The Prospector News

Thunder Gold Intersects 661.5 Metres of Continuous Gold Mineralization Averaging 0.554 g/t Au

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Thunder Gold Intersects 661.5 Metres of Continuous Gold Mineralization Averaging 0.554 g/t Au

 

 

 

 

 

Thunder Gold Corp. (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) is pleased to announce exploration diamond drill results from the Bench Target, at the Company’s flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario.

 

Highlights:

  • Longest continuously mineralized interval reported to date: 661.5 metres averaging 0.554 g/t Au;
  • Longest continuous interval greater than 1.0 g/t Au: 24.0 metres averaging 1.815 g/t Au;
  • Strong resource expansion relevance: 516.0 metres averaging 0.503 g/t Au inside 2026 Mineral Resource Estimate pit shell;
  • Mineralization extends below the current pit shell: 145.5 metres averaging 0.731 g/t Au immediately below MRE pit shell;
  • Hole TM26-210 ended in mineralization: Supports the interpreted sub-vertical continuity of the Bench target and indicates the alteration system remains open down-dip.

 

TM26-210 targeted the interpreted continuation of the 300+ metre wide, sub-vertical zone of brecciated and altered volcanic-intrusive rocks of the Bench Target. The hole followed the eastern edge of the current optimized pit constraining the 2026 MRE, along the 100-metre interpolation limit utilized to estimate inferred resources. The hole lies 100 metres below holes TM21-120 (399.0 metres averaging 0.458 g/t Au) and TM22-134 (318.0 metres averaging 0.452 g/t Au), both of which terminated prematurely in mineralization (Reference Figure 1.0). Elevated gold values were intersected 50 metres earlier than anticipated and continued 75 metres past the interpreted lower limit. The hole ended in mineralization suggesting potential to further increase the inferred resource at depth.

 

Wes Hanson, President and CEO, states, “TM26-210 was an across-the-board success, currently the best hole ever reported at Tower Mountain. The hole clearly demonstrates potential to increase resources immediately adjacent to the currently defined optimized pit constraining the 2026 MRE with the deepest portion of the hole returning broad, consistent mineralization greater than 1.0 g/t Au on a sustained basis with an absence of outlier values. It clearly supports the 100-metre search radius used for the 2026 MRE and demonstrates that there are immediate opportunities with, and immediately adjacent to the optimized pit to increase and reclassify the 2026 MRE. This hole clearly supports our assertion that drilling to date has failed to adequately define the limits of the alteration halo hosting mineralization. The results certainly support the sub-vertical continuity of the zone and demonstrate potential for additional discovery at depth.”

 

Mineralization occurs entirely within a sub-vertical, variably brecciated and altered sequence of intermediate volcanics and alkalic intrusives parallel to the central Tower Mountain Intrusive Complex. The brecciated sequence is cut by millimetre scale quartz-carbonate-tourmaline stockworks. Pyrite, ranging from trace to 5% (locally) is persistent throughout all observed lithologies except for late intermediate to mafic dikes, the only barren rocks observed to date.

 

Table 1.0 (below) shows the collar location data for hole TM26-210.

 

Table 1.0 – TM26-210 – Collar Location, Bearing and Dip

 

Easting Northing Elevation Bearing Dip Total Depth
300937 5377793 481 220 -55 750

 

 

Table 2.0 (below) summarizes the entirety of TM26-210 from the bedrock-overburden contact to the end of the hole which terminated in mineralization. Three (3) barren dikes were intersected within the mineralized zone at 129.0 metres (27.0 metres), 189.0 metres (7.5 metres) and 733.5 metres (12.0 metres), collectively representing 7% of the total interval length observed.

 

Four intervals returned average grades less than the 0.19 g/t cut-off grade used to define the 2026 MRE.

 

The bottom of the hole, under the current optimized pit limit used to report the 2026 MRE returned the longest, continuous interval greater than 1.0 g/t Au ever observed at Tower Mountain, clearly demonstrating opportunity to not only increase mineral resource but suggesting that the system may be strengthening with depth.

 

Approximately 516 metres of the reported 661.5 metre interval is within the current optimized pit shell defining the 2026 MRE.

 

Table 2.0 – Summary of Significant Results – TM26-210

 

 

Table 3.0 (below) presents the individual sample results for the entirety of TM26-210.

 

Table 3.0 – TM26-210 Interval Results

 

From To Au g/t From To Au g/t From To Au g/t
6 7.5 0.034 69 70.5 0.095 132 133.5 0.092
7.5 9 0.044 70.5 72 0.087 133.5 135 0.071
9 10.5 0.021 72 73.5 0.079 135 136.5 0.044
10.5 12 0.042 73.5 75 0.124 136.5 138 0.003
12 13.5 0.051 75 76.5 0.033 138 139.5 0.055
13.5 15 0.032 76.5 78 0.021 139.5 141 0.065
15 16.5 0.016 78 79.5 0.028 141 142.5 0.065
16.5 18 0.014 79.5 81 0.050 142.5 144 0.150
18 19.5 0.026 81 82.5 0.089 144 145.5 0.054
19.5 21 0.030 82.5 84 0.076 145.5 147 0.097
21 22.5 0.086 84 85.5 0.052 147 148.5 0.042
22.5 24 0.067 85.5 87 0.090 148.5 150 0.134
24 25.5 0.143 87 88.5 0.072 150 151.5 0.063
25.5 27 0.565 88.5 90 0.155 151.5 153 0.073
27 28.5 0.262 90 91.5 0.219 153 154.5 0.056
28.5 30 0.124 91.5 93 0.199 154.5 156 0.085
30 31.5 0.094 93 94.5 0.101 156 157.5 0.394
31.5 33 0.049 94.5 96 0.200 157.5 159 0.151
33 34.5 0.070 96 97.5 0.207 159 160.5 0.121
34.5 36 0.024 97.5 99 0.094 160.5 162 0.181
36 37.5 0.071 99 100.5 0.111 162 163.5 0.138
37.5 39 0.041 100.5 102 0.104 163.5 165 0.201
39 40.5 0.036 102 103.5 0.082 165 166.5 0.267
40.5 42 0.029 103.5 105 0.066 166.5 168 0.137
42 43.5 0.050 105 106.5 0.077 168 169.5 0.119
43.5 45 0.065 106.5 108 0.167 169.5 171 0.106
45 46.5 0.041 108 109.5 0.115 171 172.5 13.200
46.5 48 0.045 109.5 111 6.740 172.5 174 0.255
48 49.5 0.038 111 112.5 0.048 174 175.5 0.181
49.5 51 0.066 112.5 114 0.189 175.5 177 0.000
51 52.5 0.054 114 115.5 0.057 177 178.5 0.100
52.5 54 0.053 115.5 117 0.122 178.5 180 0.122
54 55.5 0.022 117 118.5 0.040 180 181.5 0.465
55.5 57 0.026 118.5 120 0.139 181.5 183 0.846
57 58.5 0.030 120 121.5 0.146 183 184.5 0.282
58.5 60 0.037 121.5 123 0.130 184.5 186 0.132
60 61.5 0.099 123 124.5 0.184 186 187.5 0.150
61.5 63 0.158 124.5 126 0.140 187.5 189 0.186
63 64.5 0.037 126 127.5 0.523 189 190.5 0.090
64.5 66 0.029 127.5 129 0.441 190.5 192 0.038
66 67.5 0.021 129 130.5 0.080 192 193.5 0.058
67.5 69 0.075 130.5 132 0.043 193.5 195 0.067
From To Au g/t From To Au g/t From To Au g/t
195 196.5 0.058 258 259.5 0.007 321 322.5 0.135
196.5 198 0.625 259.5 261 0.008 322.5 324 0.458
198 199.5 0.254 261 262.5 0.061 324 325.5 0.250
199.5 201 0.258 262.5 264 0.047 325.5 327 0.385
201 202.5 1.580 264 265.5 0.049 327 328.5 0.290
202.5 204 1.760 265.5 267 0.045 328.5 330 0.208
204 205.5 7.090 267 268.5 0.034 330 331.5 0.222
205.5 207 2.110 268.5 270 0.084 331.5 333 0.203
207 208.5 1.920 270 271.5 0.167 333 334.5 1.490
208.5 210 1.690 271.5 273 0.043 334.5 336 0.511
210 211.5 1.130 273 274.5 0.085 336 337.5 2.110
211.5 213 0.155 274.5 276 0.079 337.5 339 0.234
213 214.5 0.149 276 277.5 0.048 339 340.5 0.347
214.5 216 0.135 277.5 279 0.076 340.5 342 0.189
216 217.5 0.160 279 280.5 0.140 342 343.5 0.851
217.5 219 0.132 280.5 282 0.077 343.5 345 0.526
219 220.5 0.225 282 283.5 0.159 345 346.5 0.638
220.5 222 0.195 283.5 285 0.124 346.5 348 0.461
222 223.5 0.127 285 286.5 0.053 348 349.5 0.555
223.5 225 0.148 286.5 288 0.085 349.5 351 0.185
225 226.5 0.141 288 289.5 0.207 351 352.5 0.228
226.5 228 0.101 289.5 291 0.168 352.5 354 0.331
228 229.5 0.133 291 292.5 0.177 354 355.5 0.224
229.5 231 0.183 292.5 294 0.225 355.5 357 0.389
231 232.5 0.072 294 295.5 0.142 357 358.5 0.525
232.5 234 0.072 295.5 297 0.052 358.5 360 0.486
234 235.5 0.070 297 298.5 0.114 360 361.5 0.256
235.5 237 0.149 298.5 300 0.104 361.5 363 0.357
237 238.5 0.119 300 301.5 0.226 363 364.5 0.252
238.5 240 0.092 301.5 303 0.203 364.5 366 0.326
240 241.5 0.167 303 304.5 0.131 366 367.5 0.362
241.5 243 0.154 304.5 306 0.085 367.5 369 0.251
243 244.5 0.221 306 307.5 0.132 369 370.5 0.858
244.5 246 0.138 307.5 309 0.170 370.5 372 0.404
246 247.5 0.114 309 310.5 0.293 372 373.5 0.003
247.5 249 0.146 310.5 312 0.370 373.5 375 0.054
249 250.5 0.000 312 313.5 0.192 375 376.5 0.168
250.5 252 0.165 313.5 315 0.150 376.5 378 0.302
252 253.5 0.151 315 316.5 0.192 378 379.5 0.164
253.5 255 0.221 316.5 318 0.271 379.5 381 0.321
255 256.5 0.101 318 319.5 0.230 381 382.5 0.720
256.5 258 0.012 319.5 321 0.341 382.5 384 0.909
From To Au g/t From To Au g/t From To Au g/t
384 385.5 0.396 447 448.5 1.250 510 511.5 0.933
385.5 387 0.415 448.5 450 0.458 511.5 513 0.648
387 388.5 0.253 450 451.5 0.304 513 514.5 1.220
388.5 390 0.271 451.5 453 0.280 514.5 516 3.400
390 391.5 0.598 453 454.5 0.090 516 517.5 0.751
391.5 393 0.389 454.5 456 0.631 517.5 519 0.244
393 394.5 0.364 456 457.5 0.627 519 520.5 0.294
394.5 396 0.153 457.5 459 0.912 520.5 522 0.247
396 397.5 0.657 459 460.5 0.825 522 523.5 0.273
397.5 399 0.230 460.5 462 0.240 523.5 525 0.322
399 400.5 0.136 462 463.5 0.664 525 526.5 0.949
400.5 402 0.095 463.5 465 0.593 526.5 528 1.260
402 403.5 0.166 465 466.5 0.242 528 529.5 1.220
403.5 405 0.451 466.5 468 0.343 529.5 531 1.390
405 406.5 0.527 468 469.5 0.248 531 532.5 2.390
406.5 408 0.409 469.5 471 0.221 532.5 534 1.030
408 409.5 0.155 471 472.5 0.066 534 535.5 1.750
409.5 411 0.210 472.5 474 0.112 535.5 537 0.431
411 412.5 0.095 474 475.5 0.085 537 538.5 0.152
412.5 414 0.076 475.5 477 0.189 538.5 540 1.380
414 415.5 0.030 477 478.5 0.181 540 541.5 1.120
415.5 417 0.201 478.5 480 1.330 541.5 543 2.060
417 418.5 0.204 480 481.5 0.229 543 544.5 2.400
418.5 420 0.167 481.5 483 0.490 544.5 546 4.260
420 421.5 0.091 483 484.5 1.950 546 547.5 0.879
421.5 423 0.156 484.5 486 0.216 547.5 549 0.750
423 424.5 0.265 486 487.5 0.108 549 550.5 0.382
424.5 426 0.460 487.5 489 0.267 550.5 552 0.516
426 427.5 0.370 489 490.5 0.101 552 553.5 0.483
427.5 429 0.084 490.5 492 0.094 553.5 555 0.279
429 430.5 0.291 492 493.5 0.366 555 556.5 0.094
430.5 432 3.080 493.5 495 0.849 556.5 558 0.239
432 433.5 17.200 495 496.5 0.408 558 559.5 0.426
433.5 435 0.780 496.5 498 0.200 559.5 561 0.164
435 436.5 1.020 498 499.5 0.526 561 562.5 0.763
436.5 438 0.375 499.5 501 0.140 562.5 564 0.158
438 439.5 0.140 501 502.5 0.208 564 565.5 0.339
439.5 441 0.428 502.5 504 0.356 565.5 567 0.199
441 442.5 0.132 504 505.5 0.625 567 568.5 0.445
442.5 444 0.357 505.5 507 0.604 568.5 570 0.330
444 445.5 1.900 507 508.5 1.000 570 571.5 0.487
445.5 447 1.260 508.5 510 0.489 571.5 573 0.223
From To Au g/t From To Au g/t From To Au g/t
573 574.5 0.883 636 637.5 2.270 699 700.5 0.170
574.5 576 0.577 637.5 639 1.380 700.5 702 0.520
576 577.5 0.055 639 640.5 2.790 702 703.5 0.513
577.5 579 0.058 640.5 642 1.340 703.5 705 0.214
579 580.5 0.202 642 643.5 1.180 705 706.5 0.299
580.5 582 0.495 643.5 645 1.510 706.5 708 0.590
582 583.5 0.191 645 646.5 1.150 708 709.5 0.111
583.5 585 0.140 646.5 648 2.610 709.5 711 0.258
585 586.5 0.138 648 649.5 1.020 711 712.5 0.395
586.5 588 0.175 649.5 651 1.210 712.5 714 1.170
588 589.5 0.075 651 652.5 1.210 714 715.5 0.078
589.5 591 0.065 652.5 654 2.370 715.5 717 0.083
591 592.5 0.096 654 655.5 1.180 717 718.5 0.488
592.5 594 0.131 655.5 657 0.702 718.5 720 1.360
594 595.5 0.071 657 658.5 2.610 720 721.5 0.103
595.5 597 0.145 658.5 660 1.010 721.5 723 0.029
597 598.5 0.033 660 661.5 2.320 723 724.5 0.390
598.5 600 0.219 661.5 663 1.600 724.5 726 0.166
600 601.5 1.560 663 664.5 1.090 726 727.5 0.476
601.5 603 1.370 664.5 666 0.395 727.5 729 0.134
603 604.5 0.625 666 667.5 0.648 729 730.5 0.054
604.5 606 0.401 667.5 669 0.022 730.5 732 0.062
606 607.5 0.098 669 670.5 1.080 732 733.5 0.479
607.5 609 0.440 670.5 672 0.698 733.5 735 0.096
609 610.5 0.072 672 673.5 0.634 735 736.5 0.028
610.5 612 0.063 673.5 675 1.490 736.5 738 0.059
612 613.5 0.166 675 676.5 1.740 738 739.5 0.033
613.5 615 0.493 676.5 678 0.591 739.5 741 0.062
615 616.5 0.274 678 679.5 0.327 741 742.5 0.019
616.5 618 0.479 679.5 681 0.257 742.5 744 0.011
618 619.5 0.380 681 682.5 0.385 744 745.5 0.040
619.5 621 0.826 682.5 684 0.108 745.5 747 0.146
621 622.5 0.714 684 685.5 0.209 747 748.5 0.221
622.5 624 1.480 685.5 687 0.100 748.5 750 0.603
624 625.5 1.570 687 688.5 0.153
625.5 627 1.260 688.5 690 0.219
627 628.5 0.861 690 691.5 0.141
628.5 630 1.490 691.5 693 0.812
630 631.5 0.621 693 694.5 0.814
631.5 633 2.420 694.5 696 0.155
633 634.5 3.310 696 697.5 0.205
634.5 636 2.100 697.5 699 0.146

 

Figure 1.0 presents a sectional view of TM26-210 for reference.

 

 

Figure 1.0 – Diamond Drill Plan, UV Target, February to June 2026

 

Figures 2 through 4 are core photos of the 24.0 metre interval of continuous results greater than 1.0 g/t Au, the longest continuously mineralized interval greater than 1.0 g/t ever intersected at Tower Mountain in over 50,000 metres of drilling.

 

 

Figure 2.0 – TM26-210 624.8 metres to 642.1 metres

 

 

 Figure 3.0 – TM26-210 642.1 metres to 659.5 metres

 

 

 Figure 4.0 – TM26-210 659.5 metres to 677.3 metres

 

Quality Assurance and Quality Control

 

Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it is, photographed, logged for geotechnical, physical properties and geological data. Samples are identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically employed, varying only at major lithological contacts.

 

Certified standards and blanks are randomly inserted into the sample stream and constitute approximately 10% of the sample stream.  Certified standards and blank performance is monitored with any failures evaluated and investigated to determine if said failure is a result of error during submission. Any unexplained failures are identified and the five samples preceding and following the failure are re-assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The duplicate pulps are sent to a second independent analytical facility for analyses.

 

Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent analytical service provider.

 

AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent analytical facility.

 

Samples are, received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion (FA) with an atomic absorption (AAS) finish. All assay results greater than 5.0 g/t Au are re-assayed using a gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149 µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of each size fraction.

 

Qualified Person

 

Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo., President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established by NI 43-101.

 

About the Tower Mountain Gold Property

 

The 7,625-hectare, 100%-owned Tower Mountain Property is beside the Trans-Canada highway, 40-km west of Thunder Bay, Ontario (pop. 120,000). Gold mineralization occurs in variably brecciated and altered rocks surrounding the calc-alkalic Tower Mountain Intrusive Complex. Drilling to date has established an initial mineral resource parallel to the western contact of the intrusion. The remaining 75% of the contact demonstrates similar geology, alteration, and geophysical signatures and is untested by drilling. A second gold trend, identified in 2026, outcrops at surface and is continuously mineralized over a 100-metre width. This gold mineralization occurs within Timiskaming-type conglomerates that have been traced for over 5.0 kilometres along a southwest trend paralleling the Thunder Lake Fault. The Company believes both targets offer opportunities to materially increase the total resource through systematic drilling.

 

About Thunder Gold Corp.

 

Thunder Gold is advancing the Tower Mountain project in Thunder Bay, Ont. — an emerging gold system with the scale, consistency and quality to support a long-life, open-pit operation. Results from the disciplined drill programs have consistently reinforced confidence in the continuity and predictability of the discovery while highlighting significant potential for expansion across multiple zones of the Tower Mountain intrusive complex. With industry-leading drilling costs, existing infrastructure and a skilled local work force, Tower Mountain represents a rare combination of size, scalability and cost-effective growth.

 

At Thunder Gold, our vision is clear: to unlock a discovery that has the potential to become a transformational gold project, delivering long-term value for shareholders while contributing to the future of Canada’s mining industry.

 

Posted August 11, 2026

Share this news article

MORE or "UNCATEGORIZED"


Getty Drills 194m of 0.62% Copper from 27m at Getty North

Highlights: Resource confirmation drilling demonstrates strong ne... READ MORE

August 11, 2026

Legacy Gold Intersects 1.14 g/t Gold over 44.3ft (13.5m) from Surface, and Then 2.4 g/t over 26.9ft (8.2m), Incl. 6.6 g/t over 7.5ft (2.3m); Main Zone Extended 558ft (170m) West at Baner, Idaho

Legacy Gold Mines Ltd. (TSX-V: LEGY) is pleased to report assay r... READ MORE

August 11, 2026

1911 Gold Announces Mineral Resource Estimate Update for the Ogama-Rockland Gold Project

1911 Gold Corporation (TSX-V: AUMB) (OTCQX: AUMBF) (FRA: 2KY) is... READ MORE

August 11, 2026

Endurance Reports Encouraging Down Dip Extension of the Eagle Zone at Reliance

9.27 gpt Gold over 6.1 Metres including 19.40 gpt Gold over 1.0 M... READ MORE

August 11, 2026

Copyright 2026 The Prospector News