 m below surface on this section.

 

Additional mineralised intervals included 2.0 m at 7.75 g/t Au from 55.0 m and 4.0 m at 2.50 g/t Au from 307.0 m, associated with V2 veining outside the principal shear structure.

 

Figure 5: Road Cut Zone Simplified Section – RCZ250

 

 

Gold Mineralisation Extends Beyond Principal Shear Structures

 

Gold mineralisation at the Road Cut Zone is hosted in foliated and sheared basalts associated with V1 and V2 vein sets within the principal shear zones. Mineralised V2 vein sets also extend beyond these structures into unfoliated basalt host rocks and volcanosedimentary rocks along the Contact Zone Fault. Gold mineralisation has also been intersected in V2 vein sets hosted within and immediately adjacent to quartz-feldspar porphyry intrusive rocks.

 

Kossou Drilling Advances Resource Definition Ahead of Inaugural Mineral Resource Estimate

 

The Company continues an extensive two-drill exploration program at Kossou, where more than 14,000 m of drilling has now been completed across 54 holes to-date, bringing total drilling at Kossou to more than 51,295 m. Current drilling is focused on expanding and defining mineralisation across Kossou as the Company continues resource definition and exploration drilling toward an inaugural Mineral Resource Estimate expected in Q4 2026.

 

Table 1: Summary of Significant Diamond Drill Hole Results

 

BHID East North Elev. Az. Dip Length   From (m) To (m) Int. (m) Au g/t Target
KDD0173 228233 776467 294 70 -50 366   12.00 17.00 5.00 0.79 RCZ
                49.00 51.00 2.00 2.04 RCZ
                55.00 57.00 2.00 7.75 RCZ
                102.00 103.00 1.00 7.28* RCZ
                129.00 130.00 1.00 5.47* RCZ
                156.00 157.00 1.00 1.59* RCZ
                190.00 192.00 2.00 0.37 RCZ
                205.00 208.00 3.00 0.99 RCZ
                214.00 215.00 1.00 4.88* RCZ
                233.00 238.00 5.00 0.43 RCZ
                244.00 245.00 1.00 1.79* RCZ
                295.00 296.00 1.00 3.75* RCZ
                307.00 311.00 4.00 2.50 RCZ
                346.00 347.00 1.00 3.01* RCZ
KDD0174 228299 776577 272 70 -50 242   44.00 49.00 5.00 0.78 RCZ
                70.00 75.00 5.00 0.51 RCZ
                98.00 101.00 3.00 1.61 RCZ
                123.00 128.00 5.00 1.23 RCZ
                137.00 139.00 2.00 1.93 RCZ
KDD0175 228260 776616 288 70 -50 261   77.00 80.00 3.00 1.93 RCZ
                132.00 133.00 1.00 2.22* RCZ
                166.00 173.00 7.00 2.25 RCZ
                187.00 189.00 2.00 6.50 RCZ
                232.00 236.00 4.00 0.58 RCZ
              incl. 232.00 233.00 1.00 1.77 RCZ
KDD0176 228159 776526 295 70 -50 395   94.00 96.00 2.00 2.07 RCZ
                100.00 101.00 1.00 1.05* RCZ
                189.00 192.00 3.00 0.65 RCZ
                270.00 282.00 12.00 0.64 RCZ
                288.00 296.00 8.00 1.33 RCZ
              incl. 288.00 291.00 3.00 2.83 RCZ
                301.00 302.00 1.00 1.55* RCZ
                311.00 314.00 3.00 0.53 RCZ
KDD0177 228168 776582 287 70 -50 354   9.00 11.00 2.00 0.95 RCZ
                171.00 175.00 4.00 0.80 RCZ
                249.00 254.00 5.00 0.70 RCZ
                257.00 264.00 7.00 0.54 RCZ
                279.00 285.00 6.00 0.93 RCZ
              incl. 279.00 283.00 4.00 1.29 RCZ
                294.00 298.00 4.00 4.26 RCZ
              incl. 294.95 298.00 3.05 5.47 RCZ
KDD0178 228612 775680 291 70 -50 131   62.00 63.00 1.00 2.15* Kadie
KDD0179 228171 776637 280 70 -50 324   197.00 198.00 1.00 68.60* RCZ
                214.00 219.00 5.00 4.55 RCZ
              incl. 214.00 215.00 1.00 4.94 RCZ
              incl. 218.00 219.00 1.00 17.60 RCZ
                223.00 229.00 6.00 2.30 RCZ
              incl. 223.00 226.00 3.00 4.55 RCZ
                251.00 252.00 1.00 4.01* RCZ
Notes:

  • Cut-off grade of 0.30 g/t Au over a minimum interval of 2.0 m.
  • Intervals are reported with no more than 3.0 m of internal dilution grading less than 0.30 g/t Au, except where indicated with an asterisk (*).

 

An accurate dip and strike and controls of mineralisation are unconfirmed and mineralised zones are reported as downhole lengths. Drill holes are planned to intersect mineralised zones perpendicular to interpreted targets. All intercepts reported are downhole distances, true widths are unknown.

 

Sampling, QA/QC, and Analytical Procedures

 

Drill core was logged and sampled by Kobo personnel at site. Drill cores were sawn in half, with one half remaining in the core box and the other half secured into new plastic sample bags with sample number tickets. Core samples are drilled using HQ core barrels to below the level of oxidation and then reduced to NQ core barrels for the remainder of the bore hole. Samples are transported to the SGS Côte d’Ivoire facility in Yamoussoukro by Kobo personnel where the entire sample was prepared for analysis (prep code PRP86/PRP94). Sample splits of 50 grams were then analysed for gold using 50g Fire Assay as per SGS Geochem Method FAA505. QA/QC procedures for the drill program include insertion of a certificated standards every 20 samples, a blank every 20 samples and a duplicate sample every 20 samples. All QAQC control samples returned values within acceptable limits.

 

Review of Technical Information

 

The scientific and technical information in this press release has been reviewed and approved by Paul Sarjeant, P.Geo., who is a Qualified Persons as defined in National Instrument 43-101. Mr. Sarjeant is the President and Chief Operating Officer and Director of Kobo.

 

About Kobo Resources Inc.

 

Kobo Resources is a growth-focused gold exploration company with a compelling gold discovery in Côte d’Ivoire, one of West Africa’s most prolific gold districts, hosting several multi-million-ounce gold mines. The Company’s 100%-owned Kossou Gold Project is located approximately 20 km northwest of the capital city of Yamoussoukro and is directly adjacent to one of the region’s largest gold mines with established processing facilities.

 

With over 45,400 metres of diamond drilling, 5,887 metres of reverse circulation (RC) drilling, and 7,200+ metres of trenching completed since 2023, Kobo has made significant progress in defining the scale and prospectivity of its Kossou’s Gold Project. Exploration has focused on multiple high-priority targets within a 9+ km strike length of highly prospective gold-in-soil geochemical anomalies, with drilling confirming extensive mineralisation at the Jagger, Road Cut, and Kadie Zones. The latest phase of drilling has further refined structural controls on gold mineralisation, setting the stage for the next phase of systematic exploration and resource development.

 

Beyond Kossou, the Company is advancing exploration at its Kotobi Permit and is actively expanding its land position in Côte d’Ivoire with prospective ground, aligning with its strategic vision for long-term growth in-country. Kobo remains committed to identifying and developing new opportunities to enhance its exploration portfolio within highly prospective gold regions of West Africa. Kobo offers investors the exciting combination of high-quality gold prospects led by an experienced leadership team with in-country experience.

 

Posted September 3, 2026

Share this news article

MORE or "UNCATEGORIZED"


FireFly Completes Equity Raising

FireFly Metals Ltd (ASX: FFM) (TSX: FFM) is pleased to announce that it ... READ MORE

September 3, 2026

Precore Gold Closes Oversubscribed C$6 Million Private Placement

Precore Gold Corp. (CSE: PRCG) is pleased to announce the closing... READ MORE

September 3, 2026

Kenorland Minerals Reports Assay Results from Maiden Diamond Drill Program at the Western Wabigoon Project, Ontario

Kenorland Minerals Ltd. (TSX-V: KLD) (OTCQX: KLDCF) (FSE: 3WQ0) i... READ MORE

September 3, 2026

Cerrado Gold Closes $10 Million Strategic Private Placement with Eric Sprott

Cerrado Gold Inc. [TSX.V:CERT] [OTCQX:CRDOF] is pleased to announ... READ MORE

September 3, 2026

Copyright 2026 The Prospector News