The Prospector News

Prospector Podcast – Kai Hoffmann: Junior Mining Correction: Gold Surge, ME Tensions & $2.6B Financings

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Prospector Podcast – Kai Hoffmann: Junior Mining Correction: Gold Surge, ME Tensions & $2.6B Financings

 

Join Michael Fox and Kai Hoffmann from SOAR Financial as they dive into the latest junior mining sector update amid gold and silver price swings, Middle East geopolitical tensions, and a resource market correction. Kai breaks down SOAR’s tracking of $2.6B in financings so far this year (down from January highs of $60-73M/week), the impact of Saudi/UAE investor pullback due to drone attacks on infrastructure, ongoing Saudi Arabia exploration by firms like Sun Peak Minerals, and why the mining bull market sentiment holds despite volatility. Don’t miss details on their Germany conferences, YouTube content, and free registration for the Deutsche Goldmesse in Frankfurt (May 15-16) featuring Doug Casey, First Majestic, and more—visit https://deutschegoldmesse.online/

Posted April 14, 2026

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News