Home
Uncategorized

Coro Reports First Infill Drilling Results from its Marimaca Copper Project, Chile

 

 

 

 

 

Coro Mining Corp. (TSX: COP) is pleased to announce the results of the initial 11 reverse circulation holes from the recently completed 57-hole, 11,178-metre infill drill program completed at its Marimaca copper project, located 22km east of the port of Mejillones in the II Region of Chile, (Fig. 1). Previous drill results from Marimaca were released in 2016 and a maiden resource estimate on January 12 2017.

 

 

“We are very satisfied with the results of this first batch of infill holes, which confirm our expectations from the 2016 drilling,” commented Coro President & CEO Luis Tondo. “Although the program continues to define the leachable copper resource, it was exciting to intersect 60 metres at 1.61% total copper in primary sulphide mineralization at the bottom of hole MAR-60. The remaining holes will be released in meaningful batches over the coming weeks and the rig will now commence the exploration drill program described in our news release of November 2 2017. This infill drilling program will inform the Definitive Feasibility Study being conducted on the Marimaca project, both as a requirement for Coro to earn its 75% of this property and as a means of facilitating the fast tracking of Marimaca to copper production.”

 

 

Drilling Results

 

 

Results are shown on Table 1 where %CuT means total copper. Drill hole locations are shown on Fig 2. Collar coordinates are shown on Table 2.

 

 

Table 1: Intersections

 

 

 

Hole TD   From To m %CuT Type
               
MAR-55 200m   110 140 30 1.27 Oxide
               
MAR-56 200m   8 38 30 0.40 Oxide
and 122 150 28 1.04 Oxide
               
MAR-57 200m   176 198 22 0.26 Oxide
               
MAR-58 258m   92 248 156 0.72 Oxide
               
MAR-59 200m   24 142 118 0.68 Oxide

 

 

 

 

Hole TD   From To m %CuT Type
MAR-60 250m   86 122 36 0.22 Oxide
and 132 142 10 0.19 Oxide
142 158 16 0.53 Mixed
190 250 60 1.61 Primary
               
MAR-61 250m   222 246 24 0.31 Oxide
               
MAR-62 250m   188 204 16 0.29 Oxide
and 216 230 14 1.05 Oxide
               
MAR-63 200m   54 100 46 0.74 Oxide
and 110 132 22 0.78 Mixed
               
MAR-64 250m   24 196 172 0.71 Oxide
and 224 236 12 1.75 Enriched
236 250 14 1.00 Oxide
               
MAR-65 200m   36 56 20 0.56 Oxide
and 74 116 42 0.51 Oxide
116 134 18 0.29 Mixed
154 164 10 0.66 Oxide
184 198 14 0.49 Mixed

 

 

 

Sampling and Assay Protocol

 

 

True widths cannot be determined with the information available at this time. Coro RC holes were sampled on a 2 metre continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assay laboratory in Copiapo, Chile for preparation and assaying. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper) by AAS and for acid consumption. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps and sample rejects are stored by Coro for future reference.

 

 

Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 33 years of experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for the purposes of NI 43-101. Alan Stephens, FIMMM, President and CEO, of Coro Mining Corp, a geologist with more than 42 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release.

 

 

Fig 1: Location of Marimaca and Coro Claims

 

 

Fig 2: Marimaca Drill Plan

 

2017 drilling: red
2016 drilling: grey

 

 

Table 2: 2017 Infill Drill Collars

 

 

 

Hole Easting Northing Elevation Azimuth Inclination Depth
MAR-55 375080.94 7435510.84 1108.39 220 -60 200
MAR-56 375091.44 7435517.70 1108.93 310 -60 200
MAR-57 375242.63 7435416.27 1117.39 220 -60 200
MAR-58 374819.74 7435612.62 1132.63 310 -60 258
MAR-59 374822.77 7435604.06 1132.72 220 -60 200
MAR-60 374863.68 7435580.82 1112.46 310 -60 250
MAR-61 375185.75 7435368.85 1109.04 220 -60 250
MAR-62 375160.87 7435319.33 1103.13 220 -60 250
MAR-63 375000.74 7435642.15 1093.17 220 -60 200
MAR-64 374861.45 7435576.02 1112.45 220 -60 250
MAR-65 374902.84 7435648.11 1115.00 220 -60 200

 

 

 

About Coro Mining Corp.:

 

 

Coro’s strategy is to grow a mining business through the discovery, development and operation projects at any stage of development, which are well located with respect to infrastructure and water, have low permitting risk, and have the potential to achieve a short and cost effective timeline to production. The Company’s preference is for open pit heap leach copper projects, where minimizing capital investment and creating profitability are priorities and, where the likely capital cost is financeable relative to the Company’s market capitalization. The Company’s assets include the Marimaca development project; its 65% interest in the SCM Berta company, which owns the Berta mine and Nora plant and the Llancahue prospect.

 

Posted November 9, 2017

MORE or "UNCATEGORIZED"


The Week of November 13th to November 19th, 2017 “A brief Look Back Into Tomorrow”

The new North American trading week began on Monday, November 13t... READ MORE

November 20, 2017

ORENINC INDEX falls as brokered deals dry up

ORENINC INDEX – Monday, November 20th, 2017 North America... READ MORE

November 20, 2017

This Week on The CSE - Short Week Of November 12 - 17

As my week began with a crossing of the iconic Lions Gate ... READ MORE

November 20, 2017

Pistol Bay Creates Blockchain Subsidiary, PB Blockchain Inc.

Pistol Bay Mining Inc. (TSX-V:PST) (Frankfurt :OQS2) is pl... READ MORE

November 20, 2017

Stroud Resources Announces 71% Increase in Measured and Indicated Resources at Santo Domingo, Mexico

Stroud Resources Ltd. (TSX-V:SDR) has filed an updated, independe... READ MORE

November 20, 2017

Copyright 2017 The Prospector News - Site design by Spyderbaby Productions

Coro Reports First Infill Drilling Results from its Marimaca Copper Project, Chile | Prospector News
Uncategorized

Coro Reports First Infill Drilling Results from its Marimaca Copper Project, Chile

 

 

 

 

 

Coro Mining Corp. (TSX: COP) is pleased to announce the results of the initial 11 reverse circulation holes from the recently completed 57-hole, 11,178-metre infill drill program completed at its Marimaca copper project, located 22km east of the port of Mejillones in the II Region of Chile, (Fig. 1). Previous drill results from Marimaca were released in 2016 and a maiden resource estimate on January 12 2017.

 

 

“We are very satisfied with the results of this first batch of infill holes, which confirm our expectations from the 2016 drilling,” commented Coro President & CEO Luis Tondo. “Although the program continues to define the leachable copper resource, it was exciting to intersect 60 metres at 1.61% total copper in primary sulphide mineralization at the bottom of hole MAR-60. The remaining holes will be released in meaningful batches over the coming weeks and the rig will now commence the exploration drill program described in our news release of November 2 2017. This infill drilling program will inform the Definitive Feasibility Study being conducted on the Marimaca project, both as a requirement for Coro to earn its 75% of this property and as a means of facilitating the fast tracking of Marimaca to copper production.”

 

 

Drilling Results

 

 

Results are shown on Table 1 where %CuT means total copper. Drill hole locations are shown on Fig 2. Collar coordinates are shown on Table 2.

 

 

Table 1: Intersections

 

 

 

Hole TD   From To m %CuT Type
               
MAR-55 200m   110 140 30 1.27 Oxide
               
MAR-56 200m   8 38 30 0.40 Oxide
and 122 150 28 1.04 Oxide
               
MAR-57 200m   176 198 22 0.26 Oxide
               
MAR-58 258m   92 248 156 0.72 Oxide
               
MAR-59 200m   24 142 118 0.68 Oxide

 

 

 

 

Hole TD   From To m %CuT Type
MAR-60 250m   86 122 36 0.22 Oxide
and 132 142 10 0.19 Oxide
142 158 16 0.53 Mixed
190 250 60 1.61 Primary
               
MAR-61 250m   222 246 24 0.31 Oxide
               
MAR-62 250m   188 204 16 0.29 Oxide
and 216 230 14 1.05 Oxide
               
MAR-63 200m   54 100 46 0.74 Oxide
and 110 132 22 0.78 Mixed
               
MAR-64 250m   24 196 172 0.71 Oxide
and 224 236 12 1.75 Enriched
236 250 14 1.00 Oxide
               
MAR-65 200m   36 56 20 0.56 Oxide
and 74 116 42 0.51 Oxide
116 134 18 0.29 Mixed
154 164 10 0.66 Oxide
184 198 14 0.49 Mixed

 

 

 

Sampling and Assay Protocol

 

 

True widths cannot be determined with the information available at this time. Coro RC holes were sampled on a 2 metre continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assay laboratory in Copiapo, Chile for preparation and assaying. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper) by AAS and for acid consumption. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps and sample rejects are stored by Coro for future reference.

 

 

Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 33 years of experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for the purposes of NI 43-101. Alan Stephens, FIMMM, President and CEO, of Coro Mining Corp, a geologist with more than 42 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release.

 

 

Fig 1: Location of Marimaca and Coro Claims

 

 

Fig 2: Marimaca Drill Plan

 

2017 drilling: red
2016 drilling: grey

 

 

Table 2: 2017 Infill Drill Collars

 

 

 

Hole Easting Northing Elevation Azimuth Inclination Depth
MAR-55 375080.94 7435510.84 1108.39 220 -60 200
MAR-56 375091.44 7435517.70 1108.93 310 -60 200
MAR-57 375242.63 7435416.27 1117.39 220 -60 200
MAR-58 374819.74 7435612.62 1132.63 310 -60 258
MAR-59 374822.77 7435604.06 1132.72 220 -60 200
MAR-60 374863.68 7435580.82 1112.46 310 -60 250
MAR-61 375185.75 7435368.85 1109.04 220 -60 250
MAR-62 375160.87 7435319.33 1103.13 220 -60 250
MAR-63 375000.74 7435642.15 1093.17 220 -60 200
MAR-64 374861.45 7435576.02 1112.45 220 -60 250
MAR-65 374902.84 7435648.11 1115.00 220 -60 200

 

 

 

About Coro Mining Corp.:

 

 

Coro’s strategy is to grow a mining business through the discovery, development and operation projects at any stage of development, which are well located with respect to infrastructure and water, have low permitting risk, and have the potential to achieve a short and cost effective timeline to production. The Company’s preference is for open pit heap leach copper projects, where minimizing capital investment and creating profitability are priorities and, where the likely capital cost is financeable relative to the Company’s market capitalization. The Company’s assets include the Marimaca development project; its 65% interest in the SCM Berta company, which owns the Berta mine and Nora plant and the Llancahue prospect.

 

Posted November 9, 2017

MORE or "UNCATEGORIZED"


The Week of November 13th to November 19th, 2017 “A brief Look Back Into Tomorrow”

The new North American trading week began on Monday, November 13t... READ MORE

November 20, 2017

ORENINC INDEX falls as brokered deals dry up

ORENINC INDEX – Monday, November 20th, 2017 North America... READ MORE

November 20, 2017

This Week on The CSE - Short Week Of November 12 - 17

As my week began with a crossing of the iconic Lions Gate ... READ MORE

November 20, 2017

Pistol Bay Creates Blockchain Subsidiary, PB Blockchain Inc.

Pistol Bay Mining Inc. (TSX-V:PST) (Frankfurt :OQS2) is pl... READ MORE

November 20, 2017

Stroud Resources Announces 71% Increase in Measured and Indicated Resources at Santo Domingo, Mexico

Stroud Resources Ltd. (TSX-V:SDR) has filed an updated, independe... READ MORE

November 20, 2017

Copyright 2017 The Prospector News - Site design by Spyderbaby Productions