Aldebaran PEA for the Altar Project Reports 48 Year Mine Life, After Tax NPV (8%) of US$2 Billion, and 20.5% IRR

          Aldebaran Resources Inc.  (TSX-V: ALDE) (OTCQX: ADBRF) is pleased to announce the results of a Preliminary Economic Assessment, prepared in accordance with National Instrument 43-101 standards, for the Altar copper-gold project located in San Juan, …

Premier American Uranium Announces Preliminary Economic Assessment and Mineral Resource Update for the Cebolleta Uranium Project, Outlining Project Economics and Framework for Enhancement

          PEA outlines base case production averaging 1.4 Mlb U₃O₈ annually over a 13-year mine life for total output of 18.1 Mlb with an after-tax NPV (8%) of US$83.9M, with strong leverage to higher uranium prices and …

Abitibi Metals 150m Step-Out Extends B26 Western Copper-Gold Zone With 8.16% CuEq Over 3.2m Within 11.0m at 3.93% CuEq, Highlighting Significant Expansion Potential

          Western Plunge Remains Open at Depth and Along Strike, Demonstrating Strong Continuity   Highlights: Western Plunge Copper-Gold Zone Expands – 150 m Step-Out Hole 1274-25-373W1: 3.2m @ 8.16% CuEq (6.26% Cu, 2.21 g/t Au) within …

Cartier Silver Announces Closing of Upsized $2 Million Brokered Private Placement Led by Centurion One Capital

          Cartier Silver Corporation (CSE: CFE) is pleased to announce that it has closed today its previously announced upsized brokered private placement (see press releases dated October 8, 2025 and October 16, 2025) with Centurion One …

Exceptional drilling results support high grade, large scale and continuity of FireFly’s Green Bay Copper-Gold Project

          Consistently strong intersections extend known mineralisation ahead of December quarter Mineral Resource Estimate update; First results from economic studies due early next year   KEY POINTS FireFly made rapid progress during the quarter across the …