VR intersects 317 m at 0.77% CuEq starting at surface, above 419 m of 0.48% CuEq, in 881 m drill hole of continuous polymetallic stockwork veining at New Boston Porphyry-Skarn project, Nevada

          0.77% CuEq* over 317m starting at surface;   0.48% CuEq* over 419 m starting at 460 m, including: 0.98% CuEq* over 31 m at 604 m in diorite porphyry intrusion and skarn, and;   33.4% …

Electra and Ontario Advance North America’s Critical Minerals Future with $17.5 Million Funding Agreement

        Electra Battery Materials Corporation (NASDAQ: ELBM) (TSX-V: ELBM) is pleased to announce that it has finalized definitive agreements with Invest Ontario, an agency of the Government of Ontario, for C$17.5M in previously announced funding to support …

Salazar Reports a High-Grade Tungsten-Silver Intersection at the Pijili Project, Ecuador: 2.00 Metres Grading 1.80% W (2.27% WO3) and 740 g/t Ag

          Re-interpretation of results confirms a newly identified, higher-grade 2-metre interval grading 1.8% W, 740 g/t Ag and 0.63% Cu within the previously disclosed zone in drill hole MERC-011. Copper, silver and tungsten are all listed …

Avanti Gold Grows Footprint of Akyanga Deposit with Multiple High-Grade Intersects Including 3.85 m at 12.30 g/t Au and 3.55 m at 7.73 g/t Au

          HIGHLIGHTS Ongoing 2026 Phase 1 drilling at the Akyanga Deposit continues to intersect multiple zones of gold mineralization within and below the US$1,500/oz pit shell used to constrain the current Mineral Resource Estimate. MSDD0147 returned …