The Prospector News

Gold X2 Intersects 86.0m of 1.37 g/t Au from 314.0m at QES During Infill Drilling at the Moss Gold Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Gold X2 Intersects 86.0m of 1.37 g/t Au from 314.0m at QES During Infill Drilling at the Moss Gold Project


Gold X2 Mining Inc.
(TSX-V: AUXX) (OTCQB: GSHRF) (FSE: DF8) is pleased to announce the latest assays from its infill drilling program targeting the QES Zone at the Moss Gold Project in Northwest Ontario, Canada.

Michael Henrichsen, CEO and Director of Gold X2 commented: “These infill drill results demonstrate a meaningful expansion of the QES Zone relative to the current mineral resource estimate, through the expansion of the mineralized system by unmodelled secondary shear zones. In addition, we continue to encounter the emerging Superion Zone at shallow depths which we believe will lead to further expansion on the north side of the proposed open pit.”

 

 

 

Highlights

  • Eighteen holes, including four extensions to holes drilled in 2025, were drilled through the QES Zone to upgrade Inferred resources to the Indicated category within the current RPEEE open pit shell. Drilling continues to delineate a larger mineralized system than predicted by the Inferred resource with poorly mineralized wall rock zones excluded from the MRE converting to mineralized secondary shears. Best intercepts include:
    • 72.65m of 0.79 g/t Au from 513.0m in MQD-25-149, including
      • 34.0m of 1.14 g/t Au from 548.0m
    • 118.0m of 0.78 g/t Au from 366.0m in MQD-25-163, including
      • 6.8m of 4.18 g/t Au from 422.0m
    • 57.0m of 0.88 g/t Au from 266.0m in MQD-26-362, including
      • 24.5m of 1.41 g/t Au from 268.8m
    • 86.0m of 1.37 g/t Au from 314.0m in MQD-26-366, including
      • 26.0m of 2.90 g/t Au from 345.0m, including
        • 3.0m of 7.67 g/t Au from 349.0m, and
        • 6.0m of 5.82 g/t Au from 362.0m
    • 139.05m of 1.01 g/t Au from 355.95m in MQD-26-378, including
      • 39.35m of 1.78 g/t Au from 385.0m
    • 142.65m of 0.93 g/t Au from 394.05m in MQD-26-383, including
      • 46.0m of 1.59 g/t Au from 408.0m, including
        • 7.0m of 3.31 g/t Au from 413.0m
    • 90.0m of 0.96 g/t Au from 438.0m in MQD-26-390, including
      • 21.9m of 1.71 g/t Au from 444.0m
  • The fourteen new holes were collared north of the QES Zone and located additional mineralized Superion-style shears outside of the current mineral resource. Intercepts include:
    • 18.75m of 1.02 g/t Au from 259.25m in MQD-26-332
    • 27.7m of 1.85 g/t Au from 245.0m in MQD-26-366, including
      • 5m of 9.19 g/t Au from 250.0m,
    • 10.0m of 3.73 g/t Au from 80.0m in MQD-26-383, including
      • 4m of 8.5 g/t Au from 83.0m, including
        • 2.0m of 15.6 g/t Au from 85.0m

 

 


Technical Overview

The results of the holes drilled across the core shears in the upper part of the QES Zone are illustrated in the following figures and tables. Figure 1 shows the location map of the drill holes reported in this release. Figure 2 provides a typical cross-section through drill holes MQD-25-149, MQD-26-362 and MQD-26-366. The results are summarized in Tables 1 to 3, which include significant intercepts (Table 1), drill hole locations (Table 2) and the reconciliation between actual drill intercepts and those predicted by the current resource model (Table 3).

 


Figure 1: Shows the location of the drill holes across the core and marginal shears in the QES and Superion Zones

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/299720_dfccf3c214cbd9dc_002full.jpg

 


Figure 2: Shows a typical section through drill holes MQD-25-149, MQD-26-362 and MQD-26-366 with reported intersections relative to the current resource block model

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/299720_dfccf3c214cbd9dc_003full.jpg

 

 

Gold X2 has embarked on a deposit wide infill drilling program designed to upgrade Inferred resource blocks to Indicated within the RPEEE pit shell and further de-risk the Moss Gold Project. The initial program has focused on targeting the QES Zone, as this is best accessed in winter from muskeg-dominated areas north of the QES Zone. In addition, Gold X2 identified nine holes from its 2025 Superion exploration program to be extended through the core shears of the QES Zone to infill the drill spacing near the bottom of the RPEEE pit shell.

All fourteen new holes collared through overburden and encountered the expected wide epidote-chlorite altered diorite body north of the QES Zone with localized sericite-silica altered shearing, which increased in intensity and width downhole. These localised shears range from lower grade shears, such as 8.6m of 0.54 g/t from 63.45m in MQD-26-382, to high-grade Superion-style mineralization, such as 10.0m of 3.73 g/t Au from 80.0m, including 2.0m of 15.6 g/t Au from 85.0m in MQD-26-383.

Each hole, including the four extension holes, intersected the expected wide sericite-silica-hematite and sericite-chlorite altered sheared granodiorite in the QES Zone, with six holes being terminated within the granodiorite to avoid intersecting mineralization already tested from the south side. The remaining eight holes and four extension holes were extended through the granodiorite into the southern dacitic volcanic package.

This news release also includes a nineteenth hole drilled to test the eastern extension of the QES Zone that has been offset by the Sloane Fault. MQD-25-244 intersected low-grade shears typical of this area, including 21.0m @ 0.43 g/t Au from 258.0m.

Globally, the drill results from the eighteen holes infilling the MRE volume are showing 67% wider zones at an average 19% lower grade when compared to the current MRE. Intercepts of modelled mineralized shears are reconciling well. The additional volume reflects the discovery of secondary shears in zones previous modelled as wall rock and excluded from the MRE, as well as by the addition of marginal shears along the north side of QES not tested by the original southern collared drill programs. As these zones are not in the MRE, they have been modelled as low grade or waste. As such the grades intersected by these infill drill holes are higher grade than in the model despite having an overall average lower grade than the modelled shears. The net result is a significant replacement of waste with mineralization in the RPEEE pit shell.

 


Figure 3: Hole MQD-26-366: Strong to moderately sheared granodiorite with zones of sericite-hematite-silica dominated alteration yielding the high-grade intercept of 3.0m of 7.67 g/t Au from 349.0m and 6.0m of 5.82 g/t Au from 362.0m, part of the greater interval of 86.0m of 1.37 g/t Au from 314.0m.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8051/299720_dfccf3c214cbd9dc_004full.jpg

 

 


Table 1: Significant intercepts

HOLE ID FROM TO LENGTH
(m)
TRUE WIDTH
(m)
CUT GRADE
(g/t Au)
UNCUT GRADE
(g/t Au)
MQD-25-149 140.65 144.71 4.06 3.2 1.08 1.08 *
MQD-25-149 258.00 260.00 2.00 1.6 0.64 0.64
MQD-25-149 345.00 357.00 12.00 9.8 1.47 1.47
MQD-25-149 350.30 356.00 5.70 4.7 2.70 2.70
MQD-25-149 393.00 396.00 3.00 2.5 1.62 1.62
MQD-25-149 462.00 487.00 25.00 20.6 0.38 0.38
MQD-25-149 513.00 585.65 72.65 60.3 0.79 0.79
MQD-25-149 548.00 582.00 34.00 28.2 1.14 1.14
MQD-25-149 591.00 604.10 13.10 10.9 0.33 0.33
MQD-25-149 616.00 620.00 4.00 3.3 0.47 0.47
MQD-25-149 627.00 653.10 26.10 21.9 0.41 0.41
MQD-25-160 107.20 132.20 25.00 18.7 1.10 1.10 *
MQD-25-160 111.10 113.15 2.05 1.5 1.69 1.69 *
MQD-25-160 117.55 125.20 7.65 5.7 2.62 2.62 *
MQD-25-160 149.60 152.00 2.40 1.8 0.33 0.33
MQD-25-160 171.00 173.00 2.00 1.5 0.86 0.86
MQD-25-160 180.00 186.00 6.00 4.6 0.38 0.38
MQD-25-160 223.35 240.00 16.65 12.8 0.42 0.42
MQD-25-161 237.00 239.75 2.75 2.0 0.40 0.40
MQD-25-161 310.00 321.00 11.00 8.0 0.56 0.56
MQD-25-161 311.00 313.20 2.20 1.6 1.14 1.14
MQD-25-161 342.00 365.00 23.00 16.9 0.63 0.63
MQD-25-161 362.00 364.00 2.00 1.5 2.05 2.05
MQD-25-161 377.95 427.95 50.00 37.1 0.58 0.58
MQD-25-161 394.00 398.00 4.00 3.0 1.20 1.20
MQD-25-161 440.00 450.00 10.00 7.5 1.12 1.12
MQD-25-161 440.90 450.00 9.10 6.8 1.19 1.19
MQD-25-161 460.40 465.00 4.60 3.4 0.67 0.67
MQD-25-161 495.00 504.00 9.00 6.8 0.40 0.40
MQD-25-161 543.00 545.80 2.80 2.1 1.76 1.76
MQD-25-161 550.90 553.80 2.90 2.2 0.57 0.57
MQD-25-161 571.30 585.00 13.70 10.5 0.53 0.53
MQD-25-163 335.00 343.00 8.00 6.1 1.49 1.49
MQD-25-163 338.55 343.00 4.45 3.4 2.44 2.44
MQD-25-163 357.00 360.00 3.00 2.3 0.37 0.37
MQD-25-163 366.00 484.00 118.00 90.9 0.78 0.78
MQD-25-163 381.90 392.00 10.10 7.7 1.62 1.62
MQD-25-163 401.00 407.00 6.00 4.6 1.20 1.20
MQD-25-163 422.00 428.80 6.80 5.2 4.18 4.18
MQD-25-163 451.25 454.05 2.80 2.2 2.31 2.31
MQD-25-163 492.00 496.10 4.10 3.2 0.35 0.35
MQD-25-163 511.00 539.45 28.45 22.2 0.34 0.34
MQD-25-163 546.50 558.25 11.75 9.2 0.35 0.35
MQD-25-163 569.00 597.00 28.00 21.9 0.30 0.30
MQD-25-244 32.00 34.00 2.00 1.3 0.32 0.32
MQD-25-244 99.00 101.30 2.30 1.5 0.38 0.38
MQD-25-244 221.10 227.00 5.90 3.9 0.32 0.32
MQD-25-244 258.00 279.00 21.00 14.1 0.43 0.43
MQD-26-332 114.00 121.00 7.00 4.7 0.91 0.91
MQD-26-332 150.00 156.00 6.00 4.0 0.30 0.30
MQD-26-332 209.00 216.00 7.00 4.8 0.40 0.40
MQD-26-332 259.25 278.00 18.75 12.9 1.02 1.02
MQD-26-332 268.00 270.00 2.00 1.4 2.05 2.05
MQD-26-332 293.00 297.00 4.00 2.8 1.99 1.99
MQD-26-332 356.00 359.00 3.00 2.1 0.86 0.86
MQD-26-332 373.00 375.00 2.00 1.4 0.49 0.49
MQD-26-332 437.00 455.95 18.95 13.6 0.54 0.54
MQD-26-332 449.00 452.00 3.00 2.1 1.63 1.63
MQD-26-332 461.00 503.60 42.60 30.7 0.67 0.67
MQD-26-332 511.00 513.00 2.00 1.5 0.35 0.35
MQD-26-332 519.00 550.30 31.30 22.8 0.46 0.46
MQD-26-332 555.40 566.10 10.70 7.8 1.68 1.68
MQD-26-332 555.40 562.00 6.60 4.8 2.59 2.59
MQD-26-332 576.85 595.00 18.15 13.4 0.38 0.38
MQD-26-332 607.00 609.00 2.00 1.5 1.10 1.10
MQD-26-332 620.00 622.00 2.00 1.5 0.31 0.31
MQD-26-332 630.00 637.05 7.05 5.2 1.22 1.22
MQD-26-332 634.00 636.00 2.00 1.5 2.73 2.73
MQD-26-332 653.00 657.00 4.00 3.0 0.50 0.50
MQD-26-334 27.00 29.00 2.00 1.3 0.31 0.31
MQD-26-334 74.40 79.00 4.60 3.0 1.54 1.54
MQD-26-334 135.00 137.00 2.00 1.3 0.61 0.61
MQD-26-334 141.00 147.90 6.90 4.6 0.31 0.31
MQD-26-334 174.60 179.50 4.90 3.3 0.42 0.42
MQD-26-334 234.05 239.00 4.95 3.4 0.65 0.65
MQD-26-334 344.00 355.00 11.00 7.6 0.39 0.39
MQD-26-334 376.00 378.00 2.00 1.4 0.39 0.39
MQD-26-334 390.05 397.00 6.95 4.9 0.67 0.67
MQD-26-334 410.00 413.00 3.00 2.1 1.46 1.46
MQD-26-334 419.00 426.85 7.85 5.5 0.36 0.36
MQD-26-334 432.00 434.00 2.00 1.4 1.03 1.03
MQD-26-334 519.00 521.60 2.60 1.9 0.52 0.52
MQD-26-334 546.00 569.00 23.00 16.7 0.50 0.50
MQD-26-334 583.00 628.80 45.80 33.6 0.60 0.60
MQD-26-334 596.30 598.95 2.65 1.9 3.68 3.68
MQD-26-334 636.00 682.25 46.25 34.3 0.69 0.69
MQD-26-334 642.00 658.00 16.00 11.8 1.11 1.11
MQD-26-350 38.75 45.00 6.25 4.4 0.71 0.71
MQD-26-350 67.00 69.15 2.15 1.5 0.31 0.31
MQD-26-350 92.00 98.00 6.00 4.3 0.33 0.33
MQD-26-350 120.00 124.00 4.00 2.9 0.48 0.48
MQD-26-350 141.40 180.05 38.65 28.0 0.57 0.57
MQD-26-350 157.00 165.00 8.00 5.8 1.20 1.20
MQD-26-355 127.00 133.30 6.30 4.4 0.45 0.45
MQD-26-355 218.00 220.00 2.00 1.4 0.38 0.38
MQD-26-355 233.00 242.00 9.00 6.4 1.58 1.58
MQD-26-355 254.00 257.00 3.00 2.2 0.37 0.37
MQD-26-355 260.00 262.00 2.00 1.4 0.51 0.51
MQD-26-355 269.80 275.00 5.20 3.7 0.56 0.56
MQD-26-355 294.00 364.00 70.00 50.9 0.64 0.64
MQD-26-355 312.00 314.00 2.00 1.4 4.26 4.26
MQD-26-355 325.00 330.00 5.00 3.6 1.39 1.39
MQD-26-355 337.00 342.00 5.00 3.6 1.11 1.11
MQD-26-355 377.00 379.00 2.00 1.5 0.40 0.40
MQD-26-355 391.40 401.80 10.40 7.7 0.48 0.48
MQD-26-355 440.00 469.00 29.00 21.9 0.32 0.32
MQD-26-355 482.00 492.00 10.00 7.7 0.59 0.59
MQD-26-362 60.80 68.00 7.20 4.7 0.58 0.58
MQD-26-362 187.00 190.00 3.00 2.0 1.46 1.46
MQD-26-362 197.00 201.40 4.40 2.9 1.37 1.37
MQD-26-362 208.80 221.00 12.20 8.2 0.31 0.31
MQD-26-362 228.10 231.00 2.90 2.0 0.47 0.47
MQD-26-362 240.45 246.00 5.55 3.8 0.61 0.61
MQD-26-362 257.00 260.75 3.75 2.6 0.32 0.32
MQD-26-362 266.00 323.00 57.00 39.1 0.88 0.88
MQD-26-362 268.80 293.30 24.50 16.8 1.41 1.41
MQD-26-362 336.00 355.50 19.50 13.5 0.41 0.41
MQD-26-362 394.00 397.15 3.15 2.2 0.53 0.53
MQD-26-362 422.45 426.00 3.55 2.5 0.78 0.78
MQD-26-362 433.00 435.00 2.00 1.4 0.90 0.90
MQD-26-366 76.60 79.00 2.40 1.6 0.62 0.62
MQD-26-366 124.15 140.00 15.85 10.6 0.47 0.47
MQD-26-366 233.00 235.00 2.00 1.4 1.05 1.05
MQD-26-366 245.00 272.70 27.70 19.0 1.85 2.00
MQD-26-366 250.00 255.00 5.00 3.4 9.19 9.97
MQD-26-366 281.00 285.00 4.00 2.7 0.35 0.35
MQD-26-366 314.00 400.00 86.00 60.4 1.37 1.37
MQD-26-366 323.00 326.00 3.00 2.1 2.61 2.61
MQD-26-366 333.00 338.35 5.35 3.7 1.14 1.14
MQD-26-366 345.00 371.00 26.00 18.3 2.90 2.90
MQD-26-366 378.00 383.00 5.00 3.5 1.18 1.18
MQD-26-366 406.00 435.00 29.00 20.8 0.37 0.37
MQD-26-366 445.00 450.00 5.00 3.6 0.49 0.49
MQD-26-366 470.00 473.50 3.50 2.5 0.36 0.36
MQD-26-366 481.00 507.00 26.00 18.9 0.61 0.61
MQD-26-366 514.10 518.00 3.90 2.9 0.42 0.42
MQD-26-367 67.00 69.00 2.00 1.5 0.36 0.36
MQD-26-367 176.00 186.00 10.00 7.4 0.68 0.68
MQD-26-367 182.00 186.00 4.00 3.0 1.47 1.47
MQD-26-367 199.00 219.00 20.00 14.9 1.32 1.32
MQD-26-367 200.65 219.00 18.35 13.7 1.39 1.39
MQD-26-372 54.00 56.20 2.20 1.5 14.6 14.6
MQD-26-372 86.00 89.00 3.00 2.0 0.50 0.50
MQD-26-372 318.05 324.55 6.50 4.7 0.42 0.42
MQD-26-373 238.00 243.00 5.00 3.6 0.32 0.32
MQD-26-377 148.60 163.00 14.40 9.8 0.37 0.37
MQD-26-378 355.95 495.00 139.05 100.8 1.01 1.01
MQD-26-378 363.05 377.00 13.95 10.0 1.93 1.93
MQD-26-378 385.00 424.35 39.35 28.4 1.78 1.78
MQD-26-378 443.55 448.40 4.85 3.5 1.11 1.11
MQD-26-378 456.00 459.00 3.00 2.2 2.85 2.85
MQD-26-378 500.15 504.00 3.85 2.8 2.41 2.41
MQD-26-378 513.00 518.00 5.00 3.7 0.30 0.30
MQD-26-382 63.45 72.05 8.60 5.7 0.54 0.54
MQD-26-383 80.00 90.00 10.00 6.5 3.73 3.73
MQD-26-383 83.00 87.00 4.00 2.6 8.50 8.50
MQD-26-383 136.00 142.35 6.35 4.2 1.96 1.96
MQD-26-383 329.00 332.00 3.00 2.0 1.60 1.60
MQD-26-383 351.40 355.10 3.70 2.5 0.42 0.42
MQD-26-383 377.00 389.00 12.00 8.2 0.57 0.57
MQD-26-383 378.00 380.45 2.45 1.7 1.17 1.17
MQD-26-383 394.05 536.70 142.65 100.3 0.93 0.93
MQD-26-383 402.00 406.20 4.20 2.9 1.02 1.02
MQD-26-383 408.00 454.00 46.00 32.0 1.59 1.59
MQD-26-383 462.30 464.40 2.10 1.5 2.88 2.88
MQD-26-383 477.80 486.00 8.20 5.8 1.29 1.29
MQD-26-383 493.50 503.00 9.50 6.7 1.37 1.37
MQD-26-383 545.00 570.00 25.00 18.0 0.81 0.81
MQD-26-383 553.15 564.15 11.00 7.9 1.18 1.18
MQD-26-383 586.00 600.00 14.00 10.2 2.30 2.30
MQD-26-383 593.50 600.00 6.50 4.8 4.46 4.46
MQD-26-383 610.00 612.55 2.55 1.9 0.47 0.47
MQD-26-383 618.00 621.00 3.00 2.2 0.63 0.63
MQD-26-390 94.00 99.20 5.20 3.3 0.41 0.41
MQD-26-390 121.15 146.30 25.15 16.2 0.33 0.33
MQD-26-390 157.00 159.85 2.85 1.8 0.67 0.67
MQD-26-390 234.10 243.00 8.90 5.8 0.56 0.56
MQD-26-390 249.00 255.00 6.00 3.9 0.39 0.39
MQD-26-390 283.00 286.00 3.00 2.0 0.37 0.37
MQD-26-390 337.00 340.00 3.00 2.0 0.42 0.42
MQD-26-390 377.00 379.00 2.00 1.4 1.12 1.12
MQD-26-390 396.00 419.00 23.00 15.7 0.85 0.85
MQD-26-390 425.00 432.00 7.00 4.8 0.41 0.41
MQD-26-390 438.00 528.00 90.00 62.8 0.96 0.96
MQD-26-390 444.00 465.90 21.90 15.1 1.71 1.71
MQD-26-390 489.00 503.00 14.00 9.8 1.50 1.50
MQD-26-390 536.00 598.00 62.00 44.3 0.65 0.65
MQD-26-390 552.00 563.00 11.00 7.8 1.28 1.28
MQD-26-390 605.00 619.00 14.00 10.1 0.46 0.46
MQD-26-390 611.00 613.00 2.00 1.4 1.22 1.22

Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste interval of 5 metres. Shaded intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are approximate and assume a subvertical body.

* Intercepts from extended holes that have been previously reported

 

 


Table 2: Drill Collars

HOLE EAST  NORTH RL  AZIMUTH DIP EOH NOTES
MQD-25-149 670,016 5,380,050 428 158.2 -45.0 663.00 Extended from 251.95m
MQD-25-160 670,412 5,380,044 428 156.0 -45.0 240.00 Extended from 150m
MQD-25-161 670,353 5,380,089 428 154.0 -45.7 645.00 Extended from 234m
MQD-25-163 670,235 5,380,051 428 156.1 -46.7 639.00 Extended from 201m
MQD-25-244 670,895 5,379,862 429 321.6 -50.9 282.00
MQD-26-332 669,583 5,379,692 428 155.1 -50.0 657.00
MQD-26-334 669,604 5,379,794 431 155.0 -49.6 690.00
MQD-26-350 670,423 5,379,994 427 155.1 -46.8 180.05
MQD-26-355 670,267 5,379,979 428 155.0 -47.4 540.00
MQD-26-362 670,078 5,379,824 428 154.9 -49.4 480.00
MQD-26-366 670,057 5,379,873 428 155.2 -49.3 555.00
MQD-26-367 669,945 5,379,749 428 155.1 -49.6 219.00
MQD-26-372 669,985 5,379,909 428 155.1 -49.9 327.00
MQD-26-373 670,010 5,379,851 428 155.0 -49.9 252.00
MQD-26-377 670,003 5,379,758 428 156.5 -49.8 177.00
MQD-26-378 669,917 5,379,806 428 155.0 -49.7 525.00
MQD-26-382 669,881 5,379,776 428 155.1 -50.0 177.00
MQD-26-383 669,820 5,379,771 428 154.9 -51.4 621.00
MQD-26-390 669,776 5,379,770 428 155.2 -52.1 621.00

 

 

Table 3: Drill results versus expected results from the current resource model

HOLE ID MODEL LENGTH MODEL GRADE DRILL LENGTH DRILL GRADE
MQD-25-149 54.00 0.95 161.91 0.69
MQD-25-160 39.20 0.97 52.05 0.75
MQD-25-161 148.20 0.65 129.75 0.64
MQD-25-163 108.30 0.86 201.30 0.64
MQD-26-332 83.65 0.74 186.50 0.72
MQD-26-334 99.00 1.38 175.80 0.61
MQD-26-350 29.35 1.58 57.05 0.54
MQD-26-355 109.75 0.72 148.90 0.60
MQD-26-362 104.75 1.02 124.20 0.71
MQD-26-366 76.25 0.90 205.35 1.04
MQD-26-367 31.40 0.73 32.00 1.06
MQD-26-372 6.45 0.45 11.70 3.11
MQD-26-373 4.00 0.36 5.00 0.32
MQD-26-377 20.40 0.34 14.40 0.37
MQD-26-378 107.20 0.99 147.90 1.02
MQD-26-382 0.00 0.00 8.60 0.54
MQD-26-383 96.80 0.60 222.25 1.13
MQD-26-390 93.00 0.84 252.10 0.71

 

 

Analytical and QA/QC Procedures

The drill core is a mix of HQ and NQ diameter drill core has been visually validated in the core shack, rotated, and reconnected. Structural orientation data was captured by acoustical and optical televiewer operated by DGI Geosciences. All core has been sawed in half cut just off a geologist established cutline aligned 90° from the apex of the foliation, with the right half (looking down hole) of the core bagged and sent a third-party analytical laboratory. The left half of the core was returned to core boxes and is stored at Gold X2’s Kashabowie core yard facility.

All samples were sent to Paragon Geochemical in Timmins for sample preparation. Samples were analysed for gold via PhotonAssay™ by Paragon’s laboratory in Hamilton and then shipped to Activation Laboratories Ancaster for 60 pathfinder elements via ICP-MS after four-acid digestion. Paragon and ActLabs are accredited by the Standards Council of Canada for the Accreditation of Mineral Analysis Testing Laboratories and CAN-P-4E ISO/IEC 17025.

In addition to Paragon quality assurance / quality control protocols, Gold X2 has implemented a quality control program for all samples collected through the drilling program. The quality control program was designed by a qualified and independent third party, with a focus on the quality of analytical results for gold. Analytical results are received, imported to our secure on-line database and evaluated to meet our established guidelines to ensure that all sample batches pass industry best practice for analytical quality control. Certified reference materials are considered acceptable if values returned are within three standard deviations of the certified value reported by the manufacture of the material. In addition to the certified reference material, certified blank material is included in the sample stream to monitor contamination during sample preparation. Blank material results are assessed based on the returned gold result being less than ten times the quoted lower detection limit of the analytical method. The results of the on-going analytical quality control program are evaluated and reported to Gold X2 by Orix Geoscience Inc.

 

 


Qualified Person

Peter Flindell, PGeo, MAusIMM, MAIG, Chief Operating Officer, of the Company, and a qualified person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has approved the scientific and technical information contained in this news release.

Mr. Flindell has verified the data disclosed. To verify the information related to the winter drill program at the Moss Gold Project, Mr. Flindell has visited the property several times; discussed and reviewed logging, sampling, bulk density, core cutting and sample shipping processes with responsible site staff; discussed and reviewed assay and QA/QC results with responsible personnel; and reviewed supporting documentation, including drill hole location and orientation and significant assay interval calculations. He has also overseen the Company’s health and safety policies in the field to ensure full compliance, and consulted with the Project’s host indigenous communities on the planning and implementation of the drill program, particularly with respect to its impact on the environment and the Company’s remediation protocols.

 

 

About Gold X2 Mining

Gold X2 is a growth-oriented gold company focused on delivering long-term shareholder and stakeholder value through the acquisition and advancement of primary gold assets in tier-one jurisdictions. It is led by the ex-global head of structural geology for the world’s largest gold company and backed by one of Canada’s pre-eminent private equity firms. The Company’s current focus is the advanced stage 100% owned Moss Gold Project which is positioned in Ontario, Canada, with direct access from the Trans-Canada Highway, hydroelectric power near site, supportive local communities and skilled workforce. The Company has invested over $150 million of new capital and completed approximately 100,000 meters of drilling on the Moss Gold Project, which, in aggregate, has had over 300,000 meters of drilling. The 2026 updated NI 43-101 mineral resource estimate for the Moss and East Coldstream Deposits has expanded to 2.458 million ounces of Indicated gold resources at 1.04 g/t Au, contained within 73.8 million tonnes and 4.209 million ounces of Inferred gold resources at 0.97 g/t Au contained within 134.7 million tonnes. The Moss Deposit also has a silver MRE of 3.160 million ounces of indicated silver resources at 1.53 g/t Ag contained within 64.3 Mt and 6.273 million ounces of inferred silver resources at 1.55 g/t Ag contained within 125.9 Mt. Results of a preliminary economic assessment of the Moss Gold Project suggest the potential for the deposit to support a long-life mining operation with a strong production profile and low production costs. The MRE and PEA are supported by a NI 43-101 technical report for the Moss Gold Project available on the Company’s website and under the Company’s issuer profile on SEDAR+. For more information, please visit SEDAR+ (www.sedarplus.ca) and the Company’s website (www.goldx2.com).

 

 

For More Information – Please Contact:

Michael Henrichsen
President, Chief Executive Officer and Director
Gold X2 Mining Inc.

E: mhenrichsen@goldx2.com
W: www.goldx2.com
T: 1-604-404-4335

Posted June 2, 2026

Share this news article

MORE or "UNCATEGORIZED"


Emerita Intersects 7.2m Grading 1.0% Copper, 4.0% Lead, 7.5% Zinc, 0.13 g/t Gold and 83.32 g/t Silver at La Infanta Deposit; Deep Hole Extends the La Infanta Deposit Limits at Depth

Emerita Resources Corp. (TSX-V: EMO) (OTCQX: EMOTF) (FSE: LLJA) reports results from recent drilling... READ MORE

June 2, 2026

GreenLight Metals Intersects 27.72m of 1.07% Cu and 0.97 g/t Au (2.10% CuEq) including 15.65m of 1.66% Cu and 1.39 g/t Au (3.14% CuEq) at the Bend VMS Deposit in Wisconsin

GreenLight Metals Inc. (TSX-V: GRL) (OTCQB: GRLMF) is pleased to provide an update on the dri... READ MORE

June 2, 2026

Vior Gold Corporation Extends High Grade Mineralization at Depth

VIOR GOLD CORPORATION INC. (TSX-V: VIO) (OTCQB: VIORF) (FRA: VL5) is pleased to announce new results... READ MORE

June 2, 2026

Aya Gold & Silver Reports High-Grade Exploration Drill Results Near Pit Depth at Zgounder

Aya Gold & Silver Inc. (TSX: AYA) (NASDAQ: AYA) is pleased to announce high-grade silver ... READ MORE

June 2, 2026

Emperor Metals Confirms High-Grade Gold Mineralization Highlighted by 35.9 Meters Grading 3.1 g/t Au, Including 24.7 Meters of 4.0 g/t Au

Emperor Metals Inc. (CSE: AUOZ) (OTCQB: EMAUF) (FSE: 9NH) is pleased to report on the progress of i... READ MORE

June 2, 2026

Copyright 2026 The Prospector News