
Fortuna Mining Corp. (NYSE: FSM) (TSX: FVI) is pleased to announce that it has approved the expansion of its Séguéla Gold Mine in Côte d’Ivoire.
The project includes an expansion of the Séguéla processing facility, upgrades to supporting infrastructure, and development of the Sunbird underground mine. Together, these investments are expected to increase throughput, improve gold recoveries, accelerate production from Séguéla’s growing resource base, and reinforce the mine’s position as a cornerstone asset in Fortuna’s portfolio.
Expansion Highlights
Jorge A. Ganoza, President and CEO, commented, “Séguéla has consistently exceeded expectations since entering production in mid-2023 and continues to demonstrate strong growth potential. This expansion represents the logical next step in unlocking additional value from the asset by increasing processing capacity, integrating underground production, and enhancing operating flexibility. The project supports our strategy of disciplined reinvestment in high-quality assets and, along with the feasibility stage Diamba Sud project in Senegal, advances Fortuna’s objective of increasing consolidated annual gold rate of production toward 500,000 ounces by 2028.”
Project Overview
The Séguéla expansion is designed to increase processing capacity, improve gold recoveries, and support a higher long-term production profile by integrating the Sunbird underground mine with targeted upgrades to the processing plant and supporting infrastructure, including expanded camp facilities and enhancements to the power and water supply systems. Together, these investments are expected to enhance operational flexibility, strengthen cash flow generation, and provide a scalable platform for future growth at Séguéla.
The processing plant expansion will increase throughput from 1.75 Mtpa to approximately 2.3 Mtpa by leveraging existing infrastructure while adding capacity in key areas of the plant. This design is expected to optimize capital efficiency, reduce execution complexity, minimize disruption to ongoing operations during construction and tie-ins, and maintain operational flexibility while supporting future production growth.
Key elements of the processing plant expansion include:
Execution Timeline
Fortuna plans to advance the Séguéla expansion through a phased execution plan designed to minimize disruption to ongoing operations.
Key milestones include:
Qualified Person
Raul Espinoza, Director of Technical Services for Fortuna Mining Corp., is a Fellow and Chartered Professional of the Australasian Institute of Mining and Metallurgy (FAusIMM CP) and a Qualified Person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.
Mr. Espinoza has reviewed and approved the scientific and technical information contained in this news release and has verified the underlying data.
About Fortuna Mining Corp.
Fortuna Mining Corp. is a Canadian precious metals mining company with three operating mines and a portfolio of exploration projects in Argentina, Côte d’Ivoire, Guinea, Guyana, and Peru, as well as the Diamba Sud Gold Project in Senegal. Sustainability is at the core of our operations and stakeholder relationships. We produce gold and silver while creating long-term shared value through efficient production, environmental stewardship, and social responsibility.
Boreal Gold Inc. (CSE: BGLD) is pleased to announce 15.54 g/t over 2.... READ MORE
Purepoint Uranium Group Inc. (TSX-V: PTU) (OTCQB: PTUUF) reported... READ MORE
Grizzly Discoveries Inc. (TSX-V: GZD) (FSE: G6H) (OTCQB: GZDIF) i... READ MORE
Hole SH26-27 identifies approximately 15 metres (core length) of ... READ MORE
Critical Metals Mineralization Includes 2.40% Cu, 0.83% Ni and 0.... READ MORE