Intersection includes 23.9m of 1.72 g/t gold, 7.15m of 3.46 g/t gold, and 16m of 0.07 g/t gold*
Exploration further expands gold mineralization at Juby Gold Project on Golden Lake Deposit
McFarlane Lake Mining Limited (CSE: MLM) (OTC: MLMLF) (FRA: W2Z) is pleased to announce further results from its diamond drilling exploration campaign being conducted on its 100%-owned Juby Gold Project, located west of Gowganda, Ontario, within the southern part of the “Abitibi Greenstone Belt”. Drilling was initiated in December 2025 on the property and commenced at the Company’s 826 Zone and has now moved to the Golden Lake Zone, see Figure 1.
Highlights
“Not only does today’s announcement help support expanded gold mineralization at Juby, what we are seeing in further drilling along strike (Drill hole GL 76-73A and 76-74) is extremely encouraging. Drilling at our Golden Lake deposit i s surpassing expectations. Our team is excited to be developing what is evolving into a world-class deposit”, said Mark Trevisiol, CEO and Chairman of McFarlane.
A second diamond drill arrived at site on March 9, 2026 and recently completed hole GL 76-74 and has now moved on to drill GL 76-75. Originally, 14 diamond drill holes were planned; with the feedback received from the drilling to date, McFarlane will increase drilling at Golden Lake by at least 1,000 to 1,500m. One of the two diamond drills will transfer to the Juby deposit within the next 4 to 6 weeks, where approximately 4,000 to 5,000 meters are planned. See Figure 3 for the exploration plan at Juby.
Drilling being conducted at site is contracted through two separate firms, each having a business partnership with 2 of the 3 First Nation communities that have territorial rights on the property. There are three First Nation communities recognized as having territorial rights within the Juby Gold project, they include Matachewan First Nation, Temagami First Nation and Atikameksheng Anishnawbek First Nation.
Figure 1 – Juby Gold Project – Plan View of Exploration Drilling program showing location of drill holes at Golden Lake, Juby and 826 Zones
Figure 2 – Golden Lake Deposit Intersection – section looking northwest
Table 1 – Golden Lake Collar Information
| Area | Hole-ID | Azimuth | Dip | Easting | Northing | Elevation | Length (m) |
| Golden Lake | GL76-71 | 40 | -55 | 500314 | 5272450 | 365 | 602 |
| GL76-72 | 43 | -58 | 500357 | 5272359 | 365 | 692.5 |
*Table 2 – Golden Lake Zone intercepts
| Area | Hole-ID | From (m) |
To (m) |
Au gpt | Width (m) |
True width (m) |
Depth (m) |
| GL76-71 | 111.00 | 113.00 | 1.03 | 2.00 | 1.5 | 85.8 | |
| Golden Lake |
185.50 | 190.00 | 0.47 | 4.50 | 3.5 | 145.6 | |
| 298.10 | 300.20 | 0.22 | 2.10 | 232.1 | |||
| GL76-71 | 307.85 | 353.00 | 0.74 | 45.15 | 36.0 | -260.1 | |
| Including | 315.55 | 323.00 | 1.44 | 7.45 | |||
| Golden Lake |
371.00 | 466.40 | 1.36 | 95.40 | 75.6 | -331.9 | |
| Previously | Including | 383.60 | 439.00 | 1.96 | 55.40 | ||
| Reported | Including | 410.10 | 420.00 | 3.22 | 9.90 | ||
| 489.35 | 516.05 | 0.68 | 26.70 | 21.6 | -389.4 | ||
| Including | 489.35 | 494.20 | 2.01 | 4.95 | < td style=”border-right: solid black 1pt ; text-align: center ; vertical-align: middle; vertical-align: bottom ; “> | ||
| GL76-72 | 83.00 | 86.00 | 0.43 | 3.00 | 2.2 | 66.3 | |
| 133.00 | 136.00 | 0.30 | 3.00 | 2.2 | 108.3 | ||
| 176.00 | 182.75 | 0.35 | 6.75 | 4.9 | 145.8 | ||
| 197.00 | 201.50 | 0.63 | 4.50 | 3.3 | 162.4 | ||
| 225.70 | 228.00 | 0.35 | 2.30 | 1.7 | 185.3 | ||
| Golden Lake | 239.00 | 244.00 | 0.39 | 5.00 | 3.7 | 197.5 | |
| 264.00 | 267.00 | 0.37 | 3.00 | 2.2 | 217.3 | ||
| 276.00 | 284.00 | 0.43 | 8.00 | 5.7 | 229.2 | ||
| 305.30 | 312.00 | 0.69 | 6.70 | 4.9 | 252.5 | ||
| 326.00 | 328.00 | 0.54 | 2.00 | 1.5 | 267.4 | ||
| 398.00 | 405.00 | 0.84 | 7.00 | 5.1 | 327.0 | ||
| 411.00 | 414.00 | 0.38 | 3.00 | 2.2 | 340.6 | ||
| 464.00 | 466.00 | 0.46 | 2.00 | 1.5 | 381.4 | ||
| 485.30 | 577.90 | 0.95 | 92.60 | 67.9 | 432.2 | ||
| Including
485.30 |
537.60 | 0.88 | 52.30 | 38.4 | 417.0 | ||
| Including | 525.35 | 529.00 | 3.48 | 3.65 | 2.7 | ||
| Including | 537.60 | 554.00 | 0.07 | 16.40 | 12.0 | ||
| Including | 554.00 | 577.90 | 1.72 | 23.90 | 17.5 | 458.1 | |
| Including | 559.40 | 563.00 | 2.69 | 3.60 | 2.6 | ||
| Including | 568.85 | 576.00 | 3.46 | 7.15 | 5.2 | ||
| 606.00 | 608.80 | 0.28 | 2.80 | 2.1 | 489.2 | ||
| 662.20 | 663.25 | 13.35 | 1.05 | 0.8 | 530.3 |
Figure 3 shows the area of planned drilling on the Golden Lake and Juby deposits in the upcoming weeks.
Figure 3 – Planned area of exploration for Golden Lake and Juby Resource areas
Quality Assurance and Quality Control
The drill core samples collected by McFarlane Lake Mining and described in this news release were placed in core boxes by the drill cr ew contracted by the Company. Core was then transported by McFarlane personnel to a secure processing facility. The core is then reviewed with core metreage blocks checked to verify core integrity, geologically logged, and samples marked. Core samples are cut in half, with one half remaining in the box and the other inserted into a clean plastic bag with a sample tag. Certified reference materials are inserted into the sample stream at a rate of no less than 10%. Samples are then transported in secure sealed bags with security tags for preparation and assay by MSA Labs in Timmins, Ontario, a certified lab with AC89, IAS accreditation and compliance with ISO/IEC standard 17025:2017.
Samples reported are crushed at the lab in their entirety to 70% passing 2 mm, with one 300 to 500 g subsample split and placed into a jar for analysis by photon assay. Gold concentration results are then recorded with reference to each sample tag number.
About McFarlane Lake Mining Limited
McFarlane Lake Mining Limited is a Canadian gold exploration company focused on advancing its flagship Juby Gold Project, located near Gowganda, Ontario, within the established Abitibi Greenstone Belt. The Juby Gold Project hosts a current (effective September 29, 2025) NI 43-101 compliant Mineral Resource Estimate of 1.01 million ounces of gold in the Indicated category at an average grade of 0.98 g/t gold (31.74 million tonnes) and an additional 3.17 million ounces of gold in the Inferred category at an average grade of 0.89 g/t gold (109.48 million tonnes). The estimate was calculated using a long-term gold price of US$2,500 per ounce, applying cut-off grades of 0.25 g/t gold for open pit and 1.85 g/t gold for underground resources.
A sensitivity analysis completed at a higher gold price of US$3,750 per ounce resulted in an Indicated Mineral Resource of 1.20 million ounces grading 0.94 g/t gold (39.51 million tonnes) and an Inferred Mineral Resource of 4.23 million ounces grading 0.85 g/t gold (154.50 million tonnes) applying cut-off grades of 0.25 g/t gold for open pit and 1.15 g/t gold for underground resources.
The independent MRE was prepared by BBA E&C Inc. in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The full technical report supporting the resource estimate was filed on SEDAR+ on November 21, 2025, and is also available on the Company’s website www.mcfarlanelakemining.com.
McFarlane is actively executing an exploration drilling program as detailed herein, and additional te chnical studies at the Juby Project to further evaluate and advance this large-scale gold system.
Delta Resources Limited (TSX-V: DLTA) (OTC Pink: DTARF) (FRANKFUR... READ MORE
Equinox Gold Corp. (TSX: EQX) (NYSE: EQX) is pleased to report r... READ MORE
Cascadia Minerals Ltd. (TSX-V: CAM) (OTCQB: CAMNF) is pleased to ... READ MORE
HIGHLIGHTS: 174,000 meters of exploration and grade control dri... READ MORE