Home
Uncategorized

Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador

 

 

 

 

 

Toachi Mining Inc., (TSX-V: TIM) is pleased to announce results from on-going drilling at its La Plata gold-rich volcanogenic massive sulphide project, located 100 kilometres southwest of Quito, Ecuador.

 

 

Program Highlights

 

  • Hole CMLP-17-93 intersected 13.91 metres (m) of massive and disseminated sulphide mineralization grading 3.51 grams per tonne (g/t) gold, 64.24 g/t silver, 0.59% copper, 4.11% zinc, and 0.85% lead from 339.43 m in the La Mina South zone of the La Mina deposit.

 

 

Drilling Highlights

 

 

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%)
CMLP-17-93 339.43 353.34 13.91 3.51 64.24 0.59 0.85 4.11

 

 

Core widths in CMLP-17-93 are not considered to be true widths. Gold assay composites were calculated using uncut assays.

 

 

A complete list of all intersections is available in Table 1 below along with a drill hole cross-section and plan map.

 

 

Program Results

 

 

The drill program began in August 2016 continued after the recently completed National Instrument 43-101 resource estimate, is designed to extend known mineralization within the resource area, and around the peripheries of the known mineralized corridor.

 

 

Complete details for the National Instrument 43-101 resource estimate are available in our press release dated September 13, 2017 and available on our website at www.toachimining.com or on SEDAR at www.sedar.com.

 

 

Hole CMLP-17-93 was completed in the northern portion of the La Mina South block, targeting the depth extension of the known VMS mineralization on the eastern flank. Hole CMLP-17-93 was successful in extending mineralization approximately 30 m down dip, and still remains open at depth.

 

 

Jonathan Goodman, President & CEO, stated, “While the overall grade of hole 93 is slightly below the average resource grade, this shows that the mineralization extends beyond the resource shells.”

 

 

La Plata Deposit Geology

 

 

Gold-bearing sulphide mineralization at La Plata occurs as compositional banding composed of chalcopyrite, sphalerite, and pyrite laminae with barite occurring as clasts and also as thin layers.

 

 

Base and precious metal mineralization at La Plata is interpreted to have formed as part of multiple volcanic episodes that created a stacked volcanic-exhalite hydrothermal sequence which is considered favorable for hosting multiple VMS lenses.

 

 

Examples of this exclusive group of gold-rich VMS camps include Rouyn-Noranda, Doyon-Bousquet-LaRonde, and the Flin Flon camps in Canada.

 

 

Toachi’s exploration staff has identified more than 14 discrete exploration targets across the property concessions which extend for more than 9 kilometres, attesting to the potential of this emerging district.

 

 

Within the resource area, modelling of historic and current drill results by Toachi staff has delineated four discrete mineralized zones which define the La Mina North and La Mina South blocks. For a 3-D graphic of the wireframed zones, please visit our website at www.toachimining.com and to review our latest presentation. To date, Toachi has completed 13,747 m of drilling on the La Plata project, mainly on the La Mina deposit.

 

 

The La Plata Project

 

 

Toachi entered into an option agreement with a private Ecuadorian company to earn between a 60% to 75% interest in the La Plata gold-copper-silver-zinc VMS project, located 100 km south of Quito, Ecuador.

 

 

For complete terms of the transaction, please see our press release dated February 11, 2016 which is available on our website at www.toachimining.com or on www.sedar.com.

 

 

La Plata is a gold-rich volcanogenic massive sulphide deposit which was the subject of small scale mining from both an open pit and underground workings from 1975-1981.

 

 

From 1996 to 1998, Cambior Inc., a Canadian mining company, completed 8,628 metres of drilling and a preliminary resource estimate totaling 840,000 tonnes grading 4.8 grams gold per tonne, 4.1% copper, 54.4 grams silver per tonne and 0.7% lead and 4.2% zinc per tonne in 1999, according to a report completed by AMEC Foster Wheeler, a mining consulting firm, in March 2015.

 

 

Following a drill program by Cornerstone Capital Resources Inc., which included 5,933 metres of drilling from 2006-2009, a revised mineral resource estimate totaling 913,977 tonnes grading 8.01 grams gold per tonne, 88.3 grams silver per tonne, 5.01% copper, 6.71% zinc and 0.78% lead per tonne in the inferred category was completed.

 

 

The resource estimates described above are historical estimates as defined by National Instrument 43-101 — Standards of Disclosure for Mineral Projects S.2.4 (“NI 43-101”).

 

 

Toachi has not completed the work required to independently analyze and verify the results of the previous operators nor has a qualified person completed sufficient work to classify the estimates as current mineral resources or mineral reserves. With respect to the Cambior estimate, the Company is also not aware of what categories were used in the estimate. As a result, Toachi is not treating these estimates as current mineral resources or mineral reserves.

 

 

The Company believes these historic results provide an indication of the potential of the property and are relevant from an on-going exploration perspective.

 

 

QA/QC Sampling and Core Sampling Protocols

 

 

Before sampling, a centreline, representing bottom of hole (or a reference line when this is not known) is marked on the drill core. The core is cut and sampled, always sampling the right-hand side of the drill core. Samples are selected based on logged geological features, such as rock type, mineralization, alteration, veining etc. Sample length does not exceed 1.2 m nor is smaller than 20 cm. In areas of similar geological characteristics, sample length is, in general, 1 m.

 

 

A total of 10% of the samples submitted are certified blanks and standards and field duplicates with, as a minimum, one blank submitted at the beginning of each sample batch. Certified standards are submitted at an average of 6% of the samples submitted. Field duplicates are taken at a rate of 1 in 20 of the samples taken.

 

 

Drill hole analysis was completed by MS Analytical in Canada.

 

 

Analysis was completed by MS Analytical in Canada with preparation performed by Ecuadorian partner, LAC y Asociados. Both LAC y Asociados and MSA are ISO 9001:2008 registered companies. MS Analytical also meets the requirements as outlined in ISO/IEC 17025.

 

 

Qualified Person

 

 

Phil Fox, MAIG, a Qualified Person as defined by NI 43-101, has reviewed and approved the contents of this press release.

 

 

About Toachi Mining Inc.

 

 

Toachi brings a disciplined and veteran team of project managers together with a high grade gold-copper-silver-zinc project at La Plata in Ecuador. Toachi is focused on and committed to the development of advanced stage mineral projects throughout the Americas using industry best practices combined with a strong social license from local communities. Toachi Mining has 60,966,435 shares issued and outstanding.

 

Posted October 11, 2017

MORE or "UNCATEGORIZED"


Oreninc - "Top Ten November 2017"

November 2017 saw 107 deals close in the Canadian financial marke... READ MORE

December 15, 2017

This Week on The CSE - December 4 - 8

As the week begins we are reminded that December 6 is the 100 ann... READ MORE

December 15, 2017

Millrock Closes Non-Brokered Private Placement

Millrock Resources Inc. (TSX-V: MRO) (OTCQX: MLRKF) reports that ... READ MORE

December 15, 2017

K92 Announces Further High Grade Kora Exploration Drill Results from Kora Northern Extension including First Results from Second Drill Cuddy

K92 Mining Inc. (TSX-V: KNT) is pleased to announce results from ... READ MORE

December 15, 2017

Dynacor Produces 7,253 oz of Gold in November 2017

Dynacor Gold Mines Inc.(TSX:DNG) (OTC:DNGDF) is pleased to ... READ MORE

December 15, 2017

Copyright 2017 The Prospector News - Site design by Spyderbaby Productions

Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador | Prospector News
Uncategorized

Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador

 

 

 

 

 

Toachi Mining Inc., (TSX-V: TIM) is pleased to announce results from on-going drilling at its La Plata gold-rich volcanogenic massive sulphide project, located 100 kilometres southwest of Quito, Ecuador.

 

 

Program Highlights

 

  • Hole CMLP-17-93 intersected 13.91 metres (m) of massive and disseminated sulphide mineralization grading 3.51 grams per tonne (g/t) gold, 64.24 g/t silver, 0.59% copper, 4.11% zinc, and 0.85% lead from 339.43 m in the La Mina South zone of the La Mina deposit.

 

 

Drilling Highlights

 

 

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%)
CMLP-17-93 339.43 353.34 13.91 3.51 64.24 0.59 0.85 4.11

 

 

Core widths in CMLP-17-93 are not considered to be true widths. Gold assay composites were calculated using uncut assays.

 

 

A complete list of all intersections is available in Table 1 below along with a drill hole cross-section and plan map.

 

 

Program Results

 

 

The drill program began in August 2016 continued after the recently completed National Instrument 43-101 resource estimate, is designed to extend known mineralization within the resource area, and around the peripheries of the known mineralized corridor.

 

 

Complete details for the National Instrument 43-101 resource estimate are available in our press release dated September 13, 2017 and available on our website at www.toachimining.com or on SEDAR at www.sedar.com.

 

 

Hole CMLP-17-93 was completed in the northern portion of the La Mina South block, targeting the depth extension of the known VMS mineralization on the eastern flank. Hole CMLP-17-93 was successful in extending mineralization approximately 30 m down dip, and still remains open at depth.

 

 

Jonathan Goodman, President & CEO, stated, “While the overall grade of hole 93 is slightly below the average resource grade, this shows that the mineralization extends beyond the resource shells.”

 

 

La Plata Deposit Geology

 

 

Gold-bearing sulphide mineralization at La Plata occurs as compositional banding composed of chalcopyrite, sphalerite, and pyrite laminae with barite occurring as clasts and also as thin layers.

 

 

Base and precious metal mineralization at La Plata is interpreted to have formed as part of multiple volcanic episodes that created a stacked volcanic-exhalite hydrothermal sequence which is considered favorable for hosting multiple VMS lenses.

 

 

Examples of this exclusive group of gold-rich VMS camps include Rouyn-Noranda, Doyon-Bousquet-LaRonde, and the Flin Flon camps in Canada.

 

 

Toachi’s exploration staff has identified more than 14 discrete exploration targets across the property concessions which extend for more than 9 kilometres, attesting to the potential of this emerging district.

 

 

Within the resource area, modelling of historic and current drill results by Toachi staff has delineated four discrete mineralized zones which define the La Mina North and La Mina South blocks. For a 3-D graphic of the wireframed zones, please visit our website at www.toachimining.com and to review our latest presentation. To date, Toachi has completed 13,747 m of drilling on the La Plata project, mainly on the La Mina deposit.

 

 

The La Plata Project

 

 

Toachi entered into an option agreement with a private Ecuadorian company to earn between a 60% to 75% interest in the La Plata gold-copper-silver-zinc VMS project, located 100 km south of Quito, Ecuador.

 

 

For complete terms of the transaction, please see our press release dated February 11, 2016 which is available on our website at www.toachimining.com or on www.sedar.com.

 

 

La Plata is a gold-rich volcanogenic massive sulphide deposit which was the subject of small scale mining from both an open pit and underground workings from 1975-1981.

 

 

From 1996 to 1998, Cambior Inc., a Canadian mining company, completed 8,628 metres of drilling and a preliminary resource estimate totaling 840,000 tonnes grading 4.8 grams gold per tonne, 4.1% copper, 54.4 grams silver per tonne and 0.7% lead and 4.2% zinc per tonne in 1999, according to a report completed by AMEC Foster Wheeler, a mining consulting firm, in March 2015.

 

 

Following a drill program by Cornerstone Capital Resources Inc., which included 5,933 metres of drilling from 2006-2009, a revised mineral resource estimate totaling 913,977 tonnes grading 8.01 grams gold per tonne, 88.3 grams silver per tonne, 5.01% copper, 6.71% zinc and 0.78% lead per tonne in the inferred category was completed.

 

 

The resource estimates described above are historical estimates as defined by National Instrument 43-101 — Standards of Disclosure for Mineral Projects S.2.4 (“NI 43-101”).

 

 

Toachi has not completed the work required to independently analyze and verify the results of the previous operators nor has a qualified person completed sufficient work to classify the estimates as current mineral resources or mineral reserves. With respect to the Cambior estimate, the Company is also not aware of what categories were used in the estimate. As a result, Toachi is not treating these estimates as current mineral resources or mineral reserves.

 

 

The Company believes these historic results provide an indication of the potential of the property and are relevant from an on-going exploration perspective.

 

 

QA/QC Sampling and Core Sampling Protocols

 

 

Before sampling, a centreline, representing bottom of hole (or a reference line when this is not known) is marked on the drill core. The core is cut and sampled, always sampling the right-hand side of the drill core. Samples are selected based on logged geological features, such as rock type, mineralization, alteration, veining etc. Sample length does not exceed 1.2 m nor is smaller than 20 cm. In areas of similar geological characteristics, sample length is, in general, 1 m.

 

 

A total of 10% of the samples submitted are certified blanks and standards and field duplicates with, as a minimum, one blank submitted at the beginning of each sample batch. Certified standards are submitted at an average of 6% of the samples submitted. Field duplicates are taken at a rate of 1 in 20 of the samples taken.

 

 

Drill hole analysis was completed by MS Analytical in Canada.

 

 

Analysis was completed by MS Analytical in Canada with preparation performed by Ecuadorian partner, LAC y Asociados. Both LAC y Asociados and MSA are ISO 9001:2008 registered companies. MS Analytical also meets the requirements as outlined in ISO/IEC 17025.

 

 

Qualified Person

 

 

Phil Fox, MAIG, a Qualified Person as defined by NI 43-101, has reviewed and approved the contents of this press release.

 

 

About Toachi Mining Inc.

 

 

Toachi brings a disciplined and veteran team of project managers together with a high grade gold-copper-silver-zinc project at La Plata in Ecuador. Toachi is focused on and committed to the development of advanced stage mineral projects throughout the Americas using industry best practices combined with a strong social license from local communities. Toachi Mining has 60,966,435 shares issued and outstanding.

 

Posted October 11, 2017

MORE or "UNCATEGORIZED"


Oreninc - "Top Ten November 2017"

November 2017 saw 107 deals close in the Canadian financial marke... READ MORE

December 15, 2017

This Week on The CSE - December 4 - 8

As the week begins we are reminded that December 6 is the 100 ann... READ MORE

December 15, 2017

Millrock Closes Non-Brokered Private Placement

Millrock Resources Inc. (TSX-V: MRO) (OTCQX: MLRKF) reports that ... READ MORE

December 15, 2017

K92 Announces Further High Grade Kora Exploration Drill Results from Kora Northern Extension including First Results from Second Drill Cuddy

K92 Mining Inc. (TSX-V: KNT) is pleased to announce results from ... READ MORE

December 15, 2017

Dynacor Produces 7,253 oz of Gold in November 2017

Dynacor Gold Mines Inc.(TSX:DNG) (OTC:DNGDF) is pleased to ... READ MORE

December 15, 2017

Copyright 2017 The Prospector News - Site design by Spyderbaby Productions