The Prospector News

Omineca Provides Operational Update of Placer Gold Recovery at Wingdam

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Omineca Provides Operational Update of Placer Gold Recovery at Wingdam

 

 

 

 

 

Omineca Mining and Metals Ltd. (TSX-V: OMM) is pleased to provide an operational update from the Wingdam underground paleoplacer project located in the Cariboo Mining District of south central British Columbia. The Company’s mining contractor, D&L Mining reports:

 

Following the year-end holiday break, tunnelling and placer recovery operations have recommenced at crosscut 3A. Additional time was given to tunnelling through a fault zone at the channel periphery. Modified grout formulations and spiling patterns were successfully implemented allowing operations to return to standard tunnelling and excavation procedures. Having safely managed the faulted ground conditions, D&L anticipates the tunnelling, and excavation will now proceed at an increased pace within the more competent compacted sand and gravel of the channel interior.

 

As expected, pay gravels excavated from the initial advance into the channel interior have yielded increasing amounts of placer gold and nuggets compared to the earlier bedrock contact zone (see news release dated December 5, 2025 and photos below).

 

Placer gold recoveries will be fully tabulated, subject to quality assurance and quality control by a Qualified Person and reported as the crosscut makes its way through the central main placer gold target and through to the opposite side of the channel.

 

Exploration Program:

Separate from the underground placer project, approximately 3,500 meters of core from 6 holes drilled during the 2025 winter drill program has been logged, split and samples sent in for assay. Results will be reported once they are received with a drill program to be designed to follow up on these results.

 

Photos

(more pictures and videos available here: More Videos and Photos Link)

 

Brokk Electric Demolition Robot – pictured here fitted with a drum cutter head, cutting into the crosscut face. (video available on website link above)

 

 

Scooptram – mucking gravels from the face after Brokk cutting (videos available on website link above)

 

 

Washplant Screen and Carpet – placer gold first caught after trommel and before boil boxes, some larger gold nuggets

 

 

Gold Recovered on Shaker Table – placer gold close-up in sample tube

 

 

Qualified Person

 

All scientific and technical information in this news release has been prepared by, or approved by Stephen Kocsis, P.Geo. Mr. Kocsis is an independent qualified person for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

About Omineca Mining and Metals Ltd.

 

Omineca Mining and Metals Ltd.’s flagship Wingdam gold exploration and placer recovery projects are located along the Barkerville Highway 45 km east of the City of Quesnel. The Wingdam Property includes mineral tenures totaling over 61,392 hectares (613 square kms) and in excess of 15 linear kilometers of placer claims, both encompassing the Lightning Creek valley where topographic conditions created thick layers of overburden, which preserved a large portion of a buried paleochannel containing placer gold-bearing gravels. Omineca also has an exploration and diamond drill program currently underway exploring for the potential multiple hard rock sources of the placer gold at Wingdam

Posted February 19, 2026

Share this news article

MORE or "UNCATEGORIZED"


Sable Reports Drill Results Extending the Pyros Cu–Au–Mo Porphyry System, San Juan, Argentina

Sable Resources Ltd. (TSX-V: SAE) (OTCQB: SBLRF) is pleased to report positive results from its most... READ MORE

April 13, 2026

New Drilling Intersects 136 metres of 0.67 g/t Gold

McFarlane Lake Mining Limited (CSE: MLM) (OTC: MLMLF) (FRA: W2Z) is pleased to announce furth... READ MORE

April 13, 2026

EIFO, Denmark's Export Credit Agency, Issues Letter of Intent for a Guarantee of up to EUR 170 Million for the First Phosphate Igneous Phosphate Mining Project

First Phosphate Corp. (CSE: PHOS) (OTCQX: FRSPF) (OTCQX ADR: FPHOY) (FSE: KD0) is pleased to ... READ MORE

April 13, 2026

Minera Alamos Reports First Quarter 2026 Gold Production of 8,734 Ounces; Cash Balance Increased to $46 Million

Minera Alamos Inc. (TSX-V: MAI) (OTCQX: MAIFF) is pleased to announce preliminary operational... READ MORE

April 13, 2026

Gold X2 QES Drilling Intercepts 100.75m of 1.50 g/t Au from 495m Including 14m of 3.94 g/t Au from 542m at the Base of the Resource Pit

Gold X2 Mining Inc. (TSX-V: AUXX) (OTCQB: GSHRF) (FWB: DF8) is pleased to announce the first ... READ MORE

April 13, 2026

Copyright 2026 The Prospector News