The Prospector News

Kesselrun Resources Announces Channel Sample Results of 7.7 g/t Au, 23.9 g/t Ag over 3.1 metres

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Kesselrun Resources Announces Channel Sample Results of 7.7 g/t Au, 23.9 g/t Ag over 3.1 metres

 

 

 

 

 

Kesselrun Resources Ltd. (TSX-V: KES) is pleased to provide the following update on its 100% owned Huronian Gold Project:

 

 

Ongoing surface exploration at Huronian continues to yield encouraging results. Surface channel sampling results received include 7.7 g/t gold, 23.9 g/t silver over a composite sample length of 3.1 metres on the Fisher zone and 1.1 g/t gold, 8.0 g/t silver over a composite sample length of 8.2 metres on the McKellar zone. The Fisher zone is a previously identified zone of gold and silver mineralization located on one of numerous splays from the main Huronian Shear Zone. The McKellar zone is the southwest strike extension of the historically mined Huronian zone.

 

 

As previously released (see KES NR September 26 and October 11, 2017), a new location of the Huronian Shear Zone and associated splays has been interpreted by Kesselrun’s team. Kesselrun believes that the area holds the potential to host a significant gold resource and its exploration efforts are being executed to test that theory.

 

 

Michael Thompson, P.Geo., President and CEO commented, “The channel sampling of known zones on Huronian is being done to give the team a better understanding of the relationship between alteration, structure and gold mineralization, thus enabling us to better explore for extensions to these zones and entirely new zones. These encouraging results confirm the gold potential of the area”.

 

 

Table 1: Summary of Significant Channel Sample Results – Huronian Project (1)

 

 

 

Channel ID Zone Weighted Grade
Au (g/t)
Weighted Grade
Ag (g/t)
Length
(m)
FC14 Fisher 7.7 23.9 3.1
FC22 Fisher 1.5 5.7 5.8
FC20 Fisher 1.1 7.5 3.5
FC4 Fisher 1.2 2.9 3.4
FC3 Fisher 1.3 4.2 1.6
FC21 Fisher 0.5 1.7 5.7
M12 McKellar 1.1 8.0 8.2
M35 McKellar 1.0 1.2 6.0
M13 McKellar 0.9 9.0 9.0
M17 McKellar 1.0 7.0 3.7
M10 McKellar 0.8 8.5 5.1
M7 McKellar 0.9 7.1 4.1
M23 McKellar 0.8 3.8 3.4
M1 McKellar 1.0 8.0 2.4

 

 

(1) Contiguous sampling lengths are dictated by the exposure of rock available to sample and not necessarily the width of the zone. Channel samples are cut as close to perpendicular to the strike of mineralization as possible but are not representative of true width of the zone.

 

 

Kesselrun holds 4.7M First Mining Finance shares with a current value of over $3M as of market close yesterday which management believes gives the company sufficient means to implement its corporate strategy going forward.

 

 

The Huronian Gold Project consists of 154 unpatented mining claims and four patented mining claims for a total land package of 5,200 hectares. The project is situated in the highly prolific Shebandowan Greenstone Belt located in the Abitibi-Wawa Subprovince approximately 100 km west of Thunder Bay, Ontario along major transportation and power routes.

 

 

The project hosts numerous significant gold zones including the past producing Huronian Mine that produced 29,629 ounces gold and 170,463 ounces silver from 143,724 tons from 1932-1936 (Ontario Ministry of Northern Development and Mines Production Records). The project also covers the southwest strike extension of Wesdome Gold Mine’s Moss Lake Gold Deposit. The Moss Lake Gold Deposit hosts an NI 43-101 compliant resource estimate of 40 million tonnes at a grade of 1.1 g/t (1,377,300 oz Au) Indicated and an additional 50 million tonnes at a grade of 1.1 g/t (1,751,600 oz Au) Inferred (Moss Lake Gold Mines NR February 20, 2013) as well as an NI 43-101 compliant Preliminary Economic Assessment (Moss Lake Gold Mines NR July 29, 2013).

 

 

Michael Thompson, P. Geo., President and CEO of Kesselrun, is the Qualified Person responsible for the project as defined by National Instrument 43-101 and has approved the technical information in this news release.

 

 

QA/QC

 

 

Kesselrun has implemented a quality control program for the trench sampling and planned drill program to ensure best practice in sampling and analysis. The planning, execution and monitoring of Kesselrun’s quality control programs are under the supervision of Michael Thompson, P. Geo.  Kesselrun maintains strict quality assurance/quality control protocols including the systematic insertion of certified standard reference and blank materials into each sample batch. Analyses in this release were performed by Activation Laboratories Ltd. (Actlabs) of Thunder Bay, Ontario with ISO 17025 accreditation. Samples are transported in security sealed bags to Accurassay and all samples were analyzed using industry-standard techniques. Gold and silver was analyzed by a standard 50 gram fire assay with an AAS and a gravimetric finish on samples greater than 5 g/t.

 

 

About Kesselrun Resources Ltd.

 

 

Kesselrun Resources is a Thunder Bay, Ontario-based mineral exploration company focused on growth through property acquisitions and discoveries. Kesselrun’s management team possesses strong geological and exploration expertise with particular experience in Northwest Ontario.

 

Posted October 17, 2017

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Intersects 92.5 m of 11.82% Igneous Phosphate Starting at Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

April 23, 2024

Kuya Silver Provides Update on Mine Start-up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Targeting Commencement of Production at Bethania in H1 2024 ... READ MORE

April 23, 2024

Silvercorp Reports Operational Results and Financial Results Release Date for Fiscal 2024, and Issues Fiscal 2025 Production, Cash Costs, and Capital Expenditure Guidance

Silvercorp Metals Inc. (TSX: SVM) (NYSE American: SVM) reports pr... READ MORE

April 23, 2024

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m; 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m, and 1.32% Li2O over 14m

Excellent follow-up drill results from high-grade discovery holes... READ MORE

April 23, 2024

Solaris Reports First Drilling Results from 2024 Program and Exploration Update, Including 150m of 0.67% CuEq within 384m of 0.51% CuEq and 284m of 0.53% CuEq from Near Surface

Solaris Resources Inc. (TSX: SLS) (NYSE: SLSR) is pleased to repo... READ MORE

April 23, 2024

Copyright 2024 The Prospector News