The Prospector News

Robex Reports Kiniero Quarter 1 Production Update

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Robex Reports Kiniero Quarter 1 Production Update

 

 

 

 

 

Highlights

  • Kiniero Gold Mine, Guinea, milled 1.6M tonnes of ore at an average grade of 0.85g/t Au to produce 39,367oz Au in Q1 CY2026.
  • Cash and bullion increased to US$255 million (unaudited; with bullion comprising poured but unsold gold valued at a spot price of US$4,629/oz) at 31 March 2026.
  • Kiniero poured 38,178oz Au and sold/provisionally sold 32,306oz Au at an average price of US$4,804/oz in Q1.
  • A further 3,288oz Au was shipped on 2 April 2026 for estimated proceeds of US$15.2 million.
  • Kiniero operation continues to ramp up following achievement of commercial production in February 2026.
  • Nampala Gold Mine, Mali, milled 0.5M tonnes of ore at an average grade of 0.70g/t Au to produce 10,000oz Au in Q1 CY2026.
  • Nampala poured 10,874oz Au and sold/provisionally sold 9,493oz Au a t an average price of US$4,797/oz in Q1.

Figure 1: Robex Managing Director and CEO Matthew Wilcox with gold bars produced at Kiniero during Q1

 

Robex Resources Inc. is pleased to provide an update on Q1 CY2026 gold production at its Kiniero Gold Mine in Guinea, following the commencement of commercial production in February 2026 (ASX announcement 12 February 2026).

 

Robex produced 39,367oz Au and poured 38,178oz Au at Kiniero in Q1 CY2026 as the operation continues to ramp up. During the quarter, 32,306oz Au were sold and provisionally sold at an average realised price of US$4,804/oz.

 

Subsequent to quarter end, a further 3,288oz Au was shipped on 2 April 2026 for estimated proceeds of US$15.2 million.

 

Cash and bullion holdings increased to US$255 million (unaudited, with bullion comprising poured but unsold gold valued using a gold spot price of US$4,629/oz) as at 31 March 2026.

 

Robex will provide a comprehensive update of operations and exploration activities in its March 2026 quarterly report to be released later this month.

Posted April 7, 2026

Share this news article

MORE or "UNCATEGORIZED"


Blue Jay Gold Corp. Announces Closing of Brokered Private Placement of Subscription Receipts for Proceeds of Approximately $14.7 Million

Blue Jay Gold Corp. is pleased to announce that it has closed its... READ MORE

April 8, 2026

Opus One Gold Corp Releases the First Assay Results from Its Winter Drilling Program on Noyell

Opus One Gold Corp (TSX-V: OOR) is pleased to announce the first... READ MORE

April 8, 2026

DPM Metals Announces First Quarter 2026 Preliminary Production Results; Ramp-up of Vareš Proceeding Well

DPM Metals Inc. (TSX: DPM) (ASX: DPM) (ARBN: 689370894) is please... READ MORE

April 8, 2026

Pecoy Copper Intersects 1,020.50 m of 0.43% Cu and 0.09 g/t Au from 48 m in Follow-Up Hole, a Second Consecutive Kilometre-Scale Intercept within South Breccia

Pecoy Copper Corp. (TSX-V: PCU) (FSE: D5E) (OTCQB: PCUUF) is plea... READ MORE

April 8, 2026

Rio Silver Inc. Reports: Initial Silver – Gold - Lead Recoveries of 85 %, 74 % and 77% Respectively From the Maria Norte in Central Peru

Initial Test Work Demonstrates Good Silver Recovery, High Grade C... READ MORE

April 8, 2026

Copyright 2026 The Prospector News